Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, August 22nd 2003, 6:54pm

Germany, Q3/21

German Naval Developments - Q3/21

A. Industrial Allocation


7/11 factories to naval materials; 7,000 t created, plus a stockpile of 157 for 7157 tons. 6389 t of which is used, while 768 t is stockpiled.

2/11 factories (committed) to infrastructure development

2/11 factories (non-committed) to infrastructure development; total 0.4 infrastructure points produced

B. Infrastructure Development

0.4 pts are used to further a Type 1 DD at Cuxhaven; 1.2 pts installed to date.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: CL Niobe undergoes refit 1/7/21, completed 31/9/21; drydock ready for 1/11/21
1 Type 1 slip: idle
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle

At Bremerhaven


1 Type 2 slip: CL Emden receives 1,110 t, to complete 1/6/22
1 Type 1 slip: idle
1 Type 1 drydock: idle
1 Type 0 slip: idle

At Cuxhaven

1 Type 3 slip: idle
1 Type 3 drydock: BB Markgraf receives 1,320 t; repairs completed 27/8/21
1 Type 2 slip: CL Munchen laid down, receives 1,110 t, to complete 1/9/22
1 Type 1 slip: idle
1 Type 0 slip: idle

At Kiel

1 Type 2 drydock: PD Schliesen begins refit, receives 1,728 t, to complete 11/21
1 Type 1 slips: idle
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle

Commericial shipyards build three 150 t coastal minesweepers.

D. Transactions

As per the Kobe Protocol, 1,000 t of warship material are delivered to Japan as compensation for the loss of the Augsburg . This material will be available on 1/10/22. In total, Germany owes 4,000 t of material to Japan.

E. Other Notes

Markgraf’s shakedown cruise will last into early 1922.

F. Updated Order of Battle, 31/9/21

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(1)+0
CL: 8(1)+2
DD: 24

Note: PD = pre-dreadnought