You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, February 4th 2005, 12:17am

Philippines Q2/26


Marina de Filipinas
1926 Second Quarter Report
1 April-30 June


A. Factories

7/11 factories = 7,000t of material + 0t stockpiled + 881 from scrapping = 7,881t available
7302t are used, and 500t transferred, leaving a stockpile of 79t.
(1651t transferred in placed directly to contracted rebuild)

3/11 factories (committed) = 0.3 infrastructure pts +
1/11 factories (flexible) = 0.1 pts = 0.4 pts available

B. Infrastructure Development

Began upgrade of Type 0 slip at Puerto Princesa to Type 1
0.3 points alotted = 0.3 total/0.5 needed = 0.2 needed to complete

Construction of Factory No. 12 is terminated.
0.6 IP invested = converting to Type 1 port at Itu Aba

C. Naval Development and Construction

at Manila:
S4: BC Samal receives 2329t, balance 13826t, completes 6 Mar 28
S3: idle
S1: idle
D2: PD Fernando refitting; receives 1848t, completed 1 Jun
D1: Chinese BB Lee Siu-Lung rebuilding; receives 1651t, balance 2095t, completes 28 Oct

at Butuan:
S2: CDS Tacloban receives 1371t, balance 4830t, completes 19 May 27
S1: idle
S0: idle
S0: GB Batanes laid down 1 Apr; receives 320t, balance 156t, completes 16 Aug
S0: SC Vista laid down 1 Apr; receives 199t, balance 85t, completes 10 Aug
S0: SC Vallejo laid down 1 Apr; receives 199t, balance 85t, completes 10 Aug
D3: idle
Dockside: SC Uncompahgre launched 1 Apr; receives 86t, commissioned 10 May
Dockside: DD Cerceta launched 5 May; receives 370t, balance 471t, completes 10 Nov

at San Fernando:
S2: idle
D1: idle
D0: idle
Dockside: CDS Dagupan receives 233t, commissioned 19 May

at Puerto Princesa:
S0: *upgrading to Type 1*
Dockside: GB Capital launched 1 Apr; receives 156t, commissioned 16 May

Commericial shipyards:
Coastal minesweeper Niebla = 191t

D. Transactions

500 tons of material transferred to Italy to build 10 MAS da 38m torpedo boats

CE Nisshin purchased from Chosen. Renamed PRS Bugsuk; delivered 1 June
0.1 pts to Chosen for 1 CE (part - 0.1 remaining)

1651 tons of material received from China to rebuild BB Lee Siu-Lung

E. Other Notes

Ships laid down this quarter: one gunboat, two subchasers and one coastal minesweeper.

DD Martinete, SC Alta, Baja, MS Nube complete shakedown cruises

GB Kudarat continues shakedown cruise

CDS Dagupan, GB Capital, SC Uncompahgre, MS Niebla begin shakedown
cruises

TB T-M31 to T-M40 on shakedown in the Mediterranian, begin transport home April

PD Fernando begins post-refit shakedown

Chinese PC Ying Jui continues post-rebuild/pre-delivery trials

F. Scrappage Report

Stockpiled Guns
in turrets: 1 2x6" Mk 12
singles: 8 x 6" Mk VI, 16 x 3" Mk VI

G. Updated Order of Battle, 30 June 1926

Note: X(Y)+Z = completed (under repair/refit) + under construction

-Combat Force-
Second class battleships 2(0)+0
Coast defense battleships 1(0)+1
Battlecruisers 1(0)+1
First class cruisers 1(0)+0
Second class cruisers 1(0)+0
Escort cruisers 4(0)+0
Destroyers 8(0)+1
Destroyer escorts 9(0)+0
Subchasers 5(0)+2
Submarines 1(0)+0
Torpedo boats 3(0)+0
Fast torpedo craft 40(0)+0
Gunboats 5(0)+1
Patrol boats 2(0)+0
Assault transports 0(0)+1 building in Japan
Minelayers 3(0)+0
Minesweepers (coastal) 12(0)+0

-Support Force-
Oilers 1(0)+0

------------