You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, August 17th 2013, 10:24pm

Kingdom of Greece Q1 1944

[SIZE=5]Q1 1944[/size]

[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 0t from Stockpile
- 1,500t in from Transactions
- 0t out in Transactions
- 0t in from Scrap
- 11,500t Total materials available
- 10,695t used
- 805t stored for Q2/1944

[size=3]Infrastructure Development[/size]
Thessaloniki:
- 0.5 IP added to construct Type 2 Drydock at Thessaloniki. 1.0 installed, 2.0 IP remaining.

[SIZE=3]Naval Construction[/SIZE]

Attica:
D3: - C-4 Helle begins Partial Reconstruction on January 2nd, 1944. 6,407 tons required; 1602 / 6407 added Q1/44 for a total 1602 / 6407. 4,805 tons remaining.
D3: - C-5 Kriti begins Partial Reconstruction on January 2nd, 1944. 6,407 tons required; 1602 / 6407 added Q1/44 for a total 1602 / 6407. 4,805 tons remaining.
D2: Idle
S2: Idle
S2: Idle
S2: Idle
S1: - Fleet Support Tanker Borysthenis laid down January 4th, 1944. 1,950 tons required; 487.5 / 1950 added Q1/44 for a total 487.5 / 1950. 1,462.5 tons remaining.
S0: - Fleet Tug T4206 laid down January 5th, 1944. 685 tons required; 170 / 685 added in Q1/44 for a total of 170 / 685. 515 tons remaining.
S0: Idle

Dockside:
- C-41 Geryon ex-Chapra Construction resumes July 1st, 1942. 10,183 tons required; 1504 / 10183 added Q1/44 for a total 10183 / 10183. 0 tons remaining. Ship launched June 13th, 1943. Completes March 15th, 1944. Begins trials March 20th, 1944. Completes trials September 23rd, 1944.
- AC-9 Thermopylae begins Major Refit on July 2nd, 1943. 7,120 tons required; 1994 / 7120 added Q1/44 for a total 5125 / 7120. 1,995 tons remaining. Ship re-launched January 13th, 1944.

Paros:
D1: Idle
D0: Idle

Dockside:

Patra:
D1: Idle
S1: - Fleet Support Tanker Hypate laid down January 3rd, 1944. 1,950 tons required; 487.5 / 1950 added Q1/44 for a total 487.5 / 1950. 1,462.5 tons remaining.
D0: Idle

Dockside:

Salamis:
D1: Idle

Dockside:

Souda Bay:
D4: Idle
D3: Idle
S2: Idle
D2: Idle
D1.5: Idle
D1.5: Idle
D1.5: Idle

Dockside:

Thessaloniki:
D2: - Under construction. Began October 1st, 1943. 3.0 IP required; 0.5 / 3.0 added in Q1/44 for a total of 1.0 / 3.0. 2.0 IP remaining.
D0: Idle
S0: - Fleet Tug T4204 laid down January 5th, 1944. 685 tons required; 172 / 685 added in Q1/44 for a total of 172 / 685. 513 tons remaining.
S0: - Fleet Tug T4205 laid down January 5th, 1944. 685 tons required; 172 / 685 added in Q1/44 for a total of 172 / 685. 513 tons remaining.

Dockside:

Volos:
D1: Idle

Dockside:

Limassol:
D3: Idle
D1: Idle

Dockside:
- C-42 Typhon ex-Chiplun Construction resumes July 1st, 1942. 10,183 tons required; 1504 / 10183 added Q1/44 for a total 10183 / 10183. 0 tons remaining. Ship launched June 13th, 1943. Completes March 15th, 1944. Begins trials March 20th, 1944. Completes trials September 23rd, 1944.

From factories:
- CML-21 ML200 class 200t Coastal Minelayer
- CML-22 ML200 class 200t Coastal Minelayer
- CML-23 ML200 class 200t Coastal Minelayer
- CML-24 ML200 class 200t Coastal Minelayer
- CML-25 ML200 class 200t Coastal Minelayer

On Trials:
- C-40 Artemis Begins trials October 10th, 1943. Completes trials April 14th, 1944.
- C-43 Hephaestus Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-44 Dionysis Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-45 Hera Begins trials January 10th, 1944. Completes trials July 10th, 1944.

[size=3]Transactions[/size]
- Received 1,500t from Mexico towards the purchase of 4 Leon class Destroyer Leaders and 7 Kolokotronis class Destroyers. Payment 2 of 3.

[size=3]Other Notes[/size]

[size=3]Order of Battle (Greek Navy) Q1 1943[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 4(0)+2
Medium Cruisers 2(0)+0
Light Cruisers 19(0)+0
Aircraft Carriers 1(1)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+0
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 12(0)+0

Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (165t) 20(0)+5
Harbour Launches (65t) 21(0)+0
MTB 96(0)+0
MGB 27(0)+0
MMS 22(0)+0

Auxiliaries
Special transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 8(0)+2
Fleet Tugs 3(0)+3
Harbour Tugs 0(0)+0

Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0

This post has been edited 1 times, last edit by "Sachmle" (Aug 17th 2013, 10:25pm)