You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, January 26th 2011, 2:20am

Lithuania, 1Q/37

Q1, 1937

Industrial Allocation
- 0/2 factories producing 0t materials.
- 2/2 factories producing 0.2 IP infrastructure (dedicated)
- 2,000t from stockpile.
- 2,000t used, 0t to stockpile.

Infrastructure Development
0.2 IP to new Type 1 Slip at Palanga.

Naval Construction
at Klaipeda:
D1: ML-1 Jotvingis laid down on October 1st, 1936. 500 tons added in Q1/37. 1200 tons total required; 0 remaining until completion. Ship launches on February 3rd.
S1: DD-5 Aukstatis laid down on October 1st, 1936. 1,000 tons added in Q4/36. 2300 tons total required; 0 remaining until completion. Ship launches on February 15th.
S0: Idle
S0: Submarine S-1 laid down January 1st, 1937. 500 tons added in Q1/37. 500 tons total required; 0 remaining until completion. Ship launches on April 30th.

at Palanga:
D2: (under construction by Germans)
S1: (under construction by Lithuanians)

From factories:
N/A

Dockside:
N/A

On Trials
- DD-3 Gediminaiciu Stulpai on trials from November 1st, 1936, to April 1st, 1937.
- DD-4Tautiska giesme on trials from November 1st, 1936, to April 1st, 1937.

Transactions
NA

Other Notes

Order of Battle (Lithuanian Navy) end of Q1 1937
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Coast Defense Ships:..........0(0)0
Destroyers:.......................4(0)1
Minelayers:.......................0(0)1
Submarines:.....................0(0)1
Patrol Gunboats:................4(0)0
Mine sweepers:.................1(0)0
Motor Torpedo Boats:........20(0)0
Auxiliary Icebreakers:.........2(0)0
Tugboats:.........................2(0)0

Summary
Destroyer Leader Aukstatis and minelayer Jotvingis launched in Klaipeda. Submarine S1 laid down in Klaipeda. Construction begins on new naval base in Palanga (to replace base in Klaipeda lost to the Germans).