Yugoslavia 2Q 43 Sim Report
A. Factories
2/2 factories = 2000 tons of naval material produced 2Q1943
0/2 factories (committed)
0/2 factories (flexible)
Tonnage Produced: 2,000
Tonnage Transferred In: 0
Tonnage Received in Payment: 0
Tonnage Reclaimed From Scrap: 0
Tonnage Previously Stockpiled: 79
Total Tonnage Available: 2,079
Tonnage Transferred Out: 0
Tonnage Paid: 0
Tonnage Used in Construction: 2,040
Tonnage Remaining for Stockpile: 39
B. Infrastructure Development
At Bar: None
At Belgrade: None
C. Naval Development and Construction
At Bar:
Dock No.1 (Type 2.0): Destroyer Leader C – Laid down 1 April 1943: Requires 2,587 tons; prior construction 0 tons, receives 650 tons, 1,937 tons remaining
Dock No.2 (Type 0.0): Idle
Slip No.1 (Type 1.5): Netlayer B – Laid down 1 April 1943: Requires 194 tons; prior construction 0 tons, receives 100 tons, 94 tons remaining; Launched 22 May 1943
Slip No.2 (Type 0): Escort Sloop E – Laid down 1 April 1943; Requires 620 tons; prior construction 0 tons, receives 100 tons, 520 tons remaining
Slip No.3 (Type 0): Escort Sloop F – Laid down 1 April 1943; Requires 620 tons; prior construction 0 tons, receives 100 tons, 520 tons remaining.
Dockside:
Destroyer Leader B – Launched 18 February 1943: Requires 2,587 tons; prior construction 1,400 tons, receives 650 tons, 637 tons remaining
Escort Sloop C – Launched 25 October 1942: Requires 620 tons; prior construction 540 tons; receives 80 tons, 0 tons remaining; Completed 15 April 1943 and commissioned as Vihor; commences trials
Escort Sloop D – Launched 25 October 1942: Requires 620 tons; prior construction 540 tons; receives 80 tons, 0 tons remaining; Completed 15 April 1943 and commissioned as Metez
Netlayer A – Launched 21 February 1943: Requires 194 tons; prior construction 94 tons, receives 100 tons, 0 tons remaining; completed 7 May 1943 and commissioned as Mazga; commences trials. (launch date omitted from prior sim report)
At Belgrade:
Dock No.1 (Type 0): Idle
Slip No.1 (Type 0): Idle
Small Craft Construction
Project 1942 Alpha – Motor Torpedo Boat – two craft constructed at a cost of 186 tons
D. Transactions
None
E. Refits
None
Ships Laid Down This Quarter
At Bar:
Project 1942 Kappa – Destroyer Leader C
Project 1943 Epsilon – Netlayer B
Ships Launched This Quarter
At Bar:
Project 1943 Epsilon – Netlayer B
At Belgrade:
None
Ships Completed This Quarter
At Bar:
Project 1942 Theta - Escort Sloop C - Vihor
Project 1942 Theta - Escort Sloop D – Metez
Project 1943 Epsilon - Netlayer A - Mazga
Ships Undergoing Trials
Destroyer Leader Zagreb (completes 25 September 1943)
Escort Sloop Vihor (completes 12 October 1943)
Escort Sloop Metez (completes 12 October 1943)
Netlayer Mazga (completes 5 August 1943)
F. Scrappage Report
None this quarter
Order of Battle of the Royal Yugoslav Navy, June 1943
Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 2 + 0 + 0 + 0 = 2
Destroyer Leaders : 0 + 1 + 2 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Torpedo Boats : 4 + 0 + 0 + 0 = 4
Escort Sloops : 2 + 2 + 2 + 0 = 6
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 20 + 0 + 0 + 0 = 20
Fleet Tender : 1 + 0 + 0 + 0 = 1
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Netlayers : 0 + 1 + 1 + 0 = 2
Riverine Monitors : 8 + 0 + 0 + 0 = 8