Italian Naval Construction Summary: 1943 Q2
Patria e Onore
Factories: Italy
25 Total factories.
20 Factories dedicated to production of 20,000 tons of Naval material.
5 factories (designated) dedicated to the production of IP for a total of 0.5IP.
Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.
Material Transactions:
6423t rolled over from Q4/42
2000t from the East African State to Italy
2099 recovered from scraping.
30522 tons available for use
Naval Construction and Refit Report
Italy
OTO La Spezia
- Type 3 Slipway
- Type 3 Slipway
- Type 3 Drydock: Aircraft Carrier
Aquila drydocked for reconstruction: receives 2001t. 4002t of 12011t assembled. 8009t required, estimated refloating and estimated completion Q2/44.
- Type 3 Drydock: Cruiser
Francesco Ferrucio drydocked for reconstruction: receives 1071t. 1071t of 3213t assembled. 2142t required, estimated refloating and estimated completion Q4/43.
- Type 1 Slipway
- Type 1 Drydock: Expanding
Dockside:
- Cruiser
Genoa receives 1625t. 9750t of 9750t assembled. 0t required, completed. Trials begin Q3/43.
- Destroyer
l'Unità receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
Orlando Taranto
- Type 4 Slipway: Battleship
Dante Alighieri receives 3000t on Orlando Taranto's Class 4 slipway. 6000t of 45,275t assembled. 39275t required, estimated launch Q4/44 and estimated completion Q3/46.
- Type 4 Drydock
- Type 3 Slipway
- Type 3 Drydock
- Type 3 Drydock
- Type 1 Slipway
- Type 1 Drydock
Dockside:
- Aircraft Carrier
Marcantonio Colona receives 3000t. 24000t of 37911t assembled. 8911t required, estimated completion Q1/44.
- Destroyer
Solidarietà receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
Napoli di Castellammare
- Type 3 Slipway: Cruiser
Sardinia receives 1625t. 3250t of 9750t assembled. 6500t required, estimated launch Q3/43 and estimated completion Q2/44. completion Q2/44.
- Type 3 Drydock:
- Type 1 Slipway
- Type 1.5 Drydock
Dockside:
- Destroyer
Integrità receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
- Destroyer
Concordia receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
Marghera Fincantieri, Venezia
- Type 3 Slipway: Cruiser
Sicily receives 1625t. 3250t of 9750t assembled. 6500t required, estimated launch Q3/43 and estimated completion Q2/44.
- Type 3 Slipway
- Type 3 Drydock: Cruiser
Giovanni Bausan drydocked for conversion to a aircraft carrier: receives 1475t. 2950t of 7378t assembled. 4428t required, estimated refloating and estimated completion Q1/44.
- Type 1 Slipway
- Type 1 Drydock
Dockside:
- Cruiser
Milan receives 1625t while freefloating at Marghera Fincantieri. 8125t of 9750t assembled. 1625t required, estimated completion Q2/43.
- Destroyer
Armonia receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
CRDA Trieste
- Type 4 slipway: Battleship
Leonardo da Vinci receives 3000t while on one of CRDA Trieste's Class 4 slipways. 15000t of 45,275t assembled. 30275t required, estimated launch Q4/43 and estimated completion Q4/45.
- Type 4 slipway:
Dockside:
Armored Cruiser
Regina Elena receives 3000t. 18000t of 30000t assembled. 12000t required, estimated completion Q2/44.
Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway:
- Type 3 Slipway: Cruiser
San Calepodio drydocked for reconstruction: receives 1151t . 2302t of 3453t assembled. 1151t required, estimated refloating and estimated completion Q3/43.
- Type 3 Drydock
- Type 1 Slipway
Dockside:
- Destroyer
Purità receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
Fincantieri Cagliari
- Type 3 Drydock: Cruiser
San Calimero drydocked for reconstruction: receives 1151t . 2302t of 3453t assembled. 1151t required, estimated refloating and estimated completion Q3/43.
- Type 1 Drydock
East African State
Factories: 2
Massawa
- Type 3 Drydock
- Type 1 Slipway
- Type 1 Drydock
Dockside:
- Destroyer
Incorrotti receives 563t. 2250t of 2250t assembled. 0t required, completed. Trials begin Q3/43.
Mogadishu
Type 1 Drydock
Scraping Report
No ships scraped
Ships on Trials
Destroyers
Venszia,
Ascaro,
Pontiere,
Ardente,
Ardito,
Animoso,
Audace,
Impavido,
Indomito,
Impetuoso,
Insidioso
Aircraft Carrier
Vettor Pisani
Current Order of Battle: Italian Navy Note: Subject to error correction.
BB. 7(0)+2
CV. 12(1)+1
ACR. 9(0)+1
CL. 19(2)+4
DD. 61(4)+7
Submarines. 99(0)+0
Escorts. 122(0)+0
MAS. 70(0)+0
Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS
Infrastructure Projects
Class 1 Drydock at Orlando Taranto upgraded to Class 1.5 (.5 IP)
Summary of Expenditures
29290t out of 37375t used in Naval construction.
0t out of 37139 t used in payments.
.5 IP used in Infrastructure Projects
29290t expended Q2/43.
1232t rollover to Q2/43.