You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Wednesday, May 31st 2006, 4:02pm

Quarterly Report #40 for the SAE

Note: I noticed that there still were a few minor errors in my Q3 report which I corrected (like a ship being laid down on a slip instead of a dock, ship names etc. - things that happen when you do the copy´n paste).

[SIZE=3]SAE Quarterly Reports [/SIZE]

No. 40 – October to December 1930


[SIZE=3]Transfers: [/SIZE]

None


[SIZE=3]Factories: [/SIZE]

26 factories total can be used.

Fixed factories

4 factory will be fixed to produce infrastructure points for 1930.

Flexible factories

3534ts material transferred from Q3 (incl. material recovered from scrapyard).

15,894ts material necessary to be produced in this quarter (16 factories).

6 factories will produce infrastructure points this quarter.

Infrastructure points used this quarter:

1,2pts put into a new Type 1 Dock in Port Louis for a total of 1,9pts at the end of Q4.
0,2pts to expand a Type 2 Slip in Port Elizabeth for a total of 4,0pts at the end of Q4.


[SIZE=3]Ships:[/SIZE]

Minor vessels

Completed Units

48x UJ26-class ASW launch

32x R28-class motor launch

15x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
8x MS28-class minesweeper

4x Polar-class sloops
16x S-class sloops
1x Circe-class sloops

16x River-class frigate

8x Pleiades-class light destroyers
6x Planet-class light destroyers

6x Guard-class patrol crafts

On Trials

8x R28-class motor launch
- R33-R40 running trials until December 30

4x UJ30-class ASW launch
- UJ49-UJ52 running trials until December 30

Ordered Units

8x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
- MS28-16 laid down in Port Louis on a Type 0 slip in March, completed December 30
- MS28-15 laid down in Montevideo on a Type 0 slip in February, completed November 30
- MS28-14 laid down in Montevideo on a Type 0 slip in February, completed November 30
- MS28-10 laid down in Buenos Aires on a Type 0 slip in February, completed November 30
- MS28-11 laid down in St. Helena on a Type 1 slip in January, completed October 30
- MS28-9 laid down in St. Helena on a Type 0 slip in January, completed October 30
- MS28-13 laid down in St. Helena on a Type 1 slip in November, completed August 31
- MS28-12 laid down in St. Helena on a Type 0 slip in November, completed August 31

2x LD29-class light destroyer (10 month á 58ts material necessary per unit)
- Pluto laid down in Buenos Aires on a Type 1 slip in January, completed October 30
- Neptune laid down in Mar del Plata on a Type 1 slip in January, completed October 30

1x SL29-class sloop (11 month á 100ts material necessary per unit)
- Medusa laid down in Montevideo on a Type 4 slip in March, completed December 30

8x R28-class motor launch (1 month á 92ts material necessary per unit)
- R41-R48 build in Lüderitz in December

8x UJ30-class ASW launch (1 month á 196ts material necessary per unit)
- UJ53-UJ56 build in Lüderitz in October
- UJ57-UJ60 build in Lüderitz in November

Rebuilds

None

Scrapping

4x SL14-class (4 month total, 2 month in Type 0 dock)
- Sentinel scrapping in Durban starting in January, finished in April – 142ts received from hull for Q4/1930
- Surprise scrapping in Douala starting in March, finished in June – 142ts received from hull for Q4/1930
- Swan scrapping in Libreville starting in February, finished in May – 142ts received from hull for Q4/1930
- Swift scrapping in Durban starting in June, finished in September – 142ts received from hull for Q1/1931


Destroyers

Completed Units

12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)

12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)

7x DL28-class destroyer leader (Type 28)

On Trials

1x DL28-class destroyer leader
- Scythe running trials until December 30

Ordered Units

8x DD30-class destroyer (11 month á 145ts material necessary per unit)
- Pontoporeia laid down in Durban in a Type 1 slip in January, completed in November 30
- Proto laid down in Cape Town in a Type 1 slip in January, completed in November 30
- Protomedeia laid down in Port Elizabeth in a Type 1 slip in January, completed in November 30
- Sao laid down in Daressalam in a Type 1 slip in January, completed in November 30
- Speio laid down in Douala in a Type 1 slip in January, completed in November 30
- Themisto laid down in Majunga in a Type 1 slip in March, completed in January 31
- Pronoe laid down in Cape Town in a Type 2 slip in April, completed in February 31
- Psamathe laid down in Daressalam in a Type 2 slip in April, completed in February 31

Rebuilds

None

Scrapping

None


Class B Cruisers

Completed Units

6x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
1x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser

On Trials

2x CL16-class light cruiser
- Pelotas running trials until February 31
- Rio Grande running trials until February 31

2x CL29-class light cruiser
- Douala II running trials until November 30
- Pietermaritzburg II running trials until January 31

Ordered Units

2x CL29-class light cruiser (17 month á 458ts material necessary per unit)
- Blantyre II laid down in Port Louis on a Type 2 slip in March, completed in July 31
- Beira II laid down in Buenos Aires on a Type 2 slip in January, completed in May 31

4x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
- Fenris laid down in Durban in a Type 3 Dock in January, completed in December 30
- Kweldulf laid down in Cape Town in a Type 2 Dock in January, completed in December 30
- Freki laid down in Durban on a Type 2 Slip in July, completed in June 31
- Cerberus laid down in Mar del Plata on a Type 2 Slip in December, completed in November 31

Rebuilds

3x CL16-class light cruiser (12 month á 192ts/month material necessary per unit)
- Santa Marina entering a Type 2 dock in Daressalam in November. Leaving the dock in March 30, the cruiser will stay in the yard until October 30
- Santana entering a Type 3 dock in Daressalam in September. Leaving the dock in January 31, the cruiser will stay in the yard until August 31
- Parana entering a Type 2 dock in Daressalam in November. Leaving the dock in March 31, the cruiser will stay in the yard until October 31

Scrapping

5x TB18-class (5 month total, 2 month in Type 1 dock)
- Gadfly scrapping in Montevideo starting in January, finished in May – 296ts received from hull for Q4/1930
- Mantis scrapping in Buenos Aires starting in February, finished in June – 296ts received from hull for Q4/1930
- Flea scrapping in Port Elizabeth starting in May, finished in September – 296ts received from hull for Q1/1931
- Mosquito scrapping in Durban starting in August, finished in December – 296ts received from hull for Q2/1931
- Dragonfly scrapping in Buenos Aires starting in July, finished in November – 296ts received from hull for Q2/1931


Class A Cruisers

Completed Units

1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)

On Trials

1x Dragon-class heavy cruiser
- Ladon running trials until March 31

Ordered Units

1x CA29-class heavy cruiser (21 month á 545ts material necessary per unit)
- Fafnir laid down in Curban on a Type 3 slip in August, completed in April 31

Refits

None

Scrapping

1x General-class (10 month total, 4 month in Type 4 dock)
- Hegendorff scrapping in Montevideo starting in December, finished in November – 1.623ts received from hull for Q4/1930, guns of first, second and third battery stored


Capital Units

Completed Units

2x Hertog-class
4x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class

On Trials

None

Ordered Units

None

Rebuilds

None

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class
1x Tyrfing-class

2x LCDS-class
1x LCDS-2-class

On Trials

1x LCDS-2-class coast defense ship
- Nagelfar running trials until January 31

Ordered Units

1x CDS5-class coast defense ship (17 month á 448ts material necessary per unit)
- Gungnir laid down in Cape Town on a Type 3 slip in June, completed in October 30


Carriers

Completed Units

1x CV25B-class
1x CV26-class

Ordered Units

2x CV30-class light fleet carrier (23 month á 587ts material necessary per unit)
- Anvil laid down in Cape Town on a Type 3 slip in January, completed in November 31
- Gripper laid down in Buenos Aires on a Type 3 slip in August, completed in June 32

On Trials

None

Ordered Units

None


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

9x G-class submarine
15x I-class submarine
12x H-class submarine
16x K-class submarine

On Trials

None

Ordered Units

None

Scrapping

6x G-class (4 month total, 1 month in Type 0 dock)
- G3 scrapping in Montevideo starting in January, finished in April – 69ts received from hull for Q4/1930
- G1 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q4/1930
- G4 scrapping in Montevideo starting in May, finished in August – 69ts received from hull for Q1/1931
- G2 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q1/1931
- G5 scrapping in Montevideo starting in September, finished in December – 69ts received from hull for Q2/1931
- G7 scrapping in St. Helena starting in August, finished in November – 69ts received from hull for Q2/1931


Non-combatants

Completed Units

0x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)

4x Mimir-class floatplane carriers

2x Bölthorn-class floatplane carrier

On Trials

1x Thjazi-class floatplane carrier
- Thjazi running trials until March 31

1x TD Bonny Bay-class tender
- Bonny Bay running trials until April 31

Ordered Units

1x Thjazi-class floatplane carrier (15 month á 354ts material necessary per unit)
- Ymir laid down in Montevideo on a Type 2 slip in July, completed in September 31

Refit

None

-----------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

48 ASW launches
32 motor launches
39 minesweepers
57 small patrol crafts
83 TB/DD/DLs of less than 2,000ts (does not include 11 TBs with 15cm guns)
37 cruisers category b (include 11 TBs with 15cm guns)
7 cruisers category a
14 capital units
5 costal defence ships
2 fleet carrier
52 submarines category b
32 submarines category a
5 floatplane carriers
16 armed tenders

plus numerous auxiliary vessels of all kind.