You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, July 10th 2012, 2:57am

France, Q3/1942



[SIZE=5]Report for Q2/1942[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 22/27 factories producing 22,000t materials.
- 5/27 factories producing infrastructure
- 4,099t from stockpile.
- 0t from transactions.
- 660t from scrapping.
- 26,759t materials total.
- 22,832t used.
- 3,927t stored for Q4/42.

[SIZE=3]Infrastructure Development [/SIZE]
5 factories dedicated to IP, producing 0.5 IP. 1.5 IP added to half-factory, 3.5 IP remaining.

[SIZE=3]Naval Construction [/SIZE]

At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1942 for a total of 21000 / 33000 tons. 12000 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q3/1942 for a total of 21000 / 33000 tons. 12000 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Heavy Cruiser Jean Bart laid down January 1st, 1942. 17,700 tons required. 250 tons added in Q31942 for a total of 750 / 17700 tons. 16,950 / 17700 tons remaining. Launch planned for June 24th, 1943. Completion planned for March 10th, 1944.
Class 3 Slip #2 - Heavy Cruiser Jeanne d'Arc laid down January 1st, 1942. 17,700 tons required. 250 tons added in Q31942 for a total of 750 / 17700 tons. 16,950 / 17700 tons remaining. Launch planned for June 24th, 1943. Completion planned for March 10th, 1944.
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Contre-Torpillieur Navarin (Sabre class, Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #2 - Contre-Torpillieur Fou-Tchéou (Sabre class, Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #3 - Contre-Torpillieur Grand Port (Sabre class, Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #4 - Contre-Torpillieur Bévéziers (Sabre class, Barfleur subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 0 Slip #1 - CDIC-200 landing craft C5 laid down July 1st, 1942. 145 tons required. 145 tons added in Q3/1942 for a total of 145 / 145 tons. 0 / 145 tons remaining. Launched complete July 31st, 1942. Completed.
Class 0 Slip #2 - CDIC-200 landing craft C6 laid down July 1st, 1942. 145 tons required. 145 tons added in Q3/1942 for a total of 145 / 145 tons. 0 / 145 tons remaining. Launched complete July 31st, 1942. Completed.
Class 0 Slip #3 - Infantry landing craft Fantassin laid down July 1st, 1942. 179 tons required. 105 tons added in Q3/1942 for a total of 105 / 179 tons. 0 / 145 tons remaining. Launched September 1st, 1942. Will complete December 1942.
Class 0 Slip #4 - Infantry landing craft Tirailleur laid down July 1st, 1942. 179 tons required. 105 tons added in Q3/1942 for a total of 105 / 179 tons. 0 / 145 tons remaining. Launched complete September 1st, 1942. Will complete December 1942.

Dockside:
- Contre-Torpillieur Barfleur (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur La Rochelle (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur Cap Lézard (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur Baie de Chesapeake (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Merchant ship Chaîne des Puys converted into transport. 211 tons required. 211 tons added in Q3/42 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug Sagittaire refitted. 223 tons required. 223 tons added in Q3/42 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Light Repair Ship Ophiuchus acquired as naval auxiliary. 73 tons required. 73 tons added in Q3/42 for a total of 73 / 73 tons. 0 / 73 tons remaining; conversion completes.

At Brest (Cl 5)
Class 3 Drydock #1 - Heavy Cruiser Duquesne undergoing partial reconstruction. 4,857 tons requred. 1,500 tons added in Q3/1942 for a total of 4500 / 4857. 357 / 4857 tons remaining. Reconstruction will complete October 11th, 1942.
Class 2 Drydock #1 - Contre-torpilleur L'Indomptable undergoes major refit. 428 tons required. 428 tons added in Q3/1942 for a total of 428 / 428. 0 / 428 tons remaining. Reconstruction completed August 23rd, 1942.
Class 1 Drydock #1 - Eagle class submarine #1 scrapping. 151.4 tons recovered Q3/1942.

Dockside:
- Escorteur rapide Le Breton laid down January 1st, 1942. 1,185 tons required. 350 tons added in Q3/1942 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1942. Completed November 6th, 1942.
- Freighter 211 acquired as naval auxiliary. 211 tons required. 211 tons added in Q3/42 for a total of 211 / 211 tons. 0 / 394 tons remaining; conversion completes.

At Abidjan (Cl 5)
Class 3 Drydock #1 - Eagle class submarine #2 scrapping. 151.4 tons recovered Q3/1942. Eagle class submarine #3 scrapping. 151.4 tons recovered Q3/1942. Eagle class submarine #4 scrapping. 151.4 tons recovered Q3/1942.
Class 1 Drydock #1 - Eagle class submarine #5 scrapping. 151.4 tons recovered Q3/1942.

At Marseilles (Cl 5)
Class 4 Drydock #1 - Battleship Bretagne scrapping. 10 months to scrap. 939 tons recovered Q3/42 for total of 1878 / 3129 tons recovered. 1251 tons remaining.
Class 3 Slip #1 - Contre-Torpillieur Glaive (Sabre class, Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 3 Slip #2 - Contre-Torpillieur Poignard (Sabre class, Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 2 Drydock #1 - Light cruiser Roncevaux begins partial reconstruction. 1,930 tons requred. 1100 tons added in Q3/1942 for a total of 1100 / 1930. 830 / 1930 tons remaining. Reconstruction completes December 14th, 1942.
Class 1 Slip #1 - Contre-Torpillieur Pique (Sabre class, Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Slip #2 - Contre-Torpillieur Épieu (Sabre class, Cimeterre subclass) laid down July 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 525 / 2100 tons. 1575 / 2100 tons remaining. Launched November 14th, 1942. Completed June 4th, 1943.
Class 1 Drydock #1 - Eagle class submarine #6 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Drydock #1 - Harbor tug Étang de Biscarosse refitting. 27 tons added Q3/1942 for a total of 27 / 27 tons. Refit completed.

Dockside:
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 1000 tons added Q3/1942 for total of 35000 / 35000 tons. 0 / 35000 tons remaining. Completed on August 30th, 1942.
- Contre-Torpillieur Cimeterre (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur Dague (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur Cognée (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
- Contre-Torpillieur Arquebuse (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q3/1942 for a total of 1575 / 2100 tons. 525 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.

At Oran (Cl 5)
Class 1 Drydock #1 - Eagle class submarine #7 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Drydock #1 - Eagle class submarine #8 scrapping. 151.4 tons recovered Q3/1942.

Dockside:
- Freighter Le Drâa acquired as naval auxiliary (destroyer tender). 394 tons required. 394 tons added in Q3/42 for a total of 394 / 394 tons. 0 / 394 tons remaining; conversion completes.

At Tunis (Cl 5)
Class 4 Drydock #1 - Battleship Provence scrapping. 10 months to scrap. 939 tons recovered Q3/42 for total of 1878 / 3129 tons recovered. 1251 tons remaining.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Eagle class submarine #9 scrapping. 151.4 tons recovered Q3/1942.

Dockside:
- Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 1000 tons added Q3/1942 for total of 34000 / 35000 tons. 1000 / 35000 tons remaining until completion on November 30th, 1942.
- Coastal oiler Romainville acquired as naval auxiliary. 100 tons required. 100 tons added in Q3/42 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.
- Coastal oiler Villeneuve-Saint-Georges acquired as naval auxiliary. 100 tons required. 100 tons added in Q3/42 for a total of 100 / 100 tons. 0 / 100 tons remaining; conversion completes.

At Beiruit (Cl 5)
Class 3 Drydock #1 - Light cruiser Jules Michelet scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 1 Drydock #1 - Eagle class submarine #10 scrapping. 151.4 tons recovered Q3/1942.

Dockside:
- None

At Djibouti (Cl 2)
Class 2 Drydock #1 - Light cruiser Edgard Quinet scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 1 Drydock - Eagle class submarine #11 scrapping. 151.4 tons recovered Q3/1942.
Class 1 Drydock #1 - Eagle class submarine #12 scrapping. 151.4 tons recovered Q3/1942.

Dockside:
- None

At Saigon (Cl 5)
Class 4 Drydock #1 - Light cruiser Waldeck Rousseau scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 1 Drydock #1 - Eagle class submarine #13 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Drydock #1 - Eagle class submarine #14 scrapping. 151.4 tons recovered Q3/1942.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down July 1st; 8 tons added Q3/42. Completed July 31st, 1942, launched. Vedette FOM 11m laid down July 1st; 8 tons added Q3/42. Completed July 31st, 1942, launched
Class 0 Slip #2 - Idle

Dockside:
- Freighter Aitné acquired as naval auxiliary. 163 tons required. 163 tons added in Q3/42 for a total of 163 / 163 tons. 0 / 163 tons remaining; conversion completes.

Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Light cruiser Ernest Renan scrapping. 1159 tons recoverable. 632 / 1159 tons recovered Q3/42.
Class 2 Drydock #1 - Contre-torpilleur Desaix undergoes major refit. 428 tons required. 428 tons added in Q3/1942 for a total of 428 / 428. 0 / 428 tons remaining. Reconstruction completed August 23rd, 1942.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Eagle class submarine #15 scrapping. 151.4 tons recovered Q3/1942.
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

Dockside:
- None

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- BB Libertie
- BB Justice
- CV Bucentaure
- CL Turpin
- DD Bouclier
- DD Rapière
- DD Sagaie
- DD Casque
- LSD Châteaurenault

[SIZE=3]From Factories[/SIZE]
- 8x EA-13 landing craft built; 104 tons total (13t each).

[SIZE=3]Transactions[/SIZE]
8x EA-13s transferred to Indochina Patrouille Navale.

[SIZE=3]Other Notes [/SIZE]
None

[SIZE=3]Ships being scrapped [/SIZE]
- 2 Bretagne class battleships (3129 tons per ship)
- 15 Eagle class fleet submarines (151.4 tons per ship)

- Total tonnage in recycling until Q2/1942: (10x66) = 660
- Total tonnage in recycling until Q3/1942: (10x66) = 660
- Total tonnage in recycling until Q4/1942: (9x136 + 15x141) = 3339
- Total tonnage in recycling until Q1/1943: (2x939) = 1878
- Total tonnage inrecycling until Q2/1942: (2x939 + 15x151.4+4x632) = 6677

[SIZE=3]Updated Order of Battle, End of Q3/1942[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping

The Fleet
Battleships: 7(0)+0-2
Battlecruisers: 4(0)+0
Aircraft Carriers: 8(0)+3
Heavy Cruisers: 12(1)+2
Light Cruisers: 25(1)+0-4
Coast Defense Ships: 5(0)+0
Destroyers: 64(0)+16
Corvettes: 20(0)+0
Escorteurs Rapides: 0(0)+1
Avisos: 8(0)+0
Fleet Submarines: 24(0)+0
Coastal Submarines: 64(0)+0
Motor Torpedo Boats: 12(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0

Fleet Train
Fast Oilers: 10(0)+0
Slow Oilers: 5(0)+0
Gasoline Tankers: 3(0)+0
Fleet Tenders: 3(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 1(0)+0
Light Repair Ships: 3(0)+0
Ammunition Ships: 2(0)+0
Transports: 6(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 7(0)+0
Light Harbour Tugs: 3(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0

Amphibious Forces:
Dock Landing Ship: 1(0)+0
Vehicle Landing Ship: 2(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 6(0)+0
Infantry Landing Craft Large (EDA-L): 0(0)+2
Tank Landing Craft (EDA): 9(0)+0
Infantry Assault Craft Small (EA): 29(0)+0

Patrouille Navale:
Tank Landing Craft (EDA): 2(0)+0
Infantry Assault Craft (EA): 8(0)+0
Motor Torpedo Boats: 2(0)+0
Vedettes: 6(0)+0
Light Patrol Boats: 4(0)+0