Italian Naval Construction Summary: 1943 Q1
Patria e Onore
Factories
25 Total factories.
20 Factories dedicated to production of 20,000 tons of Naval material.
5 factories (designated) dedicated to the production of IP for a total of 0.5IP.
Material Transactions:
12532t rolled over from Q4/42
2000t acquired from the East African State
2843 recovered from scraping.
37375 tons available for use
Naval Construction and Refit Report
Aircraft Carrier
Marcantonio Colona receives 3000t while freefloating at Orlando Taranto. 21000t of 37911t assembled. 10911t required, estimated completion Q1/44.
Battleship
Leonardo da Vinci receives 3000t while on one of CRDA Trieste's Class 4 slipways. 15000t of 45,275t assembled. 30275t required, estimated launch Q4/43 and estimated completion Q4/45.
Armored Cruiser
Regina Elena receives 3000t while on one of CRDA Trieste's Class 4 slipways. 15000t of 30000t assembled. 15000t required, launched Q1/43 and estimated completion Q2/44.
Cruiser
Genoa receives 1625t while freefloating at OTO La Spezia. 8125t of 9750t assembled. 1625t required, estimated completion Q2/43.
Cruiser
Milan receives 1625t while freefloating at Marghera Fincantieri. 8125t of 9750t assembled. 1625t required, estimated completion Q2/43.
Cruiser
Vettor Pisani receives 1478t while in Napoli di Castellammare's Class 3 drydock. 7378t of 7378t assembled. 0t required. Refloated and completed, trials begin Q2/43
Destroyer
l'Unità receives 562t while freefloating at OTO La Spezia. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Destroyer
Solidarietà receives 562t while freefloating at Orlando Taranto. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Destroyer
Integrità receives 562t while freefloating at Napoli di Castellammare. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Destroyer
Concordia receives 562t while freefloating at Napoli di Castellammare. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Destroyer
Armonia receives 562t while freefloating at Marghera Fincantieri. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Destroyer
Purità receives 562t while freefloating at Messia di Castellammare. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Destroyer
Incorrotti receives 562t while freefloating at Massawa. 1687t of 2250t assembled. 563t required, estimated completion Q2/43.
Battleship
Dante Alighieri receives 3000t on Orlando Taranto's Class 4 slipway. 6000t of 45,275t assembled. 39275t required, estimated launch Q4/44 and estimated completion Q3/46.
Aircraft Carrier
Aquila drydocked and reconstruction is started: receives 2001t while in OTO La Spezia's Class 3 drydock. 2001t of 12011t assembled. 10010t required, estimated refloating and estimated completion Q2/44.
Destroyer
Impavido refit commenced: receives 315.5t while freefloating at OTO La Spezia. 315.5t of 315.5t assembled. 0t required. Completed, trials begin Q2/43.
Destroyer
Indomito refit commenced: receives 315.5t while freefloating at OTO La Spezia. 315.5t of 315.5t assembled. 0t required. Completed, trials begin Q2/43.
Destroyer
Impetuoso refit commenced: receives 315.5t while freefloating at OTO La Spezia. 315.5t of 315.5t assembled. 0t required. Completed, trials begin Q2/43.
Destroyer
Insidioso refit commenced: receives 315.5t while freefloating at OTO La Spezia. 315.5t of 315.5t assembled. 0t required. Completed, trials begin Q2/43.
Cruiser
Sardinia layed down: receives 1625t on Napoli di Castellammare's Class 3 slipway. 1625t of 9750t assembled. 8125t required, estimated launch Q3/43 and estimated completion Q2/44.
Cruiser
Sicily layed down: receives 1625t on Messia di Castellammare's Class 3 slipway. 1625t of 9750t assembled. 8125t required, estimated launch Q3/43 and estimated completion Q2/44.
Cruiser
Giovanni Bausan drydocked and conversion to a aircraft carrier is commenced: receives 1475t in Marghera Fincantieri's Class 3 drydock. 1475t of 7378t assembled. 5903t required, estimated refloating and estimated completion Q1/44.
Cruiser
San Calimero drydocked and reconstruction is commenced: receives 1151t in Fincantieri Cagliagi's Class 3 drydock. 1151t of 3453t assembled. 2302t required, estimated refloating and estimated completion Q3/43.
Cruiser
San Calepodio drydocked and reconstruction is commenced: receives 1151t in Messia di Castellammare's Class 3 drydock. 1151t of 3453t assembled. 2302t required, estimated refloating and estimated completion Q3/43.
Scraping Report
No ships scraped
Ships on Trials
Submarines
U-9 though
U-14
Destroyers
Venszia,
Ascaro,
Pontiere,
Ardente,
Ardito,
Animoso,
Audace
Infrastructure Projects
Class 1 Drydock at Messia di Castellammare upgraded to Class 1.5 (.5 IP)
Current Order of Battle Note: Subject to error correction.
BB. 7(0)+2
CV. 11(2)+1
ACR. 9(0)+1
CL. 19(2)+4
DD. 61(4)+7
Submarines. 99(0)+0
Escorts. 122(0)+0
MAS. 70(0)+0
East African State Activities
2000t of naval material produced and sent to Italy
EAS Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS
Summary of Expenditures
30952t out of 37375t used in Naval construction.
0t out of 37139 t used in payments.
.5 IP used in Infrastructure Projects
30952t expended Q1/43.
6423t rollover to Q2/43.