You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Kaiser Kirk

Lightbringer and former European Imperialist

  • Send private message

1

Friday, December 14th 2007, 7:45am

The Netherlands & Belgium, Q3 1935

Q3 1935 activity
United Kingdom of the Netherlands
(Belgium follows)

13/15 factories producing naval materials: 13,000 tons created for Q1/35 . 13,000 total tons + 241 stockpiled from previous quarter + 0 tons from scrapping = 13, 241 tons

13,241 tons used. 0 tons left for Q4/35

1/15 factories committed for 1935 to infrastructure development (TIDE related) = 0.1 ip
1/15 factories committed for 1935 to infrastructure development (economic aid to Belgium) = 0.1 ip

B. Infrastructure Development

+0.1 point to NEI , 0.7ip total

C. Naval Construction

Amsterdam:

Class 3 Slip :- Empty
Class 2 Slip :- Empty
Class 1 Slip :- Empty

Den Helder:

Class 4 Slip:- Piet Heyn laid down February 16, 1935, will build at 2,427 per quarter, launching on October 20th, 1936 and completing on April 28th, 1939.

Class 4 dry-dock : - Walcheren laid down July 1st, 1935, , launching on April 12, 1936, and completing on June 16, 1937, total 14,884 tons, 0 tons committed, 1,597 tons added this quarter.

Den Hague:

Class 3 Slip :- Empty
Class 2 Slip :- O-6, of 0-5 Zwaardfish class, laid down April 2, 1935, will build at 300 per quarter, launching on July 30th, and completing on January 26th, 1936.
Class 2 Slip :- Empty

Class 3 Dry-dock :- Empty
Class 2 Dry-dock :- Empty
Class 1 Dry-dock :- Empty

Ijmuiden:

Class 2 Slip :- Empty

Class 2 Dry-dock:- Empty

Rotterdam

Class 4 Slip :- Battleship Kortenaer laid down February 16, 1935, will build at 2,427 per quarter, launching on October 20th, 1936 and completing on April 28th, 1939.
Class 3 Slip :- Empty
Class 2 Slip :- Empty

Class 2 Dry-dock:- Empty

Vlissingen:

Class 3 Slip :- Empty
Class 2 Slip :- O-7, of 0-5 Zwaardfish class, laid down April 2, 1935, will build at 300 per quarter, launching on July 30th, and completing on January 26th, 1936.
Class 1 Slip :- Empty

AT THE EAST INDIES:

Surabaia (Soerabaja Naval Base):

Class 4 Dry-dock:- Empty

Class 0 slip : CMS laid down July 1st, 1935, 191 tons invested (100% paid Q3), launched May 222nd, will complete on November 19th of Q4.

Jakarta:
Class 0 slip : CMS laid down July 1st, 1935, 191 tons invested (100% paid Q3), launched May 222nd, will complete on November 19th of Q4.

Balikpapan Harbor:
Class 2 Dry-dock:- Empty
Class 1 Dry-dock:- Empty

Medan (Belawan harbor):
Class 2 Dry-dock:- Empty
Class 1 Dry-dock:- Empty

Wooden construction

Rotterdam (Port)

Jakarta (Port) :
12xMAS 1000, 75 tons added, Complete

Matabi, Kongo (Port) :
3x Wooden Putten class, KNK PC, 74 tons added, Complete

Paramaribo, Suriname (Port)

=========================Ships afloat: ============================

Amsterdam
CDS-10 Narden , Boerentange class, laid down July 1st, 3,379 tons received, 0 tons added, 4,000 tons balance.
SubmarineK-35, laid down January 2, 1935, 360 tons received, 180 tons added, 60 tons balance.
SubmarineK-36, laid down January 2, 1935, 360 tons received, 180 tons added, 60 tons balance.

Den Helder
BC Ijelsijk completes scrapping August 16th, 1935.

The Hague
Fleet Destroyer Z75, laid down February 16, 1935, will build at 629 per quarter,completing on January 27th, 1936.

Ijmuiden
Fleet Destroyer Z77, laid down February 16, 1935, will build at 629 per quarter,completing on January 27th, 1936.

Rotterdam
Fleet Destroyer Z74, laid down February 16, 1935, will build at 629 per quarter, completing on January 27th, 1936.

Vlissingen
CDS-9, Boerentange laid down July 1st, 3,379 tons received, 0 tons added, 4,000 tons balance.
Training Cruiser Witte de With , laid down Jan 2, 1935, will build at 700 per quarter, launching on May 23rd, 1935 and completing on December 21st 1935.

Oost-Vlieland

Surabaia (Soerabaja)
CMS laid down April 2, 1935, 191 tons invested (100% Q2), launched May 22nd, will complete on August 5th of Q3.

Paramaribo

Matadi

Jakarta
CMS laid down April 2, 1935, 191 tons invested (100% Q2), launched May 22nd, will complete on August 5th of Q3.

Balikpapan
Fleet Destroyer Z75, laid down February 16, 1935, will build at 629 per quarter, completing on January 27th, 1936.

Medan

C. Ships on shakedown cruises:

1st Three Months
De Hollandia , 45 days post refit.

2nd Three Months
MSW-21
MSL-16
Z45-Z52, 45 days post refit.
Zx-21, 45 days post refit
Cx Den Helder, 27 days post refit

D. Transactions

0.1 ip to Belgium.

E. Other Notes

Important : On CMS construction, all funds for completion are spent this quarter, even if full construction will take into next quarter.

Post treaty: The Dutch will provide Section K information to all remaining Cleito participants. Physical inspection of the work in progress to verify dimensions will also be offered during the first quarter of construction.

Battleships of the Kortenaer Class : est. 44,000 tons standard, 242m x 33m x 9.8m. (final version differs slightly from that posted in ship design)
Carriers of the Walchern Class : est. 16,000 tons standard, 220m x 24.5m x 6.5m
Training cruiser Witte de With class: est. 3,000 tons standard, 120m x 13m x 4.8m
Fleet Destroyers of the Z74 class : est. 2,650 tons standard, 135m x 12.4m x 3.9m
Submarines of the 0-5 class : est 1,000 tons standard, 84m x 6.75m x 4m
Submarines of the K-35 class : est. 600 tons standard, 42m x 8m x 5.33m

1,110 tons is allocated to coastal defense guns

424 - 1 battery of 240mm ( 1 x 8 ) in emplacements at Paramaribo, Dutch Guiana
266- 1 battery of 305mm HOW ( 1 x 8 ) in emplacements at Belewan (Medan), Sumatra, Malay Archipelago
420- 7 batteries of 125mm ( 7 x 8 ) in emplacements at Belewan (Medan), Sumatra, Malay Archipelago

F. Updated Order of Battle-

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

CV: 3 (0) 1
BB: 5 (0) 2
BC: 2 (0) 0
CDS:1(0) 2
CA: 4 (0) 0
CL: 24 (0) 0
DDA: 12 (0) 4
DD(b) : 44 (0) 0
Fleet Submarine: 5 (0) 3
Coastal Submarine: 32 (0) 0

Unlimited:

Escorts: 85 (0) 0
Gunboats : 36 (0) 0
Patrol craft : 86 (0) 3
Coastal ASW : 14 (0) 0
MAS : 154 (0) 12

Fleet Minelayers : 16 (0) 0
Fleet Minesweepers: 21 (0) 0
Coastal Minesweepers: 42 (0) 2

Training ships : 5 (0) 1
Target ships : 4 (0) 0
Experimental : 3 (0) 0

Seaplane carrier : 2 (0) 0

Tender, Seaplane : 6 (0) 0
Tender, Destroyer : 4 (0) 0
Tender, Sub : 2 (0) 0

Troop Transports : 2 (0) 0
Landing craft : 4x BDA, 10x BDS

Yacht : 1 (0) 0


Kingdom of Belgium
production at 75 % due to recession.
0.5/4.5 factories producing naval materials: 500 tons created for Q1/35 . 500 total tons + 0 stockpiled from previous quarter + 0 tons from scrapping = 500 tons

124 tons used. 376 tons left for Q4/34
1/4.5 factory production lost to economic disturbance.
3/4.5 factories committed for 1935 to infrastructure development = 0.3 ip + 0.1 ip from the Netherlands

B. Infrastructure Development

+0.4 point to Belgium, 9.4 ip total

C. Naval Construction

Zeebrugge:
Class 1 slip :- Empty
Class 1 slip :- Empty

Class 1 drydock :- Empty

Ostend:
Class 0 slip :- Empty
Class 0 slip:- Empty

1 Class 0 drydock:- Empty

Antwerp:
Class 3 slip :- Empty
Class 1 slip :-
Class 0 slip :- Empty

Class 3 drydock:-
Class 2 drydock:-
Class 1 drydock:-


=========================Ships afloat: ============================
Zeebrugge:

Ostend:

Antwerp:
Dutch BC, Buitengewoon will finish scrapping August 16th, 1935

Belgian Sloop, Artevelde, commences construction Feb 10th, 1935, 124 tons added, Complete

F. Updated Order of Battle-
SC Zinnia

TB 9xA-1
TB 5xA-21

22 vedettes

D. Transactions
received 0.1ip from the Netherlands

E. Other Notes
None

This post has been edited 2 times, last edit by "Kaiser Kirk" (Apr 14th 2008, 5:48am)


Kaiser Kirk

Lightbringer and former European Imperialist

  • Send private message

2

Monday, April 14th 2008, 5:51am

Edit

While preparing my Q4 report, I double checked when the tonnage from scrapping the 2x BB Ijelsijks (starting in Q4, 1934 to comply with Clieto) and finishing Q3, 1935, would be available. This led to an awareness that I had made the tonnage from the 4x Palembang available a quarter early.

I have removed the Q3 tonnage from scrap, eliminated the surplus for Q4, and reduced the amount invested in CV Walcheren to zero out the Q3 accounting.