You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, January 6th 2010, 6:53pm

Chile Q3/1938



[SIZE=3]Industrial Allocation[/SIZE]
- 9/9 factories producing 9000t materials.
- 300t from stockpile.
- 1,145 tons from transactions
- 10,445t materials total.
- 10,445t used.
- 0t stored for Q4/38.

[SIZE=3]Infrastructure Development[/SIZE]
N/A

[SIZE=3]Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano:
D3.5: CV-02 Libertad laid down January 1st, 1938. 2,500 tons added Q3/38; 25,275 tons required, 18,879 tons remaining until completion on October 9th, 1940. Ship will launch on February 20th, 1939.
S3: idle
D2: idle
D2: Five Alacalufes-class tugs laid down for China, end-to-end. 75 tons added to each (total 375 tons). All vessels laid down July 1st, 1938, and launched August 1st, 1938. On trials until September 1st, 1938.
S2: idle
S1: idle
D0: idle

ASMAR - Astillero de Valparaíso:
S1: YTB-1 Alacalufes laid down July 1st, 75 tons added, launched and completed August 1st, on trials until September 1st.
S1: idle
D1: idle

Passenger steamships Presidente and Independencia under construction in civilian yards of ASMAR Astillero de Valparaíso.

ASMAR - Astillero de Mejillones:
S0: Chinese Export Tug #1 laid down July 1st, 1938. 255 tons added Q3/38. Ship scheduled for launch October 26th, 1938, and completion on April 18th, 1939.
S0: Chinese Export Tug #2 laid down July 1st, 1938. 255 tons added Q3/38. Ship scheduled for launch October 26th, 1938, and completion on April 18th, 1939.
D0: Chinese Export Tug #3 laid down July 1st, 1938. 255 tons added Q3/38. Ship scheduled for launch October 26th, 1938, and completion on April 18th, 1939.

from factories:
N/A

Dockside:
- CA-03 Constitucion laid down October 1st, 1936; 18,955 tons required in total, 1,000t tons added in Q3/38; 630 tons remaining until completion. Ship launched on September 4th, 1937; scheduled for completion in Q4/1938.
- CVE-03 Chiloe receives 925 tons, 4,000 tons required in total, 1,411 tons remaining until completion, scheduled for Q4/1938.
- DD-41 General Mackenna laid down October 1st, 1937. 263 tons added in Q3/38, completed on August 21st, 1938.
- ADT-03 Lago O'Higgins, converted from civilian freighter, 38 tons added, begins trials.

On Trials
- DD-37 General San Martin on trials from February 22nd to August 22nd.
- DD-38 Capitan Ferguson on trials from February 22nd to August 22nd.
- DD-39 Capitan Chavez on trials from May 22nd to November 22nd.
- DD-40 Capitan Rodríguez on trials from May 22nd to November 22nd.
- DD-41 General Mackenna on trials from August 22nd to February 22nd.

[SIZE=3]Transactions[/SIZE]
- 2500 tons to Atlantis for light cruisers Warrior and Triumph
- 800 tons to Atlantis for destroyers of Alphabet-C class.
- 1195 tons to Atlantis for rebuild of four Alphabet-C class destroyers
- 1,145 tons from China for construction of three Type-A Export Fleet Tugs and five Alacalufes-class yard tugs.

[SIZE=3]Other Notes[/SIZE]
Ship design committees are working on the following projects:
- Proyecto-E: Project due by December 1938; currently in detail design.
- Proyecto-F: Project due by December 1938; currently in detail design.
- Proyecto-G: Project due by December 1938 (possible delay until August 1939); currently in detail design.

Technology development and investigatory committees are working on the following projects:
- "Kodkod": June 1939 (General Mackenna equipped with prototype)
- "Colocolo": January 1940.
- "Sorcery": July 1938 (project started 1936)
- "Zorro": Target date not set.
- "Coati": Target date not set.
- "Pudu": Target date not set.

[SIZE=3]Order of Battle (Armada de Chile) end of Q3 1938[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Dreadnought Battleships:............2(0)+0
Dreadnought Battlecruisers:........2(0)+0
Coast Defense Ships:.................1(0)+0
Aircraft Carriers:........................1(0)+2
Armoured Cruisers:....................3(0)+0 {1 Leased to Columbia}
Heavy Cruiser:...........................2(0)+1
Light Cruisers:...........................8(0)+0
Floatplane Cruisers:...................1(0)+0
Destroyers:...............................34(0)+0 {1,200 tons std and up}
Destroyer Escorts:.....................16(0)+0
Light Destroyers:.......................2(0)+8 {under 1,200 tons std}
Submarines:.............................8(0)+1
Floatplane Carriers:...................2(0)+0
Subchasers:.............................24(0)+0
Minesweepers:.........................12(0)+0
Arctic Patrol Vessel:..................1(0)+0

Fleet Train:
Destroyer Tenders:...................2(0)+0
Subchaser Tenders:..................2(0)+0
General Fleet Tenders:..............1(0)+0
Fleet Oilers:.............................4(0)+0
Colliers:...................................1(0)+0
Sail Training Sloop:..................1(0)+0
Attack Transports:....................4(0)+0
Transports:..............................2(0)+0

Emergency Use:
Patrol Boats:..........................11(0)+0
Transports:............................12(0)+0
Museum Ships:.......................1(0)+0

[SIZE=3]Summary[/SIZE]

2

Thursday, January 7th 2010, 3:28pm

Corrected an error in the above report. I incorrectly tallied the amount of tonnage required to rebuild the eight purchased Alphabet Destroyers as I wanted; so four are being rebuilt this quarter, and four next quarter (rather than all eight right now). This meant Chiloe's reconstruction actually got more materials.