You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, January 27th 2007, 6:11am

Atlantis Q2/33

*subject to corrections*
A. Industrial Allocation

13/31 factories (non fixed) to naval materials: 13,000 tons created for Q2/1933 plus 91 tons stockpiled from Q1/33, plus 2000tons transferred from Nordmark, plus 500 tons transfered from Mexico plus 1,000 tons transfered from Argentina plus 4,000 tons transfered from Canada

Total warship materials: 20,791 (7,500 tons from foreign sources)

20,261 tons used for ship building (18,586 for local builds, 2,906 for export builds, 330 tons stockpiled for next quarter.

10/31 factory's (fixed) to infrastructure development: 1.0 points for Q2/1933
8/31 factory's (non-fixed) to infrastructure development: 0.8 IP's for Q2/33


Total: 1.8 infrastructure points created for Q2/33

B. Infrastructure Development

0.4 points transfered to Turkey
0.3 points transfered to Byzantium
1.1 points put into new naval infrastructure at Palinerus


C. Naval Construction

At Cleito

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Battleship Philomedes building, 39,089 tons needed, 18,900 tons used, 2,000 tons added
Class 4 Drydock #1 - DD's Able and Archer converting to Frigates (50%), 1,083 tons needed, 541 tons used, 542 tons added
Class 4 Drydock #2 - DD's Arab and Arrow converting to Frigates (50%), 1,083 tons needed, 541 tons used, 542 tons added
Class 1 Slip #1 - DD Joust laid down, 1,583 tons needed, 400 tons added
Class 1 Slip #2 - DD Jubilant laid down, 1,583 tons needed, 400 tons added
Class 1 Slip #3 - DD Judge laid down, 1,583 tons needed, 400 tons added
Class 1 Slip #4 - DD Juggernaut laid down, 1,583 tons needed, 400 tons added
Class 0 Slip #1 - MGB-2 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - MGB-3 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - MGB-4 laid down, 177 tons needed, 177 tons added
Class 0 Slip #4 - MGB-5 laid down, 177 tons needed, 177 tons added

Battleship Memnon freefloating, 38,537 tons needed, 38,400 tons used, 137 tons added
DD's Jacinth, Jackel, Jackdaw and Jaguar completed, begin trials
2 MTB's building (MTB-82 type)
MGB-1 begins trials

At Eridanus

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Battleship Eumelos building, 39,089 tons needed, 18,900 tons used, 2,000 tons added
Class 4 Drydock #1 - DD's Agile and Adler converting to Frigates (50%), 1,083 tons needed, 541 tons used, 542 tons added
Class 4 Drydock #2 - DD's Avenger and Attack converting to Frigates (50%), 1,083 tons needed, 541 tons used, 542 tons added
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - CL Forward under partial reconstruction, 1,197 tons needed, 599 tons used, 598 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle

Battleship Emathion freefloating, 38,537 tons needed, 38,400 tons used, 137 tons added
2 MTB's building (MTB-82 type)

At Duecalion

Class 3 Slip #1 - CA Dardanus launched, 10,907 tons needed, 9,200 tons used, 1,200 tons added
Class 3 Slip #2 - Idle
Class 3 Drydock #1-
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - CL Fort under partial reconstruction, 1,197 tons needed, 599 tons used, 598 tons added
Class 0 slip #1 - Idle
Class 0 slip #2 - Idle
Class 0 slip #3 - Idle
Class 0 slip #4 - Idle

CL Aurora completes refit, begins trials
2 Type 4C subchasers completed, begin trials

At Illissus

Class 3 Slip #1 - Training carrier Nautica building, 12,452 tons needed, 8,152 tons used, 1,200 tons added
Class 3 Slip #2 - CA Menemosyne launched, 10,907 tons needed, 9,200 tons used, 1,200 tons added
Class 3 Drydock #1 - BBT Aggamemnon scrapping
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Argentinian CL Nueve De Julio completed, begins trials
4 Type 4C subchasers completed, begin trials

At Palinerus

Type 2 Drydock #1 begins construction, 3.0 IP's needed, 1.0 IP's used, 0.5 IP's added
Type 0 Drydock #1 begins construction, 1.0 IP's needed, 0.8 IP's used, 0.2 IP's added
Type 0 Drydock #2 begins construction, 1.0 IP's needed, 0.8 IP's used, 0.2 IP's added
Type 0 drydock #3 begins construction, 1.0 IP's needed, 0.2 IP's added


The 3 drydocks of this facility are to be enclosed in concrete structures so as to facilitate the construction, repair and maintinence of submarines


At Phelleus

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - DD's Basilone and Furse reconstructing (50%) 1,214 tons needed, 614 tons used, 600 tons added
Class 3 Drydock #2 - DD's Borum and Avarice reconstructing (50%) 1,214 tons needed, 614 tons used, 600 tons added
Class 5 Drydock #1 - DD's Urainia and Uphold converting to tenders (25% each) 1,028 tons needed, 514 tons used, 514 tons added
Class 1 Slip #1 - DD Jaunty launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #2 - DD Javelin launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #3 - DD Jester launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 1 Slip #4 - DD Jinx launched, 1,583 tons needed, 1,200 tons used, 383 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Achilles and Argyll complete refit, begin trials

At Lycabettus type 4 port (8/9)

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - CL Eclipse under partial reconstruction, 1,197 tons needed, 599 tons used, 598 tons added
Class 2 Drydock #2 - CL Juno under partial reconstruction, 1,197 tons needed, 599 tons used, 598 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - Idle

At Maracaibo type 3 port (5/7)

Class 3 Drydock #1 - CL Champion under reconstruction (50%) 2,388 tons needed, 1,200 tons used, 1,188 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - 2 type 2 motor launches building
Class 0 Slip #2 - 2 type 2 motor launches building
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

CL Adventure completes refit, begins trials
2 Type 4C subchasers completed, begin trials
3 MTB's building (MTB-82 type)

At Safi type 2 port (4/5)

Class 2 Drydock #1 - 3 MTB's building (MTB-82 type)
Class 1 Slip #1 - 3 type 2 motor launches building
Class 1 Slip #2 - 3 type 2 motor launches building
Class 1 Drydock #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

4 Type 4C subchasers completed, begin trials


Launched ships/freefloating ships being completed:

BB's Memnon and Emathion building
CA's Dardanus and Menemosyne building

Ships completed and on trials:

2xPioneer class complete trials
16xE-1 class Escorts on trials
4xE-1 class Escorts on trials
XSS-3 on trials

Summary of ship building/repairs/rebuilds and convertions.

2 Memnon class battleships building (274 tons)
2 Eumelos class battleships building (4,000 tons)
Training Carrier Nautica building (1,200 tons)
2xDardanus class CA's building (2,400 tons)
8xJ class DD's building (3,132 tons)
4x Basilone rebuilding (1,200 tons)
8x A class DD's converting to Frigates (2,168 tons)
4xCLS converting for Argentina (2,392 tons)
CL Champion rebuilding (1,188 tons)
2 Admiralty type DD converting to tenders (514 tons)
10 motor launchs built (600 tons)
10 MTB-82 class Motor torpedo boats built (485 tons)
4 MGB-1 class Motor gunboats built (708 tons)

D. Transactions

0.4 IP's transfered to Turkey from Atlantis, total to be transfered 6.8 IP's, 5.5 IP's have already been transfered
0.3 IP's transfered to Byzantium

4,000 tons transfered from canada for 4 CL
3,357 tons transfered from Argentina for CL Nueve De Julio (857 tons) and 4 CLS convertions (2,500 tons)
2,260 tons transfered from Mexico for 2 CL
2,000 tons transferred from Nordmark for liscence to Build MTB-81 type MTB's
1,526 tons transfered from Chile for 2 admiralty type DD's converting to subchaser tenders
890 tons transfered from Colombia for 2 DD and 10 MTB

E. Other Notes

BBT Aggamemnon scrapping

F. Miscellaneous Works

Developement: Port of Palinerus begins construction of a new Submarine building and repair base
1.7 points used. One Type 2 Drydock and two type 0 drydocks under construction. Drydocks are part of hardened concrete structure used to repair, replenish and maintain submarines of various types.

G. Updated Order of Battle, 4/1/33

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships:.................................9(0)4
Battlecruisers:.............................2(0)0
CV:............................................3(0)0
Training battleship:......................0(0)0
Training CV's:..............................1(0)1
Training cruisers:.........................2(0)0
CA:............................................6(0)2
Escort Cruisers:..........................2(0)0
CL:.............................................37(1)0
DD: type A................................16(0)0
DD: type B................................120(4)8
Torpedo boats:...........................N/A
Moniters:...................................2(0)0
Fleet Submarine:.......................52(0)0
Coastal Submarine:...................72(0)0

Non-Treaty Limited Ships
DDE: (type C/ escorts).................70(0)0
Sloops:.......................................N/A
Frigates:.....................................0(8 )0
Corvettes:...................................N/A
Torpedo gunboats:......................32(0)0
Gunboats:.................................12(0)0
Patrol vessels:...........................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0
Sub chasers:.............................312(0)0
Coastal Motor Torpedo Boats:....120(0)0
Motor Gunboats:..........................1(0)4
Motor Torpedo Boats:................170(0)10
Motor Launchs:.........................130(0)10
Motor Launchs/minlayers:..........40(0)0
Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)0
Small craft depot ships:..............4(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0
Landing Craft Infantry:................80(0)0
Landing Craft Mechanized..........20(0)0
landing Craft Tank.....................10(0)0
Infantry launches:......................38(0)0 *18 transfered to Byzantean fleet

2

Saturday, January 27th 2007, 6:15am

Byzantium Q2/33

A. Industrial Allocation

0.3 points transfered from Atlantis

B. Infrastructure Development

Factory #1 building, 10 points needed, 4.2 points used, 0.3 points added

C. Naval Construction

Istambul/Constantinople

type 3 drydock #1 - Idle
type 1 drydock #1 - Idle
type 0 slip #1 - Idle
type 0 slip #2 - Idle

Launched ships being completed:

none

Ships completed and on trials

none

Summary of ship building/repairs/rebuilds and convertions.

None

D. Transactions

None

E. Other Notes

None

F. Updated Order of Battle, 1/1/33

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Capital ships: 0(0)0
Cruisers: 0(0)0
Destroyers: 0(0)0
Torpedo boats: 0(0)0
escorts: 0(0)0
Gunboats 0(0)0
Submarines: 0(0)0
Patrol vessels 0(0)0
Mine warfare ships 0(0)0
Sub chasers 12(0)0 (transfered from Atlantis)
Motor Launches 0(0)0
Infantry launches:....................18(0)0 (transfered from Atlantis)
Depot ships: 0(0)0
Auxillary's: 0(0)0