You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, May 8th 2012, 3:32pm

France, Q2/1942



[SIZE=5]Report for Q2/1942[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 22/27 factories producing 22,000t materials.
- 5/27 factories producing infrastructure
- 1,528t from stockpile.
- 0t from transactions.
- 660t from scrapping.
- 24,188t materials total.
- 20,089t used.
- 4,099t stored for Q3/42.

[SIZE=3]Infrastructure Development [/SIZE]
5 factories dedicated to IP, producing 0.5 IP. 1.0 IP added to half-factory, 4.0 IP remaining.

[SIZE=3]Naval Construction [/SIZE]

At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q2/1942 for a total of 18000 / 33000 tons. 15000 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q2/1942 for a total of 18000 / 33000 tons. 15000 / 33000 tons remaining. Launched June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Heavy Cruiser Jean Bart laid down January 1st, 1942. 17,700 tons required. 250 tons added in Q2/1942 for a total of 500 / 17700 tons. 17,200 / 17,700 tons remaining. Launch planned for June 24th, 1943. Completion planned for March 10th, 1944.
Class 3 Slip #2 - Heavy Cruiser Jeanne d'Arc laid down January 1st, 1942. 17,700 tons required. 250 tons added in Q2/1942 for a total of 500 / 17700 tons. 17,200 / 17,700 tons remaining. Launch planned for June 24th, 1943. Completion planned for March 10th, 1944.
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Contre-Torpillieur Barfleur (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 1 Slip #2 - Contre-Torpillieur La Rochelle (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 1 Slip #3 - Contre-Torpillieur Cap Lézard (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 1 Slip #4 - Contre-Torpillieur Baie de Chesapeake (Sabre class, Barfleur subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Dockside:
- Curaissier Libertie laid down January 1 1938. 45,986 tons required. 0 tons added in Q2/1942 for a total of 45986 / 45986. 0 / 45986 tons remaining. Launched Q2/1940. Ship completed April 30, 1942.
- Curaissier Justice laid down January 1 1938. 45,986 tons required. 0 tons added in Q2/1942 for a total of 45986 / 45986. 0 / 45986 tons remaining. Launched Q2/1940. Ship completed April 30, 1942.
- Merchant ship Bougainville converted into transport. 211 tons required. 211 tons added in Q2/42 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug Lyre refitted. 223 tons required. 223 tons added in Q2/42 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Light Repair Ship Règle acquired as naval auxiliary. 73 tons required. 73 tons added in Q2/42 for a total of 73 / 73 tons. 0 / 73 tons remaining; conversion completes.

At Brest (Cl 5)
Class 3 Drydock #1 - Heavy Cruiser Duquesne undergoing partial reconstruction. 4,857 tons requred. 1,500 tons added in Q2/1942 for a total of 3000 / 4857. 1857 / 4857 tons remaining. Reconstruction will complete October 11th, 1942.
Class 2 Drydock #1 - Contre-torpilleur Le Malin undergoes major refit. 428 tons required. 428 tons added in Q2/1942 for a total of 428 / 428. 0 / 428 tons remaining. Reconstruction completed May 23rd, 1942.
Class 1 Drydock #1 - Escorteur rapide Le Breton laid down January 1st, 1942. 1,185 tons required. 350 tons added in Q2/1942 for a total of 70 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1942. Completed November 6th, 1942.

Dockside:
- Contre-Torpillieur Sagaie (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q2/1942 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
- Contre-Torpillieur Casque (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q2/1942 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
- Freighter Japet acquired as naval auxiliary. 211 tons required. 211 tons added in Q2/42 for a total of 211 / 211 tons. 0 / 394 tons remaining; conversion completes.

At Abidjan (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Marseilles (Cl 5)
Class 4 Drydock #1 - Battleship Bretagne scrapping. 10 months to scrap. 939 tons recovered Q2/42 for total of 939 / 3129 tons recovered. 2190 tons remaining.
Class 3 Slip #1 - Contre-Torpillieur Cimeterre (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 3 Slip #2 - Contre-Torpillieur Dague (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 2 Drydock #1 - Light cruiser Turpin completes partial reconstruction. 1,930 tons requred. 830 tons added in Q2/1942 for a total of 1930 / 1930. 0 / 1930 tons remaining. Reconstruction completed June 14th, 1942.
Class 1 Slip #1 - Contre-Torpillieur Cognée (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 1 Slip #2 - Contre-Torpillieur Arquebuse (Sabre class, Cimeterre subclass) laid down January 1st, 1942. 2,100 tons required. 525 tons added in Q2/1942 for a total of 1050 / 2100 tons. 1050 / 2100 tons remaining. Launched May 14th, 1942. Completed December 4th, 1942.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Harbor tug Étangs des Dombes refitting. 27 tons added Q2/1942 for a total of 27 / 27 tons. Refit completed.

Dockside:
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 1000 tons added Q2/1942 for total of 34000 / 35000 tons. 1000 / 35000 tons remaining until completion on August 30th, 1942.
- TCD-1 Châteaurenault laid down January 1st, 1941. 7,539 tons required. 39 tons added in Q2/1942 for a total of 7539 / 7539. Completed on May 17th, 1942.
- Contre-Torpillieur Bouclier (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q2/1942 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.
- Contre-Torpillieur Rapière (Sabre-class) laid down June 1st, 1941. 2,100 tons required. 525 tons added in Q2/1942 for a total of 2100 / 2100 tons. 0 / 2100 tons remaining. Launched December 14th, 1941. Completion planned for May 4th, 1942.

At Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

Dockside:
- Freighter Le Chelif acquired as naval auxiliary (destroyer tender). 394 tons required. 394 tons added in Q2/42 for a total of 394 / 394 tons. 0 / 394 tons remaining; conversion completes.

At Tunis (Cl 5)
Class 4 Drydock #1 - Battleship Provence scrapping. 10 months to scrap. 939 tons recovered Q2/42 for total of 939 / 3129 tons recovered. 2190 tons remaining.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle

Dockside:
- Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 1000 tons added Q2/1942 for total of 33000 / 35000 tons. 2000 / 35000 tons remaining until completion on November 30th, 1942.

At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Saigon (Cl 5)
Class 4 Drydock #1 - Two craft laid down end to end. EDA-55 IE-1 laid down April 1st; 55 tons added Q2/42. Completed April 30th, 1942, launched. EDA-55 IE-2 laid down April 1st; 55 tons added Q2/42. Completed April 30th, 1942, launched.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down April 1st; 8 tons added Q2/42. Completed April 30th, 1942, launched. Vedette FOM 11m laid down April 1st; 12 tons added Q2/42. Completed April 30th, 1942, launched.
Class 0 Slip #2 - Idle

Dockside:
- Freighter Eukéladé acquired as naval auxiliary. 163 tons required. 163 tons added in Q2/42 for a total of 163 / 163 tons. 0 / 163 tons remaining; conversion completes.

Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Idle
Class 2 Drydock #1 - Contre-torpilleur Hoche undergoes major refit. 428 tons required. 428 tons added in Q2/1942 for a total of 428 / 428. 0 / 428 tons remaining. Reconstruction completed May 23rd, 1942.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

Dockside:
- None

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- DD Bouclier
- DD Rapière
- DD Sagaie
- DD Casque

[SIZE=3]From Factories[/SIZE]
2x Vedette Rapide 23m from factories (45 tons each).
4x Patrouilleur léger Type 1941 from factories (48 tons each).

[SIZE=3]Transactions[/SIZE]
EDA-55 IE-1 and IE-2 transferred to Indochina Patrouille Navale.
4x Patrouilleur léger Type 1941 transferred to Indochina Patrouille Navale.
2x Vedette Rapide 23m transferred to Indochina Patrouille Navale.
2x Vedette FOM 8m transferred to Indochina Patrouille Navale.
2x Vedette FOM 11m transferred to Indochina Patrouille Navale.

[SIZE=3]Other Notes [/SIZE]
None

[SIZE=3]Ships being scrapped [/SIZE]
- 2 Bretagne class battleships (3129 tons per ship)

- Total tonnage in recycling until Q2/1942: (10x66) = 660
- Total tonnage in recycling until Q3/1942: (10x66) = 660
- Total tonnage in recycling until Q4/1942: (9x136 + 15x141) = 3339
- Total tonnage in recycling until Q4/1942: (2x939) = 1878

[SIZE=3]Updated Order of Battle, End of Q2/1942[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction

The Fleet
Battleships: 7(0)+0-2
Battlecruisers: 4(0)+0
Aircraft Carriers: 7(0)+4
Heavy Cruisers: 12(1)+2
Light Cruisers: 29(1)+0
Coast Defense Ships: 5(0)+0
Destroyers: 64(0)+8
Corvettes: 20(0)+0
Escorteurs Rapides: 0(0)+1
Avisos: 8(0)+0
Fleet Submarines: 39(0)+0
Coastal Submarines: 64(0)+0
Motor Torpedo Boats: 12(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0

Fleet Train
Fast Oilers: 10(0)+0
Slow Oilers: 4(0)+0
Gasoline Tankers: 2(0)+0
Fleet Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 1(0)+0
Light Repair Ships: 2(0)+0
Ammunition Ships: 1(0)+0
Transports: 4(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 6(0)+0
Light Harbour Tugs: 2(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0

Amphibious Forces:
Dock Landing Ship: 1(0)+0
Vehicle Landing Ship: 2(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 4(0)+0
Tank Landing Craft (EDA): 9(0)+0
Infantry Assault Craft (EA): 29(0)+0

Patrouille Navale:
Tank Landing Craft (EDA): 2(0)+0
Motor Torpedo Boats: 2(0)+0
Vedettes: 4(0)+0
Light Patrol Boats: 4(0)+0