Iberian Naval Developments Q2 1934
a/ Industrial Allocation
14/24 factories producing materiel for shipbuilding =14000 tons
10/24 factories (fixed) producing infrastructure materiel =1.0 pts + 1.0 bonus pts
00/24 factories producing infrastructure materiel = 0.0 points
Tonnage Carried Over From last Quarter = 953 tons
tonnage available for Shipbuilding this quarter: 14953 tons
Tonnage Used for Shipbuilding this quarter: 12040 tons.
Tonnage Carried Over From this Quarter = 2913 tons
b/ Infrastructure Development
I.C.E. "bank": 2.6 points still to be spent.
Infrastructure points produced by industry for this quarter: 2.0
Transfer of 0.3 pts to Peru for development of naval infrastructure
1.7 infrastructure for development of infrastructures as follows:
-Barreiro: type 3 to type 4 drydock: 0.20 points invested, balance 0,55
-Panama: type 3 drydock to type 4 drydock: 0.20 points invested, balance 0,55
-San Hainando: type 3 drydock to type 4 drydock: 0.20 points invested, balance 0,55
-San Lorenzo: type 3 drydock to type 4 drydock: 0.20 points invested, balance 0,55
-Luanda: type 3 drydock to type 4 drydock: 0.20 points invested, balance 0,55
-Santiago de Cuba: Type 2 slip to type3: 0.20 points invested, balance 0.35
-Porto: Typle 3 slip to type 4 slip: 0.4 points invested, balance 0,6
-Santander: Type 3 slip to type 4 slip:0.4 points invested, balance 0,6
c/ Naval Construction
Cadiz-
No.1 type 5 slip - Idle
No.2 type 4 slip - Idle
No.3 type 3 slip - Idle
No.4 type 2 slip - Idle
No.5 type 2 slip - Idle
No.6 type 2 slip - Idle
No.1 type 4 drydock - Idle
No.2 type 3 drydock - Idle
Dock side - Las Estrellas, BB, laid down 02/01/33, estimated completion date November 1935 receives 2220 tons, balance 12264 tons
Dock side - Santa Helena, HS, laid down 01/07/33, estimated completion date Jan 1935, receives 1272 tons, balance 2775 tons
Barreiro-
No.1 type 4 slip - Idle
No.2 type 3 slip - El Sol, BB, laid down 02/07/33, estimated completion date May 1936. receives 2220 tons, balance 16704 tons
No.3 type 3 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip - Idle
No.6 type 1 slip - Idle
No.1 type 5 drydock - Idle
No.2 type 3 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Santa Brigida, HS, laid down 01/10/33, estimated completion date April 1935 receives 1272 tons, balance 4047 tons
Porto-
No.1 type 4 slip - Idle
No.2 type 3 slip - Idle
No.3 type 3 slip - Idle
Dock side - La Luna, BB, laid down 01/10/32, estimated completion September 1935. receives 2220 tons, balance 10044 tons
Dock side - D142,DD, laid down 02/07/33,estimated completion May 1934. receives 150 tons balance 0 tons. Completed
Dock side - D143,DD, laid down 02/07/33,estimated completion May 1934. receives 150 tons balance 0 tons. Completed
La Coruna-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Santander-
No.1 type 3 slip - Idle
No.2 type 2 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip - Idle
No.6 type 1 slip - Idle
No.1 type 2 drydock - Idle
Dock side - Goliath, SLV, laid down 02/07/33,Estimated completion date September 1934, receives 668 tons, balance 608 tons
Dock side - Atlas, SLV, laid down 02/07/33, Estimated completion date September 1934, receives 668 tons, balance 608 tons
Santiago De Cuba-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
Dock side - D144, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
Dock side - D145, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
San Lorenzo-
No.1 type 3 drydock - Idle
No.2 type 1 drydock - Idle
Dock side - Idle
Panama-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - D146, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
Dock side - D147, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
Dock side - D148, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
Dock side - D149, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
Luanda-
No.1 type 1 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - D150, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
Dock side - D151, DD, laid down 02/07/33,estimated completion May 1934, receives 150 tons, balance 0tons. Completed.
San Hainando-
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
d/ Transactions
None
e/ Other Notes
Breaking of the following ships:-
None
Re-Fitting (25%) of the following ships:-
None
Re-Building (50%) of the following ships:-
None
Sea trials of the following vessels:-
D142
D143
D144
D145
D146
D147
D148
D149
D150
D151
Commissioning of the following vessels:-
D142
D143
D144
D145
D146
D147
D148
D149
D150
D151
Tonnage from scrapping = 0
f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)
BB = 08 (0) + 3/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 44 (0) + 0/0 (0)
CV = 04 (0) + 0/0 (0)
DD = 109 (0) + 0/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 92 (0) + 0/0 (0)
SL = 10 (0) + 10/0 (0)
SUB = 54 (0) + 0/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 300 (0) + 0/0 (0)
BDC = 18 (0) + 0/0 (0)
TS = 06 (0) + 0/0 (0)
HS = 00 (0) + 2/0 (0)
TK = 07 (0) + 0/0 (0)
SLV = 00 (0) + 2/2 (0)
BDA = 72 (0) + 0/0 (0)
EDA = 48 (0) + 0/0 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo (MTB)
BDC = Barco De Canon
BDA = Barco Del Aterrizaje (Landing Craft)
EDA = Embarcacion De Ataque (Assault Boat)
TS = Troop Ship
HS = Hospital Ship
TK = Tanker
SL = Sloop
SLV = Sea-Lift Vessel