You are not logged in.

1

Thursday, April 4th 2013, 9:29pm

Canada, Eh? 1943 reports

Canadian Industrial Report – Q1/ 1943
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 358t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10358t

__________________________________

Infrastructure Development

__________________________________

Naval Construction
HMCS Tenacious recieves 2000 tons.
HMCS Ontario recieves 2000 tons.
HMCS Quebec recieves 2000 tons.
HMCS British Columbia 2000 tons.
HMCS Alberta recieves 2000 tons.


358t leftover

__________________________________

Esquimault, British Columbia (Burrard-Yarrow Ltd. at Lang's Cove)
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Dockside: HMCS British Columbia 10000/12000 0/21 months remaining


Montreal, Quebec (Canadian Vickers)
Type 2 Slip: Idle
Type 2 Slip: Idle
Type 2 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Dockside: HMCS Ontario 10000/12000 0/21 months remaining
HMCS Quebec 10000/12000 0/21 months remaining


Quebec City, Quebec
Type 4 Drydock: Idle
Dockside: Idle


Halifax, Nova Scotia (Halifax Royal Naval Dockyard)
Type 4 Drydock: HMCS Tenacious 7000/20000 20/29 months remaining
Type 3 Drydock: Idle
Dockside: HMCS Alberta 10000/12000 0/21 months remaining


Saint John, New Brunswick
Type 1 drydock: Idle
Dockside: Idle


King's Wharf, Somers Isles (Bermuda Royal Naval Dockyard)
Type 2 drydock: Idle
Dockside: Idle
__________________________________

Transactions

HMS General Crawford, HMS Sir John Moore, HMS Gorgon transferred to RCN

__________________________________

Other Notes

5.5"/60 QF Mark VI Project ongoing at Canadian Vickers

__________________________________

2

Thursday, April 4th 2013, 9:30pm

Canadian Industrial Report – Q2/ 1943
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 358t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10358t

__________________________________

Infrastructure Development

__________________________________

Naval Construction
HMCS Tenacious recieves 1000 tons.
HMCS Ontario recieves 2000 tons.
HMCS Quebec recieves 2000 tons.
HMCS British Columbia 2000 tons.
HMCS Alberta recieves 2000 tons.
HMCS Vimy Ridge recieves 150 tons.
HMCS Kitchener's Wood recieves 150 tons.
HMCS Viscount Byng recieves 1000 tons.
58t leftover

__________________________________

Esquimault, British Columbia (Burrard-Yarrow Ltd. at Lang's Cove)
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Dockside: HMCS British Columbia Completed


Montreal, Quebec (Canadian Vickers)
Type 2 Slip: HMCS Vimy Ridge 150/8150 17/17 months remaining
Type 2 Slip: HMCS Kitchener's Wood 150/8150 17/17 months remaining
Type 2 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Dockside: HMCS Ontario Completed
HMCS Quebec Completed


Quebec City, Quebec
Type 4 Drydock: Idle
Dockside: Idle


Halifax, Nova Scotia (Halifax Royal Naval Dockyard)
Type 4 Drydock: HMCS Tenacious 9000/20000 17/29 months remaining
Type 3 Drydock: Idle
Dockside: HMCS Alberta Completed


Saint John, New Brunswick
Type 1 drydock: HMCS Viscount Byng 1000/2500 7/7 months remaining
Dockside: Idle


King's Wharf, Somers Isles (Bermuda Royal Naval Dockyard)
Type 2 drydock: Idle
Dockside: Idle
__________________________________

Transactions

None
__________________________________

Other Notes

5.5"/60 QF Mark VI Project ongoing at Canadian Vickers

3

Thursday, April 4th 2013, 9:30pm

Canadian Industrial Report – Q3/ 1943
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 58t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10058t

__________________________________

Infrastructure Development

__________________________________

Naval Construction
HMCS Tenacious recieves 3000 tons.
HMCS Vimy Ridge recieves 3000 tons.
HMCS Kitchener's Wood recieves 3000 tons.
HMCS Viscount Byng recieves 1000 tons.
58t leftover

__________________________________

Esquimault, British Columbia (Burrard-Yarrow Ltd. at Lang's Cove)
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Dockside: Idle


Montreal, Quebec (Canadian Vickers)
Type 2 Slip: HMCS Vimy Ridge 3150/8150 14/17 months remaining
Type 2 Slip: HMCS Kitchener's Wood 3150/8150 14/17 months remaining
Type 2 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Dockside: Idle


Quebec City, Quebec
Type 4 Drydock: Idle
Dockside: Idle


Halifax, Nova Scotia (Halifax Royal Naval Dockyard)
Type 4 Drydock: Idle
Type 3 Drydock: Idle
Dockside: HMCS Tenacious 12000/20000 14/29 months remaining


Saint John, New Brunswick
Type 1 drydock: HMCS Viscount Byng 2000/2500 4/7 months remaining
Dockside: Idle


King's Wharf, Somers Isles (Bermuda Royal Naval Dockyard)
Type 2 drydock: Idle
Dockside: Idle
__________________________________

Transactions

None
__________________________________

Other Notes

5.5"/60 QF Mark VI Project ongoing at Canadian Vickers

4

Thursday, April 4th 2013, 9:30pm

Canadian Industrial Report – Q4/ 1943
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 58t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10058t

__________________________________

Infrastructure Development

__________________________________

Naval Construction
HMCS Tenacious recieves 3000 tons.
HMCS Vimy Ridge recieves 3000 tons.
HMCS Kitchener's Wood recieves 3000 tons.
HMCS Viscount Byng recieves 400 tons.
HMCS Passchendaele recieves 100 tons.
HMCS Moreuil Wood recieves 100 tons.
HMCS Mount Sorrel recieves 100 tons.
HMCS Cambrai recieves 100 tons.
HMCS Queenston Heights recieves 100 tons.
HMCS Kirbekan recieves 100 tons.

58t leftover

__________________________________

Esquimault, British Columbia (Burrard-Yarrow Ltd. at Lang's Cove)
Type 1 Slip: HMCS Moreuil Wood 100/2500 10/10 months remaining
Type 1 Slip: HMCS Mount Sorrel 100/2500 10/10 months remaining
Type 1 Slip: HMCS Queenston Heights 100/2500 10/10 months remaining
Type 4 Drydock: Idle
Dockside: Idle


Montreal, Quebec (Canadian Vickers)
Type 2 Slip: HMCS Vimy Ridge 6150/8150 11/17 months remaining
Type 2 Slip: HMCS Kitchener's Wood 6150/8150 11/17 months remaining
Type 2 Slip: HMCS Passchendaele 100/2500 10/10 months remaining
Type 1 Slip: HMCS Cambrai 100/2500 10/10 months remaining
Type 4 Drydock: Idle
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Dockside: Idle


Quebec City, Quebec
Type 4 Drydock: Idle
Dockside: Idle


Halifax, Nova Scotia (Halifax Royal Naval Dockyard)
Type 4 Drydock: Idle
Type 3 Drydock: Idle
Dockside: HMCS Tenacious 15000/20000 11/29 months remaining


Saint John, New Brunswick
Type 1 drydock: HMCS Kirbekan 100/2500 10/10 months remaining
Dockside: HMCS Viscount Byng 2400/2500 1/7 months remaining


King's Wharf, Somers Isles (Bermuda Royal Naval Dockyard)
Type 2 drydock: Idle
Dockside: Idle
__________________________________

Transactions

None
__________________________________

Other Notes

5.5"/60 QF Mark VI Project ongoing at Canadian Vickers