Yugoslavia 4Q 43 Sim Report
A. Factories
2/2 factories = 2000 tons of naval material produced 4Q1943
0/2 factories (committed)
0/2 factories (flexible)
Tonnage Produced: 2,000
Tonnage Transferred In: 0
Tonnage Received in Payment: 0
Tonnage Reclaimed From Scrap: 0
Tonnage Previously Stockpiled: 12
Total Tonnage Available: 2,012
Tonnage Transferred Out: 0
Tonnage Paid: 0
Tonnage Used in Construction: 1,750
Tonnage Remaining for Stockpile: 262
B. Infrastructure Development
At Bar: None
At Belgrade: None
C. Naval Development and Construction
At Bar:
Dock No.1 (Type 2.0): Idle
Dock No.2 (Type 0.0): Idle
Slip No.1 (Type 1.5): Netlayer D – Laid down 1 October 1943: Requires 194 tons; prior construction 0 tons, receives 100 tons, 94 tons remaining; Launched 21 November 1943
Slip No.2 (Type 0): Escort Sloop G – Laid down 1 October 1943; Requires 620 tons; prior construction 0 tons, receives 180 tons, 440 tons remaining
Slip No.3 (Type 0): Escort Sloop H – Laid down 1 October 1943; Requires 620 tons; prior construction 0 tons, receives 180 tons, 440 tons remaining
Dockside:
Destroyer Leader C – Launched 19 August 1943: Requires 2,587 tons; prior construction 1,300 tons, receives 650 tons, 637 tons remaining
Escort Sloop E – Launched 26 July 1943; Requires 620 tons; prior construction 280 tons, receives 180 tons, 160 tons remaining
Escort Sloop F – Launched 26 July 1943; Requires 620 tons; prior construction 280 tons, receives 180 tons, 160 tons remaining
Netlayer C – Launched 21 Aug 1943: Requires 194 tons; prior construction 100 tons, receives 94 tons, 0 tons remaining; Completed 4 November 1943; commissioned as Los
At Belgrade:
Dock No.1 (Type 0): Idle
Slip No.1 (Type 0): Idle
Small Craft Construction
Project 1942 Alpha – Motor Torpedo Boat – two craft constructed at a cost of 186 tons
D. Transactions
None
E. Refits
None
Ships Laid Down This Quarter
At Bar:
Project 1942 Theta - Escort Sloop G
Project 1942 Theta - Escort Sloop H
Project 1943 Epsilon – Netlayer D
At Belgrade:
None
Ships Launched This Quarter
At Bar:
Project 1943 Epsilon – Netlayer D
At Belgrade:
None
Ships Completed This Quarter
At Bar:
Project 1943 Epsilon - Netlayer C – Los
At Belgrade:
None
Ships Undergoing Trials
Destroyer Leader Sarejevo (completes 12 March 1944)
Escort Sloop Vihor (completes 12 October 1943)
Escort Sloop Metez (completes 12 October 1943)
Netlayer Bizon (completes 3 November 1943)
Netlayer Los (completes 2 February 1944)
F. Scrappage Report
None this quarter
Order of Battle of the Royal Yugoslav Navy, December 1943
Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 2 + 0 + 0 + 0 = 2
Destroyer Leaders : 1 + 1 + 1 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Torpedo Boats : 4 + 0 + 0 + 0 = 4
Escort Sloops : 4 + 0 + 4 + 0 = 8
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 24 + 0 + 0 + 0 = 24
Fleet Tender : 1 + 0 + 0 + 0 = 1
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Netlayers : 2 + 1 + 1 + 0 = 4
Riverine Monitors : 8 + 0 + 0 + 0 = 8