(Edit: how does it come that one only notice the errors in a report when he's creating the report for the next Quarter? Minor error with Zuiho and Shoho corrected)
(Edit 2: AAAAAAAAAAAAAAARRRRRRRRRGGGGGGHHHHHHHHH)
Fourth Quarter of Eighth year of the Emperor Taisho report of Japan.
Submitted by Nakamura Shoda to the Shogun. Taisho 8 Nen 12 Getsu 31 Nichi
Tokugawa-dono,
Attached is a list of the 4th quarter of the Eighth year of the Reign of Emperor Taisho.
The budget of the Imperial Navy for this year was 3.5 billion yen. A total of 3.491 billion yen was used of that total.
Your loyal servant and secretary,
Nakamura Shoda
PS: It has come to my attention that a special colour will be used for the Empress’ Island Hopper which could, in my opinion, be a very dubious one. Though I have not heard which exact colour, knowing my sister, it will be one that is not appropriate for a ship that will be built under the laws of the Cleito Treaty.
======================================
Factory assignment:
Of the 25 factories available to the empire, Factories I to XV are used for the infrastructure (fixed for the year) for 1.5 point plus the extra 1.5 for fixing the factories for the year for a total of 3 points in the final quarter of the year. Factories XVI to XXV are assigned to produce materials to be used in the warships for a total of 10000 tons in the quarter.
Transactions
As per the Kobe Protocol, 1,000 t of warship material have been delivered to Japan as compensation for the loss of the Augsburg. In total, Germany still owes 1,000 t of material to Japan.
Infrastructure construction:
The infrastructure points are used in the construction on Factory XXVI (7.5 points at end of 4th quarter).
Warships:
I) Ships already under construction.
Nineteen vessels were under construction on October 1, 1921. The carriers Zuiho (ex Kaga) and Shoho (ex Tosa), the Coast Defense Ships Atsusa, Zansho, and Asasamu, the Light Cruiser Kameko-chan and 3rd class Destroyers Queen, Parthenon, Majer, Candana, Nim, Eatta, Odetto, Aurora, Giselle, Bucstual, Dai-mon, Victor-Schasse, and Toki.
October 1, 1921 status
Zuiho: 19.5 months, 13170 tons. 2280 tons used this month.
Shoho: 14.5 months 9190 tons. 2340 tons used this month.
Atsusa: 9 months, 2850 tons. 780 tons used this month.
Zansho: 6 months, 1750 tons. 875 tons used this month.
Asasamu: 6 months, 1750 tons. 875 tons used this month.
Kameko-chan: 3 months, 1493 tons, 1414 tons used this month.
Kuun: 3 months, 174 tons, 174 tons used this month.
Paruteno: 3 months, 174 tons, 174 tons used this month.
Majeru: 3 months, 174 tons, 174 tons used this month.
Chandana: 3 months, 174 tons, 174 tons used this month.
Niimu: 3 months, 174 tons, 174 tons used this month.
Ietta: 3 months, 174 tons, 174 tons used this month.
Odetto: 3 months, 174 tons, 174 tons used this month.
Aarora: 3 months, 174 tons, 174 tons used this month.
Jiseru: 3 months, 174 tons, 174 tons used this month.
Bakusuchuaru: 3 months, 174 tons, 174 tons used this month.
Dai-mon: 3 months, 174 tons, 174 tons used this month.
Vitta-Shasse: 3 months, 174 tons, 174 tons used this month.
Toki: 3 months, 174 tons, 174 tons used this month.
II) Ships started in the fourth quarter.
The 3rd class destroyer Shizu (F-XV) of the FSS: F class was laid down on 10/2/1921. The ship requires 581 tons and 10 months construction time. It is expected that it will be launched Early February and will be ready Late July 1922.
III) Status of ships under construction at the end of the fourth quarter.
Of the 11000 tons, the Zuiho will receive 3x760 = 2280 tons, the Shoho will receive 3x780 = 2340 tons, Atsusa will receive 2x292 and 1x196 = 780 tons, Zansho will receive 2x292 and 1x291 = 875 tons, Asasamu will receive 2x292 and 1x291 = 875 tons, and Kameko-chan will receive 2x460 and 1x494 = 1414 tons. Kuun, Paruteno, Majeru, Chandana, Niimu, Ietta, Odetto, Aarora, Jiseru, Bakusuchuaru, Dai-mon, Vitta-Shasse, Toki and Shizu will each receive 3x58 = 174 tons, total 2436 tons.
Zuiho at 54%. Still requires 14,860 tons and 20.75 months.
Shoho at 45%. Still requires 16,830 tons and 22.25 months.
Atsusa at 100%. Still requires 0 tons and 0.75 months.
Zansho at 72%. Still requires 1005 tons and 3.75 months.
Asasamu at 72%. Still requires 1005 tons and 3.75 months.
Kameko-chan at 37%. Still requires 4863 tons and 7 months.
Kuun, Paruteno, Majeru, Chandana, Niimu, Ietta, Odetto, Aarora, Jiseru, Bakusuchuaru, Dai-mon, Vitta-Shasse, and Toki at 60%. Still require 233 tons and 4 months.
Shizu at 30%. Still requires 407 tons and 7 months.
IV) Finished ships
None
V) Planned projects.
None
Current fleet:
At the end of the 3rd Quarter
Limited warships:
- Battleships (6): 4 Fuso class and 2 Nagato class active.
- Carriers (1+2): 1 Hosho class active. 2 Zuiho class under construction.
- Heavy/Armored Cruisers (8+0): 4 Asama and 4 Jakumo class active. None under construction.
- Light Cruisers (13+1): 2 Tenryu class, 5 Kuma class, and 6 Nagara class active. Kameko-chan under construction.
- 1st Class Destroyers (0+0): None active. None under construction.
- 2nd Class Destroyers (22+0): 13 Minekaze class and 9 Kamikaze class active. None under construction.
- CDS (0+3): None active. 3 Atsusa class under construction.
- Submarines (5+0): 2 Ie Ichi class and 5 Ie Ni class active.
Hosho finished shakedown cruise on December 10th.
Mutsu on shakedown cruise.
Unlimited warships:
Sloops (0): None active..
Gunboats (24): 24 Go-ichi class active.
Minelayer (27): 27 Ri-ichi class active.
Minesweeper (1
: 18 Mu-ichi class active.
Small submarine chaser (42): 42 Shi-ichi class active.
Destroyer class 3 (45+13): 45 Ki-ichi class acive, 14 FSS:F class under construction.
Corvette (30): 30 Fu-ichi class active.
Large submarine chaser (30): 30 Ao-ichi class active.
Construction/Repair activity:
I) Slips/Docks:
- Shoho under construction and launched from Slip V-4A at Mitsubushi Co, Nagasaki (Kyushu).
- Kameko-chan under construction on Slip III-9A at Wakayama Navy Yard, Wakayama (Honshu)
- Kuun under construction and launched from Slip I-1A at Kure Navy Yard, Kure (Honshu)
- Paruteno under construction and launched from Slip I-2A at Yokosuka Navy Yard, Yokosuka (Honshu)
- Majeru under construction and launched from Slip I-5A at Fukuoka Navy Yard, Fukuoka (Kyushu)
- Chandana under construction and launched from Slip I-6A at Hakodate Navy Yard, Hakodate (Hokkaido)
- Niimu under construction and launched from Slip I-7A at Aomori Navy Yard, Aomori (Honshu)
- Ietta under construction and launched from Slip I-8A at Kagoshima Navy Yard, Kagoshima (Kyushu)
- Odetto under construction and launched from Slip I-9A at Wakayama Navy Yard, Wakayama (Honshu)
- Aarora under construction and launched from Slip I-10A at Tokushima Navy Yard, Tokushima (Shikoku)
- Jiseru under construction and launched from Slip I-11A at Niigata Navy Yard, Niigata (Honshu)
- Bakusuchuaru under construction and launched from Slip I-11B at Niigata Navy Yard, Niigata (Honshu)
- Dai-mon under construction and launched from Slip I-12A at Niihama Navy Yard, Niihama (Shikoku)
- Vitta-Shasse under construction and launched from Slip I-12B at Niihama Navy Yard, Niihama (Shikoku)
- Toki under construction and launched from Slip II-5A at Fukuoka Navy Yard, Fukuoka (Kyushu)
- Shizu laid down and under construction on Slip II-6A at Hakodate Navy Yard, Hakodate (Hokkaido)
All other slips and docks are currently not used.
II) Free-floating construction
- Atsusa under construction at Fukuoka Navy Yard, Fukuoka (Kyushu).
- Zuiho under construction at Kawasaki Co, Kobe (Honshu).
- Zansho under construction at Kawasaki Co, Kobe (Honshu).
- Asasamu under construction at Mitsubushi Co, Nagasaki (Kyushu).