You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, July 8th 2012, 12:57am

Empire of Brazil Q3 1942

Q3 1942 Activity

Brazil
7/7 factories producing naval materials: 7000 tons created for Q2/42. 7000 total tons + 1458 stockpiled from previous quarter + 0 tons from scrapping+ 0 tons from transactions = 8458 tons

8226 tons used. 232 tons left for Q2/42

0/7 factories committed for Quarter to infrastructure development = 0.0i.p.
0/7 factories committed for Year to infrastructure development

B. Infrastructure Development
0.1 ip to factory + 0.0

C1. Naval Construction

Rio de Janeiro:
Class 3 Slipway: SS B-6 laid down Q2/42, 1103/1470 tons required. 368t added Q3/42. 735t needed.
Class 1 Slipway: DD-37 Santos de Espar laid down Q1/42, 825/1650 tons required. 412t added Q3/42. 413t needed.
Class 1 Slipway: SS B-4 laid down Q1/42, 1103/1470 tons required. 368t added Q2/42. 735t needed.
Class 1 Slipway: SS B-5 laid down Q1/42, 1103/1470 tons required. 368t added Q2/42. 735t needed.
Class 1 Slipway: SS B-7 laid down Q2/42, 1103/1470 tons required. 368t added Q3/42. 735t needed.
Class 3.5 Drydock: Scraping Coiler Belmonte
Class 3 Drydock: Idle

Dockside: Idle

Macapa:
Class 1 Slipway: DD-38 Goiás II laid down Q1/42, 825/1650 tons required. 412t added Q3/42. 413t needed.
Class 1 Slipway: DD-39 Onça II laid down Q1/42, 825/1650 tons required. 412t added Q3/42. 413t needed.
Class 1 Slipway: DD-40 Leão II laid down Q1/42, 825/1650 tons required. 412t added Q3/42. 413t needed.
Class 1 Slipway: DD-41 Rio Grande do Sul II laid down Q1/42, 825/1650 tons required. 412t added Q3/42. 413t needed.
Class 1 Slipway: APA-1 Caridade laid down Q1/42, 1099/2195 tons required. 548t added Q3/42. 551t needed.
Class 1 Slipway: SS B-8 laid down Q2/42, 1103/1470 tons required. 368t added Q3/42. 735t needed.
Class 0 Drydock: Idle
Dockside: Idle

Manaus:
Class 0 Slipway: Idle
Class 0 Slipway: Idle
Class 0 Drydock: Idle
Class 0 Drydock: Idle

C2. Ships on shakedown cruises:

1st Three Months

2nd Three Months

BC Rio de Janeiro
DD-36 Gramamae

D. Transactions

3780t to Greece for CV and SS

E. Other Notes

894t recycling from scrapping Salvador Class destroyers and Sub Tender Ceará. Tonnage available Q1/43
Report may be updated for errors.

F. Updated Order of Battle-
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships 1(0)+0
Aircraft Carriers 4(0)+0
Battlecruisers 2(0)+0
Light Cruisers 12(0)+0
Destroyers 18(0)+5
Submarines 32(0)+4
Gunboats 0(0)+0
Minelayers 0(0)+0
Minesweepers 20(0)+0
Submarine Tender 0(0)+0
Collier 0(0)+0
Training Ship 1(0)+0
You smug-faced crowds with kindling eye
Who cheer when soldier lads march by,
Sneak home and pray you'll never know
The hell where youth and laughter go.
-Siegfried Sassoon