Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, October 26th 2004, 11:06pm

Philippines Q1/25

Marina de Filipinas
1925 First Quarter Report
1 January-31 March


A. Factories

5/11 factories = 5,000t of material + 61t stockpiled + 164t from scrapping = 5,225t available
3225t are used, and 2000t transferred, leaving a stockpile of 0t.

5/11 factories (committed) = 0.5 infrastructure pts +
1/11 factories (flexible) = 0.1 pts = 0.6 pts available

B. Infrastructure Development

Completed upgrade of Type 1 slip at Manila to Type 4
0.3 points alotted = 3 total/3 needed = complete

Began construction of Type 2 slip at Butuan
0.3 points alotted = 0.3 total/2 needed = 1.7 needed to complete

C. Naval Development and Construction

at Manila:
S4: idle
S3: idle
S1: DD Martinete laid down 1 Jan; receives 499t, balance 912t, completes 16 Oct
-Uses guns from scrapped D-8; one month subtracted from build time-
D2: DD D-8 completes scrapping 12 Jan, recovered 33t this quarter
AC Mindoro begins scrapping 2 Feb, recovered 300t, 581t remaining, completes 9 Sept
D1: idle
Dockside: DD Rabijunco receives 475t, balance 44t, completes 14 Apr

at Butuan:
S2: *under construction*
S1: idle
S0: idle
S0: idle
S0: idle
S0: idle
D3: Basilan completes scrapping 8 Feb; recovered 376t this quarter
Dockside: DD Zampullín receives 81t, commissioned 15 January
Dockside: PB Avispa receives 145t, commissioned 10 February
Dockside: DD Cormorán launched 1 March; receives 600t, balance 365t, completes 14 Jul

at San Fernando:
S2: CDS Panabo laid down 1 Jan; receives 1200t, balance 6368t, completes 19 May 26
D1: CE Mindanao scrapping; recovered 525t this quarter, 75t remains, finishes 22 Apr 25
D0: idle

at Puerto Princesa:
S0: GB G100-1 laid down 1 Jan; receives 225t, balance 253t, completes 16 May

Commericial shipyards:
idle

D. Transactions

2,000 tons of material transferred to Italy to build AO Bambú.

E. Other Notes

Ships laid down this quarter: one coast defense battleship, one destroyer and one gunboat.

MS MSC-9, DD Alcatraz complete shakedown cruises.

DD Pelícano, Águila; SS Tiburón, PB Abejorro continue shakedown cruises

DD Zampullín and PB Avispa begin shakedown cruises.

F. Scrappage Report
2 x 8" guns recovered from scrapping will become available in Q2/25
10 x 6" guns recovered from scrapping will become available in Q2/25
15 x 3" guns recovered from scrapping will become available in Q2/25
164 tons of material recovered from scrapping will become available in Q2/25
234 tons of material recovered from scrapping will become available in Q3/25
958 tons of material recovered from scrapping will become available in Q4/25
572 tons of material recovered from scrapping will become available in Q1/26
300 tons of material recovered from scrapping will become available in Q2/26

Stockpiled Guns:
7 x 3" (Mk VI)
6 x 6" (three twin turrets, Mk 12)

G. Updated Order of Battle, 31 March 1925

Note: X(Y)+Z = completed (under repair/refit) + under construction

Second class battleships 2(0)+0
Coast defense battleships 0(0)+1
Armoured cruisers 1(0)+0
Light cruisers 1(0)+0
Escort cruisers 3(0)+0
Destroyers 14(0)+3
Submarines 1(0)+0
Torpedo boats 3(0)+0
Gunboats 0(0)+1
Patrol boats 2(0)+0
Minesweepers (coastal) 9(0)+0
Minelayers 1(0)+0
Oilers 0(0)+1 building in Italy

------------


2

Tuesday, October 26th 2004, 11:08pm

Official Stats

The 'official' versions of Q1's new classes:

Stats of Panabo-class Battleship:
Category: Coast Defense Armourclad
Keellaying Date: 'B-4' 1/1/25, 'B-5' 1/1/26
Anticipated Completion Date: 'B-4' 19/5/26, 'B-5' 19/5/27
Displacement: 7,950 tons standard
Dimensions (in feet): 408 x 63.5 x 21.3
Armament: 4 x 305mm, 10 x 130mm, 8 x 2-pdr, 8 x 25mm

Stats of G100-class Gunboat:
Category: Unrestricted (under 600 tons)
Keellaying Date: G100-1 1/1/25, following units TBD
Anticipated Completion Date: G100-1 16/5/25, following units TBD
Displacement: 500 tons standard
Dimensions (in feet): 172 x 28 x 9
Armament: 4 x 100mm, 1 x 57mm, 2 x 13.7mm