You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, August 29th 2012, 4:27am

Chile, Q4/1942



[SIZE=3]Industrial Allocation[/SIZE]
- 9/9 factories producing 9,000t materials.
- 3,408 tons from stockpile.
- 2000 tons from transactions
- 822 tons from scrapping
- 15,230 tons materials total.
- 9,199 tons used.
- tons stored for Q1/43.
- 0/9 factories dedicated to infrastructure.

[SIZE=3]Infrastructure Development[/SIZE]
None at present

[SIZE=3]Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Battleship Almirante Cochrane scrapping. 2028 / 4055 tons recovered Q4/1942.
S3.5: BC-11 Almirante Cochrane laid down August 1st, 1941. 2,300 tons added Q4/42 for a total of 13,100 / 28,385 tons. 15,285 / 28,385 tons remaining until completion on April 3rd, 1944. Ship originally named O'Higgins. Ship launched December 30th, 1942.
D2.5: CLD-23 Abtao (Battle-class destroyer leader) laid down October 1st, 1942. 900 tons added Q4/42 for a total of 900 / 3,575 tons. 2,675 / 3,575 tons remaining. Ship will launch on March 1st 1943. Ship will complete on October 18th, 1943.
D2: DD-60 Feroz undergoing partial reconstruction. 350 tons added Q4/1942 for a total of 350/350 tons. 0/350 tons remaining until completion. Reconstruction completed.
S2: CLD-22 Talcahuano (Battle-class destroyer leader) laid down July 1st, 1942. 900 tons added Q4/42 for a total of 1,800 / 3,575 tons. 1,775 / 3,575 tons remaining. Ship will launch on December 1st 1942. Ship will complete on July18th, 1943.
S1: Idle
D0: Idle

Dockside:
- BC-09 Almirante Blanco Encalada laid down January 1st, 1940. 1,750 tons added Q4/42 for a total of 26,750 / 28,385 tons. 1,635 / 28,385 tons remaining until completion on February 3rd*, 1943. Launched June 19th, 1941. [SIZE=1](*Previously erroneously calculated as April 4th.)[/SIZE]
- CLD-19 Casma (Battle-class destroyer leader) laid down October 1st, 1941. 0 tons added Q4/42 for a total of 3,575 / 3,575 tons. 0 / 3,575 tons remaining. Ship launched on March 1st 1942. Ship completed on October 18th, 1942.
- CLD-20 Papudo (Battle-class destroyer leader) laid down January 1st, 1942. 900 tons added Q4/42 for a total of 3,575 / 3,575 tons. 0 / 3,575 tons remaining. Ship launched on June 1st 1942. Ship will complete on January 18th, 1943.
- CLD-21 Chipana (Battle-class destroyer leader) laid down April 1st, 1942. 900 tons added Q4/42 for a total of 2700 / 3,575 tons. 875 / 3,575 tons remaining. Ship launched on September 1st 1942. Ship will complete on April 18th, 1943.
- Antarctic Expeditionary Ship Ignacy Domeyko undergoing Level 2 refit. 1,235 tons added Q4/42 for a total of 1,235 / 1,235 tons. 0 / 1,235 tons remaining. Refit completes.

ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Sea Gunboat Shaula laid down October 1st, 1942. 180 tons added Q4/42 for a total of 180 / 180. Completed and launched on October 31st, 1942.
S1: Sea Gunboat Sadalmelik laid down October 1st, 1942. 180 tons added Q4/42 for a total of 180 / 180. Completed and launched on October 31st, 1942.
D1: DD-51 Concordante undergoing partial reconstruction. 344 tons added Q4/1942 for a total of 344/344 tons. 0/344 tons remaining until completion. Reconstruction completed.

Dockside:
None

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper YDM-4 laid down November 1st, 1942. 190 tons added Q4/42 for total of 190 / 190. Completed and launched on November 31st, 1942.
S0: Sea Gunboat Altarf laid down October 1st, 1942. 180 tons added Q4/42 for a total of 180 / 180. Completed and launched on October 31st, 1942.

Dockside:
- Landing ship Elicura laid down January 1st, 1942. 37 tons added Q4/42 for total of 487 / 487; 0 / 487 tons remaining until completion on September 15th, 1942. Ship launched on April 24th, 1942.

ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle

Dockside:
None

from factories:
- N/A

On Trials
- LSI(M)-02 Presidente Errazuriz finishes six months of builders trials.
- CLD-18 Punta Gruesa continues six months of builders trials.
- CLD-19 Casma begins six months of builders trials.
- LSM-01 Elicura begins six months of builders trials.

Scrapping
- Total tonnage in recycling until Q4/1942: (2x411) = 822 tons
- Total tonnage in recycling until Q1/1943: (2x192) = 384 tons
- Total tonnage in recycling until Q2/1943: (1x1014) = 1014 tons
- Total tonnage in recycling until Q3/1943: (1x1014) = 1014 tons

[SIZE=3]Transactions[/SIZE]
- 2,000 tons loan repayment from Brazil.

[SIZE=3]Other Notes[/SIZE]
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
- "Coati": Target date of mid-1944 set. Project is in initial study stages at Sisdef.
- "Pudu": Project is in production at Sisdef and FAMAE.
- Design N1.

[SIZE=3]Order of Battle (Armada de Chile) December 31st, 1942[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Primary Combatants:
Dreadnought Battleships: 1(0)+0-1
Dreadnought Battlecruisers: 1(0)+2
Coast Defense Ships: 0(0)+0
Aircraft Carriers: 3(0)+0
Armoured Cruisers: 1(0)+0
Heavy Cruiser: 1(0)+0
Light Cruisers: 8(0)+0
Floatplane Cruisers: 1(0)+0
Destroyer Leaders: 4(0)+4 {3,000 tons std and up}
Destroyers: 34(0)+0 {1,200-3,000 tons std}
Destroyer Escorts: 16(0)+0
Light Destroyers: 8(0)+0 {under 1,200 tons std}
Minelayer: 1(0)+0
Torpedo Boats: 13(0)+0
Submarines: 10(0)+0
Floatplane Carriers: 0(0)+0
Subchasers: 24(0)+0
Minesweepers: 20(0)+0
Arctic Patrol Vessel: 3(0)+0

Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0

Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0

Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 1(0)+0
Landing Craft Tank: 0(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0

Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 2(0)+0
Museum Ships: 1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)