Dear visitor, welcome to WesWorld.
If this is your first visit here, please read the Help. It explains in detail how this page works.
To use all features of this page, you should consider registering.
Please use the registration form, to register here or read more information about the registration process.
If you are already registered, please login here.
Poland Q2/33
Poland Q2 1933
A. Factories
2/4 factories = 2000t produced + 4000t stockpiled + 1000 transferred = 7000t
2860t used, 4140t stockpiled
2/4 factories (committed) = 0.2IP’s
0/4 factories (flexible)
B. Infrastructure Development
Factory P5 (0.1P used, 5.0P to complete)
C. Naval Development and Construction
at Danzig:
1 Type 2 slip CA Vz31 1, 2860t used (2000t to complete), launched May 01 33
1 Type 1 slips idle
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 2 drydock extending (0.1 IP’s, 0.8 IP’s to complete)
Type 0 drydocks idle
D. Transactions
1000t transferred from Yugoslavia
E. Other Notes
Ships laid down this quarter: none
F. Scrappage Report
none
G. Updated Order of Battle, 30 June 1933
Note: (Y)+Z = completed (under repair/refit) + under construction
BB: 2(0)+0
CA: 0(0)+1
CL: 1(0)+0
DD: 4(0)+0
FTB: 11(0)+ 0
AG: 3(0)+0
SS: 6(0)+0
This post has been edited 1 times, last edit by "perdedor99" (Jun 6th 2007, 2:48am)