German Naval Developments - Q3/21
A. Industrial Allocation
7/11 factories to naval materials; 7,000 t created, plus a stockpile of 157 for 7157 tons. 6389 t of which is used, while 768 t is stockpiled.
2/11 factories (committed) to infrastructure development
2/11 factories (non-committed) to infrastructure development; total 0.4 infrastructure points produced
B. Infrastructure Development
0.4 pts are used to further a Type 1 DD at Cuxhaven; 1.2 pts installed to date.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: CL
Niobe undergoes refit 1/7/21, completed 31/9/21; drydock ready for 1/11/21
1 Type 1 slip: idle
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle
At Bremerhaven
1 Type 2 slip: CL
Emden receives 1,110 t, to complete 1/6/22
1 Type 1 slip: idle
1 Type 1 drydock: idle
1 Type 0 slip: idle
At Cuxhaven
1 Type 3 slip: idle
1 Type 3 drydock: BB
Markgraf receives 1,320 t; repairs completed 27/8/21
1 Type 2 slip: CL
Munchen laid down, receives 1,110 t, to complete 1/9/22
1 Type 1 slip: idle
1 Type 0 slip: idle
At Kiel
1 Type 2 drydock: PD
Schliesen begins refit, receives 1,728 t, to complete 11/21
1 Type 1 slips: idle
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle
Commericial shipyards build three 150 t coastal minesweepers.
D. Transactions
As per the Kobe Protocol, 1,000 t of warship material are delivered to Japan as compensation for the loss of the
Augsburg . This material will be available on 1/10/22. In total, Germany owes 4,000 t of material to Japan.
E. Other Notes
Markgraf’s shakedown cruise will last into early 1922.
F. Updated Order of Battle, 31/9/21
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(1)+0
CL: 8(1)+2
DD: 24
Note: PD = pre-dreadnought