[SIZE=3]
Industrial Allocation[/SIZE]
- 9/9 factories producing 9,000t materials.
- 4,390 tons from stockpile.
- 0 tons from transactions
- 1,013 tons from scrapping
- 14,403 tons materials total.
- 9,630 tons used.
- 4,773 tons stored for Q2/44.
- 0/9 factories dedicated to infrastructure.
[SIZE=3]
Infrastructure Development[/SIZE]
None at present
[SIZE=3]
Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Battleship
Almirante Latorre scrapping. 3042 / 4055 tons recovered Q1/1944.
S3.5: CA-04
Almirante Latorre laid down April 1st, 1943. 2400 tons added Q1/44 for a total of 9,600 / 14,525 tons. 4,925 / 14,525 tons remaining. Ship launched on January 15th, 1944. Ship will complete on February 6th, 1944.
D2.5: CL-06
Atacama completes partial reconstruction. 4,598 tons required. 98 tons added Q1/44 for a total of 4598 / 4598. Completed.
D2: DD-62
Almirante Williams laid down January 1st, 1944. 550 tons added Q1/44 for a total of 550 / 2200 tons. 1650 / 2200 tons remaining. Ship launched on May 15th 1944. Ship will complete on December 6th, 1944.
S2: DDE-28
Machado laid down October 1st, 1943. 325 tons added Q1/44 for a total of 650 / 1,195 tons. 545 / 1195 tons remaining. Ship launched on February 3rd 1944. Ship will complete on August 6th, 1944.
S1: DD-63
Almirante Riveros laid down January 1st, 1944. 550 tons added Q1/44 for a total of 550 / 2200 tons. 1650 / 2200 tons remaining. Ship launched on May 15th 1944. Ship will complete on December 6th, 1944.
D0: Idle
Dockside:
- BC-11
Almirante Cochrane laid down August 1st, 1941. 3,000 tons added Q1/44 for a total of 26,700 / 28,385 tons. 1,685 / 28,385 tons remaining until completion on August 12th, 1944. Ship launched December 30th, 1942.
- DL-11
Teniente Estrada undergoing major refit. 110 tons added Q1/1944 for a total of 110 / 110 tons. 0/110 tons remaining until completion. Reconstruction completed.
- DDE-26
Téllez laid down April 1st, 1943. 220 tons added Q1/44 for a total of 1,195 / 1,195 tons. 0 / 1195 tons remaining. Ship launched on August 3rd 1943. Ship completed on February 6th, 1944.
- DDE-27
Bravo laid down July 1st, 1943. 325 tons added Q1/44 for a total of 975 / 1,195 tons. 220 / 1195 tons remaining. Ship launched on November 3rd 1943. Ship will complete on May 6th, 1944.
ASMAR - Astillero de Valparaíso (Valparaiso):
S1: DDE-29
Díaz laid down January 1st, 1944. 325 tons added Q1/44 for a total of 325 / 1,195 tons. 870 / 1195 tons remaining. Ship launched on May 3rd 1944. Ship will complete on November 6th, 1944.
S1: Idle
D1: DD-26
General Escala undergoing partial reconstruction. 342 tons added Q1/1944 for a total of 342/342 tons. 0 / 342 tons remaining until completion. Reconstruction completed.
Dockside:
None
ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper
YDM-9 laid down January 1st, 1944. 190 tons added Q1/1944 for a total of 180 / 180. Completed and launched on January 31st, 1944.
S0: Submarine chaser
Loa laid down November 1st, 1943. 250 tons added Q1/1944 for a total of 250 / 250. Ship launched February 20th, 1944. Ship will complete on May 8th, 1944.
Dockside:
- N/A
ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle
Dockside:
None
from factories:
- N/A
On Trials
- CLD-22
Talcahuano completes six months of builders trials.
- CLD-23
Abtao continues six months of builders trials.
- DDE-25
Bolados continues six months of builders trials.
- DDE-26
Téllez begins six months of builders trials.
- LSM-02
Orompello continues six months of builders trials.
Scrapping
- Total tonnage in recycling until Q1/1944: (1x1013) = 1013 tons
- Total tonnage in recycling until Q2/1944: (1x1014) = 1014 tons
- Total tonnage in recycling until Q3/1944: (1x1014) = 1014 tons
- Total tonnage in recycling until Q4/1944: (1x1014) = 1014 tons
[SIZE=3]
Transactions[/SIZE]
- 895 tons to Argentina: 195 tons design fee plus 700 tons for construction of minelayer
21 de Mayo.
- 50 tons to the United States for design of
Loa-class submarine chaser.
[SIZE=3]
Other Notes[/SIZE]
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
- "Coati": Target date of mid-1944 set. Project is cancelled in favor of Sisdef license-building foreign designs.
[SIZE=3]
Order of Battle (Armada de Chile) March 31st, 1944[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Primary Combatants:
Dreadnought Battleships: 0(0)+0-1
Dreadnought Battlecruisers: 2(0)+1
Aircraft Carriers: 3(0)+0
Heavy Cruiser: 1(0)+1
Light Cruisers: 7(1)+0
Helicopter Cruisers: 1(0)+0
Destroyer Leaders: 8(0)+0 {3,000 tons std and up}
Destroyers: 34(0)+2 {1,200-3,000 tons std}
Destroyer Escorts: 18(0)+3
Light Destroyers (Corvettes): 8(0)+0
Minelayer: 1(0)+1
Torpedo Boats: 25(0)+0
Submarines: 10(0)+0
Floatplane Carriers: 0(0)+0
Subchasers: 24(0)+1
Minesweepers: 25(0)+0
Arctic Patrol Vessel: 3(0)+0
Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0
Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0
Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 2(0)+0
Landing Craft Tank: 0(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0
Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 2(0)+0
Museum Ships: 1(0)+0
Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)