Italian Naval Construction Summary: 1943 Q4
Patria e Onore
Factories: Italy
25 Total factories.
20 Factories dedicated to production of 20,000 tons of Naval material.
5 factories (designated) dedicated to the production of IP for a total of 0.5IP. 0.5 bonus IP for factory dedication.
Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.
Material Transactions:
609t rolled over from Q4/42
2000t from the East African State to Italy
22609 tons available for use
Naval Construction and Refit Report
Italy
OTO La Spezia
- Type 3 Slipway
- Type 3 Slipway
- Type 3 Drydock: Aircraft Carrier
Aquila drydocked for reconstruction: receives 2001t. 8004t of 12011t assembled. 4006t required, estimated refloating and estimated completion Q2/44.
- Type 3 Drydock: Cruiser
Francesco Ferrucio drydocked for reconstruction: receives 1071t. 3213t of 3213t assembled. 0t required, completed. Trials begin Q1/44.
- Type 1 Slipway
- Type 1.5 Drydock:
Dockside:
Orlando Taranto
- Type 4 Slipway: Battleship
Dante Alighieri receives 3000t on Orlando Taranto's Class 4 slipway. 15000t of 45,275t assembled. 30275t required, estimated launch Q4/44 and estimated completion Q3/46.
- Type 4 Drydock
- Type 3 Slipway
- Type 3 Drydock
- Type 3 Drydock
- Type 1 Slipway
- Type 1.5 Drydock:
Dockside:
- Aircraft Carrier
Marcantonio Colona receives 3000t. 35000t of 37911t assembled. 2911t required, estimated completion Q1/44.
- Cruiser
Coatit refit to 152mm automatic test ship: receives 965t. 1930t of 1930t assembled. 0t required, completed. Trials begin Q4/43.
Napoli di Castellammare
- Type 3 Slipway:
- Type 3 Drydock:
- Type 1 Slipway
- Type 1.5 Drydock
Dockside:
-Cruiser
Sardinia receives 1625t. 6500t of 9750t assembled. 3250t required, estimated completion Q2/44.
Marghera Fincantieri, Venezia
- Type 3 Slipway:
- Type 3 Slipway
- Type 3 Drydock: Cruiser
Giovanni Bausan drydocked for conversion to a aircraft carrier: receives 1475t. 5900t of 7378t assembled. 1478t required, estimated refloating and estimated completion Q1/44.
- Type 1 Slipway
- Type 1 Drydock
Dockside:
-Cruiser
Sicily receives 1625t. 6500t of 9750t assembled. 3250t required, estimated completion Q2/44.
CRDA Trieste
-Type 4 slipway: Battleship
Leonardo da Vinci receives 3000t while on one of CRDA Trieste's Class 4 slipways. 24000t of 45,275t assembled. 24275t required, launched Q4/43 and estimated completion Q4/45.
-Type 4 slipway:
Dockside:
Armored Cruiser
Regina Elena receives 3000t. 24000t of 30000t assembled. 6000t required, estimated completion Q2/44.
Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway:
- Type 3 Slipway:
- Type 3 Drydock
- Type 1 Slipway
Dockside:
-Destroyer
Antonio Mosto refit commenced: receives 247t . 247t of 247t assembled. 0t required, completed. Trials begin Q1/44.
-Destroyer
Ippolito Nievo refit commenced: receives 247t . 247t of 247t assembled. 0t required, completed. Trials begin Q1/44.
-Destroyer
Francesco Nullo refit commenced: receives 247t . 247t of 247t assembled. 0t required, completed. Trials begin Q1/44.
-Destroyer
Simone Schiaffino refit commenced: receives 247t . 247t of 247t assembled. 0t required, completed. Trials begin Q1/44.
Fincantieri Cagliari
- Type 3 Drydock:
- Type 1 Drydock
Dockside:
East African State
Massawa
- Type 3 Drydock: Expanding
- Type 1 Slipway
- Type 1 Drydock
Dockside:
Mogadishu
-Type 1 Drydock
Scraping Report
No ships scraped
Ships on Trials
Destroyers
l'Unità,
Solidarietà,
Armonia,
Concordia,
Integrità,
Incorrotti,
Purità,
Rosolino Pilo,
Giuseppe Cesare Abba,
Pilade Bronzetti,
Giuseppe Missori
Aircraft Carrier
Vettor Pisani
Cruisers
Genoa,
Milan,
San Calepodio,
San Calimero
Current Order of Battle: Italian Navy Note: Subject to error correction.
BB. 7(0)+2
CV. 12(1)+1
ACR. 9(0)+1
CL. 21(0)+2
DD. 68(4)+0
Submarines. 99(0)+0
Escorts. 122(0)+0
MAS. 70(0)+0
Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS
Infrastructure Projects
Class 3 Drydock at Massawa upgraded to Class 4 (1 IP)
Summary of Expenditures
21750t out of 22609t used in Naval construction.
0t out of 22609 t used in payments.
1 IP used in Infrastructure Projects
21750t expended Q4/43.
859t rollover to Q1/44.