You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, December 26th 2012, 7:46pm

Yugoslavia 2Q 43 Sim Report

Yugoslavia 2Q 43 Sim Report

A. Factories

2/2 factories = 2000 tons of naval material produced 2Q1943
0/2 factories (committed)
0/2 factories (flexible)

Tonnage Produced: 2,000
Tonnage Transferred In: 0
Tonnage Received in Payment: 0
Tonnage Reclaimed From Scrap: 0
Tonnage Previously Stockpiled: 79
Total Tonnage Available: 2,079
Tonnage Transferred Out: 0
Tonnage Paid: 0
Tonnage Used in Construction: 2,040
Tonnage Remaining for Stockpile: 39

B. Infrastructure Development

At Bar: None

At Belgrade: None

C. Naval Development and Construction

At Bar:

Dock No.1 (Type 2.0): Destroyer Leader C – Laid down 1 April 1943: Requires 2,587 tons; prior construction 0 tons, receives 650 tons, 1,937 tons remaining

Dock No.2 (Type 0.0): Idle

Slip No.1 (Type 1.5): Netlayer B – Laid down 1 April 1943: Requires 194 tons; prior construction 0 tons, receives 100 tons, 94 tons remaining; Launched 22 May 1943

Slip No.2 (Type 0): Escort Sloop E – Laid down 1 April 1943; Requires 620 tons; prior construction 0 tons, receives 100 tons, 520 tons remaining

Slip No.3 (Type 0): Escort Sloop F – Laid down 1 April 1943; Requires 620 tons; prior construction 0 tons, receives 100 tons, 520 tons remaining.

Dockside:

Destroyer Leader B – Launched 18 February 1943: Requires 2,587 tons; prior construction 1,400 tons, receives 650 tons, 637 tons remaining

Escort Sloop C – Launched 25 October 1942: Requires 620 tons; prior construction 540 tons; receives 80 tons, 0 tons remaining; Completed 15 April 1943 and commissioned as Vihor; commences trials

Escort Sloop D – Launched 25 October 1942: Requires 620 tons; prior construction 540 tons; receives 80 tons, 0 tons remaining; Completed 15 April 1943 and commissioned as Metez

Netlayer A – Launched 21 February 1943: Requires 194 tons; prior construction 94 tons, receives 100 tons, 0 tons remaining; completed 7 May 1943 and commissioned as Mazga; commences trials. (launch date omitted from prior sim report)


At Belgrade:

Dock No.1 (Type 0): Idle

Slip No.1 (Type 0): Idle


Small Craft Construction

Project 1942 Alpha – Motor Torpedo Boat – two craft constructed at a cost of 186 tons


D. Transactions

None

E. Refits

None

Ships Laid Down This Quarter

At Bar:

Project 1942 Kappa – Destroyer Leader C

Project 1943 Epsilon – Netlayer B


Ships Launched This Quarter

At Bar:

Project 1943 Epsilon – Netlayer B


At Belgrade:

None


Ships Completed This Quarter

At Bar:

Project 1942 Theta - Escort Sloop C - Vihor
Project 1942 Theta - Escort Sloop D – Metez
Project 1943 Epsilon - Netlayer A - Mazga

Ships Undergoing Trials

Destroyer Leader Zagreb (completes 25 September 1943)
Escort Sloop Vihor (completes 12 October 1943)
Escort Sloop Metez (completes 12 October 1943)
Netlayer Mazga (completes 5 August 1943)


F. Scrappage Report

None this quarter

Order of Battle of the Royal Yugoslav Navy, June 1943

Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 2 + 0 + 0 + 0 = 2
Destroyer Leaders : 0 + 1 + 2 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Torpedo Boats : 4 + 0 + 0 + 0 = 4
Escort Sloops : 2 + 2 + 2 + 0 = 6
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 20 + 0 + 0 + 0 = 20
Fleet Tender : 1 + 0 + 0 + 0 = 1
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Netlayers : 0 + 1 + 1 + 0 = 2
Riverine Monitors : 8 + 0 + 0 + 0 = 8