You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, November 21st 2003, 10:39pm

Germany Q4/21

German Naval Developments - Q4/21

A. Industrial Allocation

5/11 factories to naval materials; 5,000 t created, plus a stockpile of 768 t for 5768 tons. 5041 t of which is used, while 727 t is stockpiled.

2/11 factories (committed) to infrastructure development, produce their bonus pts this turn.

4/11 factories (non-committed) to infrastructure development; total 0.8 infrastructure points produced

B. Infrastructure Development

0.8 pts are used to further a Type 1 DD at Cuxhaven; 2.0 pts installed to date, completing the job.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock:
1 Type 1 slip: idle
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle

At Bremerhaven

1 Type 2 slip:
1 Type 1 slip: idle
1 Type 1 drydock: idle
1 Type 0 slip: idle
Free-floating: CL Emden receives 1,110 t, to complete 1/6/22

At Cuxhaven

1 Type 3 slip: idle
1 Type 3 drydock:
1 Type 2 slip: CL Munchen receives 1,110 t, to complete 1/9/22; ship launched 15/12/21
1 Type 1 slip: idle
1 Type 0 slip: idle

At Kiel

1 Type 2 drydock: PD Schliesen refitting, receives 1,371 t, completed 11/21
1 Type 1 slips: idle
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle

Commericial shipyards build three 150 t coastal minesweepers.

D. Transactions

As per the Kobe Protocol, 1,000 t of warship material are delivered to Japan as compensation for the loss of the Augsburg . This material will be available in Q1/22. In total, Germany owed 4,000 t of material to Japan; this obligation is now completed.

E. Other Notes

Markgraf ’s shakedown cruise will last into early 1922.

F. Updated Order of Battle, 31/12/21

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(1)+0
CL: 8(1)+2
DD: 24

Note: PD = pre-dreadnought