You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, September 3rd 2013, 8:02pm

Republic of Italy Q2/43

Italian Naval Construction Summary: 1943 Q2

Patria e Onore


Factories: Italy
25 Total factories.
20 Factories dedicated to production of 20,000 tons of Naval material.
5 factories (designated) dedicated to the production of IP for a total of 0.5IP.

Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.

Material Transactions:
6423t rolled over from Q4/42
2000t from the East African State to Italy
2099 recovered from scraping.

30522 tons available for use

Naval Construction and Refit Report
Italy

OTO La Spezia
- Type 3 Slipway
- Type 3 Slipway
- Type 3 Drydock: Aircraft Carrier Aquila drydocked for reconstruction: receives 2001t. 4002t of 12011t assembled. 8009t required, estimated refloating and estimated completion Q2/44.
- Type 3 Drydock: Cruiser Francesco Ferrucio drydocked for reconstruction: receives 1071t. 1071t of 3213t assembled. 2142t required, estimated refloating and estimated completion Q4/43.
- Type 1 Slipway
- Type 1 Drydock: Expanding

Dockside:
- Cruiser Genoa receives 1625t. 9750t of 9750t assembled. 0t required, completed. Trials begin Q3/43.
- Destroyer l'Unità receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.

Orlando Taranto
- Type 4 Slipway: Battleship Dante Alighieri receives 3000t on Orlando Taranto's Class 4 slipway. 6000t of 45,275t assembled. 39275t required, estimated launch Q4/44 and estimated completion Q3/46.
- Type 4 Drydock
- Type 3 Slipway
- Type 3 Drydock
- Type 3 Drydock
- Type 1 Slipway
- Type 1 Drydock

Dockside:
- Aircraft Carrier Marcantonio Colona receives 3000t. 24000t of 37911t assembled. 8911t required, estimated completion Q1/44.
- Destroyer Solidarietà receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.

Napoli di Castellammare
- Type 3 Slipway: Cruiser Sardinia receives 1625t. 3250t of 9750t assembled. 6500t required, estimated launch Q3/43 and estimated completion Q2/44. completion Q2/44.
- Type 3 Drydock:
- Type 1 Slipway
- Type 1.5 Drydock

Dockside:
- Destroyer Integrità receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
- Destroyer Concordia receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.

Marghera Fincantieri, Venezia
- Type 3 Slipway: Cruiser Sicily receives 1625t. 3250t of 9750t assembled. 6500t required, estimated launch Q3/43 and estimated completion Q2/44.
- Type 3 Slipway
- Type 3 Drydock: Cruiser Giovanni Bausan drydocked for conversion to a aircraft carrier: receives 1475t. 2950t of 7378t assembled. 4428t required, estimated refloating and estimated completion Q1/44.
- Type 1 Slipway
- Type 1 Drydock

Dockside:
- Cruiser Milan receives 1625t while freefloating at Marghera Fincantieri. 8125t of 9750t assembled. 1625t required, estimated completion Q2/43.
- Destroyer Armonia receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.

CRDA Trieste
- Type 4 slipway: Battleship Leonardo da Vinci receives 3000t while on one of CRDA Trieste's Class 4 slipways. 15000t of 45,275t assembled. 30275t required, estimated launch Q4/43 and estimated completion Q4/45.
- Type 4 slipway:

Dockside:
Armored Cruiser Regina Elena receives 3000t. 18000t of 30000t assembled. 12000t required, estimated completion Q2/44.

Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway:
- Type 3 Slipway: Cruiser San Calepodio drydocked for reconstruction: receives 1151t . 2302t of 3453t assembled. 1151t required, estimated refloating and estimated completion Q3/43.
- Type 3 Drydock
- Type 1 Slipway

Dockside:
- Destroyer Purità receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.

Fincantieri Cagliari
- Type 3 Drydock: Cruiser San Calimero drydocked for reconstruction: receives 1151t . 2302t of 3453t assembled. 1151t required, estimated refloating and estimated completion Q3/43.
- Type 1 Drydock

East African State

Factories: 2

Massawa
- Type 3 Drydock
- Type 1 Slipway
- Type 1 Drydock

Dockside:
- Destroyer Incorrotti receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.

Mogadishu
Type 1 Drydock

Scraping Report
No ships scraped

Ships on Trials
Destroyers Venszia, Ascaro, Pontiere, Ardente, Ardito, Animoso, Audace, Impavido, Indomito, Impetuoso, Insidioso
Aircraft Carrier Vettor Pisani

Current Order of Battle: Italian Navy Note: Subject to error correction.
BB. 7(0)+2
CV. 12(1)+1
ACR. 9(0)+1
CL. 19(2)+4
DD. 61(4)+7
Submarines. 99(0)+0
Escorts. 122(0)+0
MAS. 70(0)+0

Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS

Infrastructure Projects
Class 1 Drydock at Orlando Taranto upgraded to Class 1.5 (.5 IP)

Summary of Expenditures
29290t out of 37375t used in Naval construction.
0t out of 37139 t used in payments.
.5 IP used in Infrastructure Projects
29290t expended Q2/43.
1232t rollover to Q2/43.
You smug-faced crowds with kindling eye
Who cheer when soldier lads march by,
Sneak home and pray you'll never know
The hell where youth and laughter go.
-Siegfried Sassoon