You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, December 26th 2012, 11:40pm

Peru, 2/43

Peru, Q2/1943

A. Industrial Allocation

3/4 Factories to Naval Materials: +3,000 t
1/4 Factories to Infrastructure: +0.1 IP
Stockpile: 1,767 t
Transfers: +2,000 t (China)
Scrap: + 0 t
Total Available Tonnage: 6,767 t
Total Tonnage Used: 5,441 t
Surplus to Next Quarter: 1,326 t

B. Infrastructure Development

Continue expanding Callao D1B to D2A: 0.1 IP, for 0.2 of 1.0 IP required.

C. Trade and Commerce

28 t to France for yawls, y'all.

D. Naval Construction and Maintenance

At Callao

S2.5A: DA Libertad receives 650 t, launched, to complete 12/43
S2A: DD Lieutenant Garezon laid down, receives 468 t, to complete 2/44
S1A: DD Colonel Bolognesi receives 468 t, launched, to complete 11/43
S1B: SL Rio Urubamba receives 250 t, launched, to complete 10/43
S0A: AN Y-3 laid down, receives 345 t, to complete 1/44
S0B:
S0C: AT N-6 laid down, receives 413 t, launched, to complete 8/43
D3A: Idle
D1A:
D1B: *Expanding to D2*
Free-floating: DD Almirante Tucker receives 467 t, completed 5/43
Free-floating: LCI L-6 receives 0 t, completed 5/43.
Free-floating: AT N-5 receives 0 t, completed 5/43.
Free-floating: Salvage tug Maria refitted into service, receives 150 t, completed 5/43
Free-floating: DD Almirante Guise receives 468 t, to complete 8/43
Free-floating: AN Y-2 receives 0 t, to complete 7/43
Free-floating: Sailing sloop Ayacucho receives 100 t, completed 5/43
Free-floating: SL Rio Putamayo receive 250 t, completed 4/43

At Mollendo:

S0A: SC S-19 laid down, receives 100 t, launched, to complete 8/43
S0B:
S0C:
S0D: SS P-11 receives 250 t, launched, to complete 10/43
D0A: SS P-12 laid down receives 250 t, to complete 1/44
Free-floating: SS P-10 receives 250 t, to complet 7/43
Free-floating: SS P-9 receives 0 t, completed 4/43
Free-floating: SC S-17 receives 0 t, completed 5/43
Free-floating: SC S-18 receives 0 t, completed 5/43
Free-floating: Passenger ship Juan Gonzalez completes 25% refit conversion into hospital ship Misericordia, 500 t delivered, completed 6/43.
Free-floating: AM A-7 receives 0 t, completed 5/43

Commercial Yards

1 x 34 t patrol boats built (B-24)


E. Other Notes

Battleships Atahualpa, Manco Capac transferred to China, January 1943.


F. Order of Battle, End of Quarter

--Completed (Under Repair/Refit) + Under Construction

Battlecruisers (BC): 1(0) + 0
Aircraft Carriers (CV): 1(0) + 0
Heavy/Armored Cruisers (CA): 2(0) + 0
Light Cruisers (CL): 4(0) + 0
Heavy Destroyers (DA): 4(0) + 1
Destroyers (DD): 14(0) + 3
Torpedo Boat (TB): 8(0) + 0
Motor Torpedo Boats (MTB): 4(0) + 0
Submarines (SS): 14(0) + 3

Training Cruiser (CT): 1(0) + 0
Minesweepers (AM): 10(0) + 0
Submarine Chasers (SC): 18(0) + 1
Landing Craft Infantry: 6(0) + 0
Salvage Tug (ATO): 2(0) + 0
Harbour Tug (ATH): 5(0) + 1
Netlayer (AN): 1(0) + 2
Transport (AP): 1(0) + 0
Hospital Ship (AH): 1(0) + 0

Coast Guard

Sloop (SL): 2(0) + 1
Patrol Boat (PB): 24(0) + 0
Fishery Research Vessel (AFR): 1(0) + 0

2

Thursday, December 27th 2012, 1:44am

From Your Friendly Neighborhood Chilean Naval Intelligence Agent

Hm, if I might point a few things out...

- The Rio Putumayo should've been completed this quarter. It appears she's made it to the OOB as completed, but as of last report she still needed 250t to complete. A quick check of the Q1 report implies she was supposed to be done in 2/43, but she was only laid down in Q3/42.
- The "Factories to Naval Infrastructure" line in the Industrial Allocation doesn't appear to reflect that one of the four Peruvian factories is producing IP. This seems to be a carry-over from the Q1/43 report.
- You listed the converted-from-civilian salvage tug MariaConsuela. If my guess is correct, there was a Consuela completed last quarter, so I'm presuming this is a completely different ship named Maria (rather than MariaConsuela).
- It appears the "Surplus to Next Quarter" and "Total Tonnage Used" amounts are carried over from the Q1 report. As it stands now, those amounts are 1603t and 5164t respectively (presuming that Rio Putumayo still has 250t on her in Q2 to complete).
- Curiosity compels me to ask if you intended to lay down a second 100t subchaser, the S-20; you've laid down two per quarter religiously for five quarters, so I just want to make sure you didn't miss it.

3

Thursday, December 27th 2012, 2:10am

There was a netlayer missing, but the subchaser count is correct.