You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, September 30th 2013, 2:38pm

Brazil, Q2/1943

[SIZE=3]Brazil, Q2/1943[/SIZE]
- 7000 tons from 7/7 factories producing naval materials
- 3589 tons from stockpile
- 0 tons from scrapping
- 0 tons from transactions
- 10589 tons total for Q2/1943
- 5148 tons used in Q2/1943.
- 5441 tons left for Q3/43.

0/7 factories committed for Quarter to infrastructure development
0/7 factories committed for Year to infrastructure development

Infrastructure Development
N / A

[SIZE=3]Naval Construction[/SIZE]

Arsenal de Marinha do Rio de Janeiro
- Class 3 Slipway: Idle
- Class 1 Slipway: Destroyer Niterói laid down January 1st, 1943. 2,200 tons required. 650 tons added Q2/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Class 1 Slipway: Destroyer Uberlândia laid down January 1st, 1943. 2,200 tons required. 650 tons added Q2/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Class 1 Slipway: Destroyer Teresina laid down January 1st, 1943. 2,200 tons required. 650 tons added Q2/1943 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1943. Completed December 7th, 1943.
- Class 1 Slipway: Destroyer Fortaleza laid down April 1st, 1943. 2,200 tons required. 650 tons added Q2/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 3.5 Drydock: Cruiser Bahia scrapping. 507 tons to be recovered. Ship requires 4 months to scrap. 127 tons recovered in Q2/1943. Scrapping completed.
- Class 3 Drydock: Cruiser Barroso (Note 1) scrapping. 507 tons to be recovered. Ship requires 4 months to scrap. 127 tons recovered in Q2/1943. Scrapping completed.

Dockside:
- CL Piquero begins Level 1 refit (to install dradis) on April 1st, 1943. 496 tons required. 496 tons added Q2/1943 for a total of 496/496 tons. 0 tons remaining until completion. Refit requires 0.95 months to complete. Refit completes April 30, 1943.

Arsenal de Marinha do Macapa
- Class 1 Slipway: Patrol Craft Guaiba laid down April 1st, 1943. 108 tons needed to complete. 108 tons added Q2/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on April 30th, 1943.
- Class 1 Slipway: Patrol Craft Bertioga laid down April 1st, 1943. 108 tons needed to complete. 108 tons added Q2/1943 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on April 30th, 1943.
- Class 1 Slipway: Destroyer Campinas laid down April 1st, 1943. 2,200 tons required. 650 tons added Q2/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 1 Slipway: Destroyer Recife laid down April 1st, 1943. 2,200 tons required. 650 tons added Q2/1943 for a total of 650/2200 tons. 1550 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1943. Completed March 7th, 1943.
- Class 1 Slipway: Idle
- Class 1 Slipway: Idle
- Class 0 Drydock: Idle

Dockside:
- Tender Caboclo laid down January 1st, 1943. 400 tons required. 0 tons added Q2/1943 for a total of 400/400 tons. 0 tons remaining until completion. Ship requires 4.4 months to construct. Launched February 21st, 1943. Completed May 12th, 1943.
- Tanker Almirante Guilhem converting from civilian into auxiliary oiler. 306 tons required. 306 tons added Q2/1943 for a total of 306/306. 0 tons remaining until completion.

Arsenal de Marinha do Manaus
- Class 0 Slipway: Idle
- Class 0 Slipway: Idle
- Class 0 Drydock: 70 ton river patrol craft BPR-03 laid down April 1st, 1943. 70 tons added. Launched complete on April 30th, 1943.
- Class 0 Drydock: 70 ton river patrol craft BPR-04 laid down April 1st, 1943. 70 tons added. Launched complete on April 30th, 1943.

Dockside:
- River tanker Potengi laid down January 1st, 1943. 309 tons required. 0 tons added Q2/1943 for a total of 309/309 tons. 0 tons remaining until completion. Ship requires 4.3 months to construct. Launched February 20th, 1943. Completed May 10th, 1943.
- River hospital ship Compaixão (NAH-1) laid down January 1st, 1943. 250 tons required. 0 tons added Q2/1943 for a total of 250/250 tons. 0 tons remaining until completion. Ship requires 4.25 months to construct. Launched February 20th, 1943. Completed May 10th, 1943.
- River barracks ship Paraguassú converted from civilian vessel starting April 1st, 1943. 90 tons required. 90 tons added Q3/1943 for a total of 90/90. 0 tons remaining until completion. Ship requires 0.7 months to refit. Completed April 21st, 1943.

On Trials:
Submarines B-6, B-7, and B-8 continue trials.
Destroyers Santos de Espar, Goiás, Onça, Leão and Rio Grande do Sul complete trials.
Auxiliary ship Caridade completes trials.
Hospital ship Compaixao begins trials.
River tanker Potengi begins trials.
River construction ship Caboclo begins trials.

Transactions
- None

Scrapping
- 2x Bahia-class cruisers scrapping. 127 tons each recovered in Q2/1943. In recycling until Q4/1943. (2x127=254t)

760 tons in recycling until Q4/1943.
254 tons in recycling until Q1/1944.

Notes
Note [1]: There are two cruisers named Barroso in the Brazilian encyclopedia. This is the older ex-British cruiser. Apparently there was a naming accident.

[SIZE=3]Order of Battle[/SIZE]
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

The Fleet
Battleships: 1(0)+0
Aircraft Carriers: 4(0)+0
Battlecruisers: 2(0)+0
Light Cruisers: 11(0)+0
Destroyers: 23(0)+6
Submarines: 36(0)+0
Patrol Craft: 4(0)+0
Gunboats: 0(0)+0
Minelayers: 0(0)+0
Minesweepers: 20(0)+0

Fleet Train
Oilers: 3(0)+0
Tenders: 1(0)+0
Training Ships: 1(0)+0

Riverine Forces
River Gunboats: 4(0)+0
Barracks Ship: 1(0)+0
River Construction Tender: 1(0)+0
River Hospital Ship: 1(0)+0