[SIZE=5]Q3 1939[/size]
[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 1815t from Stockpile
- 1200t from Transactions
- 13,015t Total materials
- 10,842t used
- 2,173t stored for Q4/1939
[size=3]Infrastructure Development[/size]
Limassol:
- 0.5 IP (dedicated) added to Type 1 Drydock in Limassol. 1.0 IP remaining.
[SIZE=3]Naval Construction[/SIZE]
Attica:
D3: Idle
D3: Idle
D2: Idle
S2: - Banat, Romanian Cruiser laid down July 1st, 1939. 5,988 tons required; 1200 / 5988 added Q3/39 for total 1200 / 5988. 4,788t remaining until completion.
S2: Idle
S1: - D-95 Eptanisa laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q3/39 for total 584 / 2175. 1,591t remaining until completion.
S1: - D-96 Kerkyra laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q3/39 for total 584 / 2175. 1,591t remaining until completion.
S0: Idle
S0: Idle
Dockside:
- B-6 Lysandros laid down January 1st, 1936. 37,000 tons required; 3000 / 37000 tons added Q3/39 for total 30650 / 37000. 6,350 tons remaining until completion. Launched.
- B-7 Perikles laid down January 1st, 1936. 37,000 tons required; 3000 / 37000 tons added Q3/39 for total 30650 / 37000. 6,350 tons remaining until completion. Launched.
Paros:
D1: Idle
D0: Idle
Dockside:
Patra:
D1: Idle
S1: - D-97 Paxi laid down July 1st, 1939. 2,175 tons required; 584 / 2175t added Q3/39 for total 584 / 2175. 1,591t remaining until completion.
D0: Idle
Dockside:
Salamis:
D1: Idle
Dockside:
Souda Bay:
D4: Idle
S2: Idle
D1: Idle
D1: Idle
D1: Idle
Dockside:
- C-36 Gaugamela laid down January 1st, 1938. 15,515 tons required; 0 / 15515 tons added Q3/39 for total 15515 / 15515. 0 tons remaining until completion. 24.6 months to construct. Completes January 20th, 1940.
Thessaloniki:
D0: Idle
S0: Idle
S0: Idle
Volos:
D1: Idle
Dockside:
Limassol:
D3: Idle
D1: - Under construction
From factories:
- GB-21, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-22, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-23, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-24, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-25, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-26, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- CMSW-21, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-22, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-23, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-24, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-25, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-26, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
On Trails:
[size=3]Transactions[/size]
[size=3]Other Notes[/size]
[size=3]Order of Battle (Greek Navy) end of Q3 1939[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Fleet Combatants
Battleships 3(0)+2
Large Cruisers 3(0)+1
Carriers 6(0)+0
Training Carrier 1(0)+0
Heavy Cruisers 2(0)+0
Light Cruisers 5(0)+0
Scout Cruisers 6(3)+0
Escort Cruisers 6(0)+0
Flotilla Leaders 4(0)+0
Destroyers 59(0)+3
Submarines 46(0)+0
Torpedo Boats 10(0)+0
Small Combatants
Large Gunboats 14(0)+0)
Small Gunboats/Subchasers 26(0)+0
Minelayers 5(0)+0
Minesweepers 40(0)+0
Coastal Minesweepers 26(0)+0
Harbour Launches 3(0)+0
Other Small Combatants 145(0)+0
Auxiliaries
Special transports 5(0)+0
Landing Craft 32(0)+0
Training Ships 4(0)+0
Tenders 4(0)+0
Fleet Train 11(0)+0
This post has been edited 2 times, last edit by "Sachmle" (Jun 30th 2010, 7:53am)