You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, June 4th 2003, 6:29pm

Report of Russian Federation, 1/1/21

Below is status of warships ships being constructed in Russian Federation, as of 1/1/21:

Four Petr Veliki class battleships, laid down 2/1/18, and launched 4/15/19. 34,000 metric tons each completed by 1/1/21.
The Petr Veliki require 1,444 metric tons each to complete. Will be completed in 1921.

Four Sviatoslav class heavy cruisers laid down 4/1/19, and launched 9/12/19. 10,000 metric tons each completed by 1/1/21.
The Sviatoslav class require 2,398 metric tons each to complete. 938 metric tons each will be added in 1921. Design of quadruple turrets has been completed, and new 210mm guns have been successfully proved.

Aircraft carrier Canopus entered Drydock #1 at Sevastopol on 11/22/20. 1,250 metric tons completed by 1/1/21.
Canopus requires 5,630 metric tons to complete. Canopus will be completed in 1921.

Russian Federation further announce the laying down of twelve Tashkent class destroyers, Four at the Class 4 slips at Petrograd, four at the Class 3 slips at Petrograd, and four at the Class 1 slips at Petrograd. These twelve ships require 17,352 metric tons to complete, and they will be completed in 1921.

This programme will consume 32,510 metric tons (31,998 tons) of the 32,512 metric tons (32,000 tons) of warship materials Russian Federation will produce in 1921.

Russian Federation assigns 20 of 28 factories to production of infrastructure, beginning construction of two new factories, which will be 50% completed in 1921.

Visit my Russian/French fantasy fleet page:
http://admkuznetsov.tripod.com