German Naval Developments - Q4/26
A. Industrial Allocation
Factory Allocation:
Warship Material: 5
Infrastructure (Committed): 7 (Bonus production this quarter = 0.7 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 5,000 t
Stockpile: 1,020 t
Recycled Scrap: 98 t
Material Used on Construction: 4,708 t
New Stockpile: 1,410 t
B. Infrastructure Development
The Type 3 drydock at Kiel receives 1.4 pts, for 2.1 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-213 receives 426 t, launched 15/11/26
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-211 receives 214 t, completed 15/11/26
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Scrapping S-140
1 Type 0 slip: Idle
Free-floating: DD Z-212 receives 426 t
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Breslau (ex-Ersatz Niobe) receives 842 t, completed 20/11/26
Free-floating: CL Ersatz Nymphe receives 1400 t
At Kiel
1 Type 3 slipway: CL Ersatz Thetis receives 1400 t
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
D. Transactions
DD S-141 scrapped at Bremerhaven, 120 t to be available for Q2/27
E. Other Notes
CL Koln, DD Z-209 complete shake-down cruise
DD Z-210 continues shake-down cruise
CL Breslau, DD Z-211 commence shake-down cruise
New Orders: None
F. Updated Order of Battle, 31/12/26
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+2, with Niobe deleted, to be scrapped Q1/27.
DD: 24(0)+3, with S-141 sent to the breakers.
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought