You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 5th 2013, 3:50pm

Yugoslavia 3Q 43 Sim Report

Yugoslavia 3Q 43 Sim Report

A. Factories

2/2 factories = 2000 tons of naval material produced 3Q1943
0/2 factories (committed)
0/2 factories (flexible)

Tonnage Produced: 2,000
Tonnage Transferred In: 0
Tonnage Received in Payment: 0
Tonnage Reclaimed From Scrap: 0
Tonnage Previously Stockpiled: 39
Total Tonnage Available: 2,039
Tonnage Transferred Out: 0
Tonnage Paid: 0
Tonnage Used in Construction: 2,027
Tonnage Remaining for Stockpile: 12

B. Infrastructure Development

At Bar: None

At Belgrade: None

C. Naval Development and Construction

At Bar:

Dock No.1 (Type 2.0): Destroyer Leader C – Laid down 1 April 1943: Requires 2,587 tons; prior construction 650 tons, receives 650 tons, 1,287 tons remaining; Launched 19 August 1943

Dock No.2 (Type 0.0): Idle

Slip No.1 (Type 1.5): Netlayer C – Laid down 1 July 1943: Requires 194 tons; prior construction 0 tons, receives 100 tons, 94 tons remaining; Launched 21 Aug 1943

Slip No.2 (Type 0): Escort Sloop E – Laid down 1 April 1943; Requires 620 tons; prior construction 100 tons, receives 180 tons, 340 tons remaining; Launched 26 July 1943

Slip No.3 (Type 0): Escort Sloop F – Laid down 1 April 1943; Requires 620 tons; prior construction 100 tons, receives 180 tons, 340 tons remaining; Launched 26 July 1943

Dockside:

Destroyer Leader B – Launched 18 February 1943: Requires 2,587 tons; prior construction 1,950 tons, receives 637 tons, 0 tons remaining; Completed 14 September 1943 and commissioned as Sarejavo; commences trials.

Netlayer B – Launched 22 May 1943: Requires 194 tons; prior construction 100 tons, receives 94 tons, 0 tons remaining; Completed 5 August 1943 and commissioned as Bizon; commences trials


At Belgrade:

Dock No.1 (Type 0): Idle

Slip No.1 (Type 0): Idle


Small Craft Construction

Project 1942 Alpha – Motor Torpedo Boat – two craft constructed at a cost of 186 tons


D. Transactions

None

E. Refits

None

Ships Laid Down This Quarter

At Bar:

Project 1943 Epsilon – Netlayer C

At Belgrade:

None


Ships Launched This Quarter

At Bar:

Project 1942 Kappa - Destroyer Leader C

Project 1942 Theta - Escort Sloop E
Project 1942 Theta - Escort Sloop F

Project 1943 Epsilon – Netlayer C

At Belgrade:

None


Ships Completed This Quarter

At Bar:

Project 1942 Kappa - Destroyer Leader B – Sarejevo

Project 1943 Epsilon - Netlayer B – Bizon

At Belgrade:

None


Ships Undergoing Trials

Destroyer Leader Sarejevo (completes 12 March 1944)
Escort Sloop Vihor (completes 12 October 1943)
Escort Sloop Metez (completes 12 October 1943)


F. Scrappage Report

None this quarter


Order of Battle of the Royal Yugoslav Navy, September 1943

Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 2 + 0 + 0 + 0 = 2
Destroyer Leaders : 1 + 1 + 1 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Torpedo Boats : 4 + 0 + 0 + 0 = 4
Escort Sloops : 2 + 2 + 2 + 0 = 6
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 22 + 0 + 0 + 0 = 22
Fleet Tender : 1 + 0 + 0 + 0 = 1
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Netlayers : 1 + 1 + 1 + 0 = 3
Riverine Monitors : 8 + 0 + 0 + 0 = 8