You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, March 11th 2013, 5:05am

France, Q3/1943



[SIZE=5]Report for Q3/1943[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 24/27 factories producing 25,000t materials.
- 3/27 factories producing infrastructure
- 8,414t from stockpile.
- 2,378t from transactions.
- 4,646t from scrapping.
- 39,439t materials total.
- 31,489t used.
- 7,950t stored for Q4/43.

[SIZE=3]Infrastructure Development [/SIZE]
2 factories dedicated to IP, producing 0.2 IP. 3.1 IP added to half-factory, 1.9 IP remaining.
1 factory (non-dedicated) to IP, producing 0.1 IP.

[SIZE=3]Naval Construction [/SIZE]

At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Idle
Class 4 Slip #1 - Export Battleship Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q3/1943 for a total of 7137 / 34448 tons. 27,311 / 34448 tons remaining. Launch planned for June, 1944. Completion planned for September 9th, 1946.
Class 3 Slip #1 - Heavy Cruiser Redoubtable laid down July 1st, 1943. 14,275 tons required. 100 tons added in Q3/1943 for a total of 100 / 14275 tons. 14175 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #2 - Heavy Cruiser Renommée laid down July 1st, 1943. 14,275 tons required. 100 tons added in Q3/1943 for a total of 100 / 14275 tons. 14175 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #3 - Contre-Torpillieur Vauquelin (Forbin class) laid down July 1st, 1943. 2,500 tons required. 625 tons added in Q3/1943 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched October 19th, 1943. Completed June 15th, 1944.
Class 3 Slip #4 - Contre-Torpillieur Chevalier Paul (Forbin class) laid down May 1st, 1943. 2,500 tons required. 625 tons added in Q3/1943 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched September 19th, 1943. Completed April 15th, 1944.
Class 2 Slip #1 - Contre-Torpillieur D'Estrées (Forbin class) laid down September 1st, 1943. 2,500 tons required. 210 tons added in Q3/1943 for a total of 210 / 2500 tons. 2290 / 2500 tons remaining. Launched January 19th, 1943. Completed August 15th, 1944.
Class 2 Slip #2 - Contre-Torpillieur Dupetit-Thouars (Forbin class) laid down March 1st, 1943. 2,500 tons required. 625 tons added in Q3/1943 for a total of 1460 / 2500 tons. 1040 / 2500 tons remaining. Launched July 19th, 1943. Completed January 15th, 1944.
Class 1 Slip #1 - Contre-Torpillieur Claymore (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched October 14th, 1943. Completed June 4th, 1944.
Class 1 Slip #2 - Contre-Torpillieur Carabine (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched October 14th, 1943. Completed June 4th, 1944.
Class 1 Slip #3 - Contre-Torpillieur Épée (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched October 14th, 1943. Completed June 4th, 1944.
Class 1 Slip #4 - Contre-Torpillieur Trident (Sabre class, Étendard subclass) laid down July 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched October 14th, 1943. Completed June 4th, 1944.
Class 0 Slip #1 - Submarine Atalante (Thetis class) laid down July 1st, 1943. 675 tons required. 300 tons added in Q3/1943 for a total of 300 / 675 tons. 375 / 675 tons remaining. Launched October 31st, 1943. Completed April 21st, 1944.
Class 0 Slip #2 - Submarine Nymphe (Thetis class) laid down April 1st, 1943. 675 tons required. 300 tons added in Q3/1943 for a total of 600 / 675 tons. 75 / 675 tons remaining. Launched July 31st, 1943. Completed January 21st, 1944.
Class 0 Slip #3 - Aviso Hydrographique Ingénieur Elie Monnier laid down July 1st, 1943. 200 tons required. 200 tons added in Q3/1943 for a total of 200 / 200 tons. 0 / 200 tons remaining. Launched complete July 31st, 1943.
Class 0 Slip #4 - Idle

Dockside:
- Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 1,500 tons added in Q3/1943 for a total of 28500 / 33000 tons. 4500 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
- Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 1,500 tons added in Q3/1943 for a total of 28500 / 33000 tons. 4500 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
- Heavy Cruiser Jean Bart laid down January 1st, 1942. 17,700 tons required. 3000 tons added in Q3/1943 for a total of 12750 / 17700 tons. 6,950 / 17700 tons remaining. Launched June 24th, 1943. Completion planned for March 10th, 1944.
- Heavy Cruiser Jeanne d'Arc laid down January 1st, 1942. 17,700 tons required. 3000 tons added in Q3/1943 for a total of 12750 / 17700 tons. 6,950 / 17700 tons remaining. Launched June 24th, 1943. Completion planned for March 10th, 1944.
- Contre-Torpillieur Forbin (Forbin class) laid down January 1st, 1943. 2,500 tons required. 625 tons added in Q3/1943 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched May 19th, 1943. Completed November 15th, 1943.
- Contre-Torpillieur Étendard (Sabre class, Étendard subclass) laid down January 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1943. Completed November 4th, 1943.
- Contre-Torpillieur Flamberge (Sabre class, Étendard subclass) laid down January 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1943. Completed November 4th, 1943.
- Contre-Torpillieur Hallebarde (Sabre class, Étendard subclass) laid down January 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1943. Completed November 4th, 1943.
- Contre-Torpillieur Harpon (Sabre class, Étendard subclass) laid down January 1st, 1943. 2,100 tons required. 525 tons added in Q3/1943 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1943. Completed November 4th, 1943.
- Submarine Thetis (Thetis class) laid down January 1st, 1943. 675 tons required. 75 tons added in Q3/1943 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched April 30th, 1943. Completed October 21st, 1943.
- Tanker Vendémiaire converted as naval auxiliary. 260 tons required. 260 tons added in Q3/1943. Conversion completed.

At Brest (Cl 5)
Class 3 Drydock #1 - Heavy Cruiser Gloire undergoing partial reconstruction. 4,857 tons required. 1500 tons added in Q3/1943 for a total of 4500/ 4857. 357 / 4857 tons remaining. Reconstruction completed October 11th, 1943.
Class 2 Drydock #1 - Landing craft Voltigeur laid down July 1st, 1943. 179 tons required. 105 tons added in Q3/1943 for a total of 105 / 179 tons. 74 / 179 tons remaining. Launched August 2nd, 1943. Completed December 6th, 1943.
Class 1 Drydock #1 - Landing craft Mameluck laid down July 1st, 1943. 179 tons required. 105 tons added in Q3/1943 for a total of 105 / 179 tons. 74 / 179 tons remaining. Launched August 2nd, 1943. Completed December 6th, 1943.

Dockside:
- Escorteur rapide Le Normand laid down January 1st, 1943. 1,185 tons required. 350 tons added in Q3/1943 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1943. Completed November 6th, 1943.
- Escorteur rapide Le Boulonnais laid down January 1st, 1943. 1,185 tons required. 350 tons added in Q3/1943 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1943. Completed November 6th, 1943.
- Tugboat Bélier converted as naval auxiliary. 223 tons required. 223 tons added in Q3/1943. Conversion completed.
- Submarine Protée beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Clorinde beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Cornélie beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Alma beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Achille beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Actéon beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Ajax beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Archimède beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Argo ()beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Africaine beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Astrée beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.
- Submarine Aurore beginning manual refit (addition of radar). 29 tons required. 29 tons added Q3/1943. Refit completed.

At Abidjan (Cl 5)
Class 3 Drydock #1 - Seine-class corvette Seine scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943. Seine-class corvette Risle scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.
Class 1 Drydock #1 - Seine-class corvette Eure scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.

At Marseilles (Cl 5)
Class 4 Drydock #1 - Heavy cruiser Indochine completes major refit. 3017 tons required. 1267 tons added in Q3/1943 for a total of 3017 / 3017. 0 / 3017 tons remaining. Refit completed on September 8th, 1943.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Landing Ship Dock Destrées (Châteaurenault class) laid down January 1st, 1943. 7539 tons required. 1,500 tons added in Q3/1943 for a total of 4500 / 7539 tons. 3039 / 7539 tons remaining. Launched July 19th, 1943. Completed May 17th, 1944.
Class 2 Drydock #1 - Light cruiser Durendal begins partial reconstruction. 1,919 tons required. 1100 tons added in Q3/1943 for a total of 1100 / 1919. 819 / 1919 tons remaining. Reconstruction completed October 14th, 1943.
Class 1 Slip #1 - Submarine Roland Morillot laid down July 1st, 1943. 1,450 tons required. 450 tons added in Q3/1943 for a total of 450 / 1450 tons. 1000 / 1185 tons remaining. Launched November 6th, 1943. Completed May 15th, 1944.
Class 1 Slip #2 - Submarine Charles Drujon laid down July 1st, 1943. 1,450 tons required. 450 tons added in Q3/1943 for a total of 450 / 1450 tons. 1000 / 1185 tons remaining. Launched November 6th, 1943. Completed May 15th, 1944.
Class 1 Drydock #1 - Four craft laid down end to end. Four Patrouilleur de Port 15m laid down July 1st, 1943. 17 tons added to each Q3/43. Completed July 31st, 1943, launched.
Class 0 Drydock #1 - Seine-class corvette Andelle scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.

Dockside:
- Light Cruiser Tunisie begins minor alteration (modernization of radar) on July 1st, 1943. 241 tons required. 241 tons added in Q3 for a total of 241 / 241 tons. 0 / 241 tons remaining. Refit completed July 22nd, 1943.
- Frégate de surveillance Polynésie (Polynésie class) laid down January 1st, 1943. 2,779 tons required. 700 tons added in Q3/1943 for a total of 2100 / 2779 tons. 679 / 2779 tons remaining. Launched May 22nd, 1943. Completed November 24th, 1943.
- Escorteur rapide Le Lorrain laid down January 1st, 1943. 1,185 tons required. 350 tons added in Q3/1943 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1943. Completed November 6th, 1943.
- Frégate Sans Reproche laid down January 1st, 1943. 1,400 tons required. 400 tons added in Q3/1943 for a total of 1200 / 1400 tons. 200 / 1185 tons remaining. Launched May 5th, 1943. Completed November 12th, 1943.

At Oran (Cl 5)
Class 1 Drydock #1 - Seine-class corvette Epte scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.
Class 0 Drydock #1 - Seine-class corvette Essonne scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.

Dockside:
N/A

At Tunis (Cl 5)
Class 4 Drydock #1 - Seine-class corvette Marne scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943. Seine-class corvette Yonne scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943. Seine-class corvette Ourse scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Seine-class corvette Aube scrapping. 88 tons to be recovered. Scrapping begins June 1st, 1943, and completes September 1943.

Dockside:
- Tanker Rambouillet converted as naval auxiliary. 100 tons required. 100 tons added in Q3/1943. Conversion completed.
- Tanker Châtenay-Malabry converted as naval auxiliary. 100 tons required. 100 tons added in Q3/1943. Conversion completed.

At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

Dockside:
N/A

At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Saigon (Cl 5)
Class 4 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Patrol Boat Song Lo undergoing partial reconstruction. 43 tons required. 43 tons added in Q3/1943 for a total of 43 / 43. 0 / 43 tons remaining. Reconstruction completed.
Class 0 Slip #1 - Three craft laid down end to end. Vedette FOM 8m laid down July 1st; 8 tons added Q3/43. Completed July 31st, 1943, launched. Vedette FOM 11m laid down July 1st; 11 tons added Q3/43. Completed July 31st, 1943, launched.
Class 0 Slip #2 - Two craft laid down end-to-end. Landing craft C10 laid down July 1st, 1943. 185 tons required. 185t tons added in Q3/1943 for a total of 185 / 185 tons. Landing craft C9 laid down July 1st, 1943. 185 tons required. 185t tons added in Q3/1943 for a total of 185 / 185 tons.

Dockside:
- Frégate Tran Nhat Duat laid down January 1st, 1943. 1,400 tons required. 400 tons added in Q3/1943 for a total of 1200 / 1400 tons. 200 / 1185 tons remaining. Launched May 5th, 1943. Completed November 12th, 1943.

Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Patrol Boat Song Da undergoing partial reconstruction. 43 tons required. 43 tons added in Q3/1943 for a total of 43 / 43. 0 / 43 tons remaining. Reconstruction completed.

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Heavy cruiser Nouvelle-Calédonie begins total reconstruction. 8601 tons required. 200 tons added in Q3/1943 for a total of 200 / 8601 tons. 8401 / 8601 tons remaining. Reconstruction completes Q4/1944.
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Aviso Arabe (Arabe class) laid down July 1st, 1943. 634 tons required. 190 tons added in Q3/1943 for a total of 190 / 634 tons. 444 / 634 tons remaining. Launched October 27st, 1943. Completed April 19th, 1944.
Class 0 Slip #2 - Aviso Algérien (Arabe class) laid down July 1st, 1943. 634 tons required. 190 tons added in Q3/1943 for a total of 190 / 634 tons. 444 / 634 tons remaining. Launched October 27st, 1943. Completed April 19th, 1944.
Class 0 Slip #3 - Idle

Dockside:
- None

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- DD Glaive
- DD Poignard
- DD Pique
- DD Épieu
- DD Navarin
- DD Fou-Tchéou
- DD Grand Port
- DD Bévéziers

[SIZE=3]From Factories[/SIZE]
- 2x La Combattante II motor torpedo boats built; 320 tons total (160t each).
- 1x research submarine CNRS-1 built; 100 tons total
- 4x Bateau de Service 20m built; 120 tons total (30t each).
- 2x EDA-55 landing craft built; 110 tons total (55t each).
- 4x Bateau de Service 8.6m built; 24 tons total (6t each).
- 4x Bateau de Service 12.2m built; 40 tons total (10t each).
- 8x Patrouillier de Port 15m built; 136 tons total (17t each).

[SIZE=3]Transactions[/SIZE]
2,379 tons from Romania for Export Battleship (construction costs).
0.1 IP to Persia for the floating drydock being built there.

[SIZE=3]Other Notes[/SIZE]
None

[SIZE=3]Ships being scrapped [/SIZE]
Ten Seine-class corvettes are being scrapped for 88 tons apiece.

- Total tonnage in recycling until Q2/1943: (2x939 + 15x151.4 + 4x632) = 6677
- Total tonnage in recycling until Q3/1943: (2x939 + 4x527 + 10x66) = 4646
- Total tonnage in recycling until Q4/1943: (2x312) = 624
- Total tonnage in recycling until Q2/1944: (10x88) = 880

[SIZE=3]Updated Order of Battle, End of Q3/1943[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping

The Fleet
Battleships: 7(0)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 9(0)+2
Heavy Cruisers: 11(2)+4
Light Cruisers: 26(0)+0
Coast Defense Ships: 5(0)+0
Destroyers: 80(0)+7
Frigate: 0(0)+2
Corvettes: 10(0)+0
Escorteurs Rapides: 1(0)+3
Avisos: 8(0)+2
Fleet Submarines: 24(0)+2
Coastal Submarines: 54(0)+3
Motor Torpedo Boats: 30(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0

Fleet Train
Replenishment Ships: 12(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 1(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 9(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 3(0)+0
Research Submarine: 1(0)+0

Amphibious Forces:
Dock Landing Ship: 1(0)+1
Vehicle Landing Ship: 3(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 2(0)+2
Tank Landing Craft (EDA): 11(0)+0
Infantry Assault Craft Small (EA): 29(0)+0

Minor Craft:
Bateau de Service: 24(0)+0
Patrouilleur de Port: 16(0)+0

Patrouille Navale:
Frigate: 0(0)+1
Survey Craft: 1(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Motor Torpedo Boats: 4(0)+0
Vedettes: 14(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0