You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 5th 2013, 8:14pm

Bulgaria, Q3/1943

[SIZE=4]Industrial Allocation[/SIZE]
- 3/3 factories producing 3000t materials.
- 0/3 factories dedicated to infrastructure.
- 1666 from stockpile.
- 0 tons from transactions.
- 0 tons from scrapping
- 3703t materials total.
- 3241t used.
- 1425t stored for Q4/43.

[SIZE=4]Infrastructure Development[/SIZE]
- N/A

[SIZE=4]Naval Construction[/SIZE]
at Varna:
- Type 2 drydock - Light Cruiser Maritsa begins 25% refit. 1740 tons required to complete. 1350 tons added Q3/1943 for total of 1350 / 1740 tons.
- Type 1 slip - Idle
- Type 1 slip - Fleet Tender Rodopi laid down April 1st, 1943. 2783 tons required. 700 tons added Q3/43 for a total of 1400 / 2783 . 1383 / 2783 remaining until completion in Q1/1944.
- Type 1 drydock - Destroyer Plameneni begins partial reconstruction. 247 tons required to complete. 247 tons added Q3/1943 for total of 247 / 247 tons. Refit completed.
- Type 0 slip - Idle.
- Type 2 floating drydock - Idle.

Dockside:
- Fleet Tender Stara Planina laid down January 1st, 1943. 2783 tons required. 700 tons added Q3/43 for a total of 2100 / 2783 . 683 / 2783 remaining until completion in Q4/1943.
- Destroyer Kyustendil begins radar refit. 61 tons required to complete. 61 tons added Q3/1943 for total of 61 / 61 tons. Refit completed.
- Destroyer Pazardzhik begins radar refit. 61 tons required to complete. 61 tons added Q3/1943 for total of 61 / 61 tons. Refit completed.

at Burgas:
- Type 0 slip - Idle.
- Type 0 slip - Idle.
- Type 0 drydock - Idle.

Dockside:
- Destroyer Kazanlak begins radar refit. 61 tons required to complete. 61 tons added Q3/1943 for total of 61 / 61 tons. Refit completed.
- Destroyer Veliko Tarnovo begins radar refit. 61 tons required to complete. 61 tons added Q3/1943 for total of 61 / 61 tons. Refit completed.

from factories:
- N/A

Scrapping:
- N/A

On Trials
None

[SIZE=4]Transactions[/SIZE]
None

[SIZE=4]Other Notes[/SIZE]
N/A

[SIZE=4]Order of Battle (Royal Bulgarian Navy) end of Q3 1943[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Battleships:............................1(0)0
Cruisers:................................1(1)0
Contradestroyers:...................4(0)0
Destroyers:............................8(0)0
Minelayers:............................4(0)0
River Monitors:.......................5(0)0
River Patrol Craft:...................5(0)0
Subchasers:...........................3(0)0
Submarines:..........................11(0)0
Midget Submarines:................2(0)0
Motor Torpedo Boats:.............31(0)0
Motor Launches:.....................6(0)0
Riverine gun/torpedo boats:.....80(0)0
Assault Boats:........................16(0)0
Mine sweepers:......................6(0)0
Auxiliaries:.............................3(0)0 + 2
Tugboats:..............................3(0)0
Experimental:.........................1(0)0
Museum Ships:......................1(0)0

[SIZE=4]Summary[/SIZE]
N/A