[SIZE=4]Industrial Allocation[/SIZE]
- 3/3 factories producing 3000t materials.
- 0/3 factories dedicated to infrastructure.
- 1425 from stockpile.
- 0 tons from transactions.
- 0 tons from scrapping
- 4425t materials total.
- 2725t used.
- 1700t stored for Q1/44.
[SIZE=4]Infrastructure Development[/SIZE]
- N/A
[SIZE=4]Naval Construction[/SIZE]
at Varna:
- Type 2 drydock - Light Cruiser Maritsa completes 25% refit. 1740 tons required to complete. 390 tons added Q4/1943 for total of 1740 / 1740 tons.
- Type 1 slip - Idle
- Type 1 slip - Idle
- Type 1 drydock - Destroyer Slaveni begins partial reconstruction. 247 tons required to complete. 247 tons added Q4/1943 for total of 247 / 247 tons. Refit completed.
- Type 0 slip - Idle.
- Type 2 floating drydock - Idle.
Dockside:
- Fleet Tender Stara Planina laid down January 1st, 1943. 2783 tons required. 683 tons added Q4/43 for a total of 2783 / 2783 . Completed in Q4/1943.
- Fleet Tender Rodopi laid down April 1st, 1943. 2783 tons required. 700 tons added Q4/43 for a total of 2100 / 2783 . 683 / 2783 remaining until completion in Q1/1944.
at Burgas:
- Type 0 slip - Tropanka-class netlayer Tropanka laid down October 1st, 1943. 235 tons required. 235 tons added Q4/43 for a total of 235 / 235. 0 / 235 tons remaining until completion on February 7th, 1944. Launched November 21st, 1943.
- Type 0 slip - Tropanka-class netlayer Lesnoto laid down October 1st, 1943. 235 tons required. 235 tons added Q4/43 for a total of 235 / 235. 0 / 235 tons remaining until completion on February 7th, 1944. Launched November 21st, 1943.
- Type 0 drydock - Tropanka-class netlayer Svornato laid down October 1st, 1943. 235 tons required. 235 tons added Q4/43 for a total of 235 / 235. 0 / 235 tons remaining until completion on February 7th, 1944. Launched November 21st, 1943.
Dockside:
N/A
from factories:
- N/A
Scrapping:
- N/A
On Trials
None
[SIZE=4]Transactions[/SIZE]
None
[SIZE=4]Other Notes[/SIZE]
N/A
[SIZE=4]Order of Battle (Royal Bulgarian Navy) end of Q4 1943[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Combatants
Battleships: 1(0)0
Cruisers: 2(0)0
Contradestroyers: 4(0)0
Destroyers: 8(0)0
Minelayers: 4(0)0
River Monitors: 5(0)0
River Patrol Craft: 5(0)0
Subchasers: 3(0)0
Submarines: 11(0)0
Midget Submarines: 2(0)0
Motor Torpedo Boats: 31(0)0
Motor Launches: 6(0)0
Riverine gun/torpedo boats: 80(0)0
Assault Boats: 16(0)0
Auxiliaries
Mine sweepers: 6(0)0
Auxiliaries: 2(0)0 + 1
Netlayers: 0(0)+3
Tugboats: 3(0)0
Experimental Craft: 1(0)0
Museum Ships: 1(0)0
[SIZE=4]Summary[/SIZE]
N/A