You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, January 25th 2005, 2:22am

Germany, Q1/26

German Naval Developments - Q1/26

A. Industrial Allocation


Factory Allocation:

Warship Material: 5
Infrastructure (Committed): 7
Infrastructure (Non-committed): 0

Warship Material Produced: 5,000 t
Stockpile: 2,146 t
Recycled Scrap: 98 t
Material Used on Construction: 5,594 t
New Stockpile: 1,552 t

B. Infrastructure Development

The Type 3 slipway at Kiel receives 0.7 pts for a total of 2.5 pts.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-212 laid down 1/1/26, receives 426 t
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle

At Bremerhaven

1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD Z-209 receives 426 t

At Cuxhaven

1 Type 3 slip: CL Ersatz Nymphe laid down 1/1/26, receives 1400 t
1 Type 3 drydock: CL Ersatz Niobe receives 1400 t, launched 31/1/26
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
Free-floating: CL Ersatz Arcona receives 1400t

At Kiel

1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-210 receives 426 t
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-208 receives 214 t, completing 14/2/26

D. Transactions

DD G-7 scrapped at Bremerhaven, 98 t to be available for Q4

Schedule for previously scrapped vessels: V-2's 98 t available this quarter, V-3 in Q2, V-5 and V-6 in Q3. 98 t each.

E. Other Notes

DD Z-206 completes shake-down cruise.

DD Z-207 continues shake-down cruise

DD Z-208 commences shake-down cruise

New Orders: 1 light cruiser, 1 destroyer.

F. Updated Order of Battle, 31/3/26 Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+3
DD: 24(0)+3, with G-7 sent to the breakers.
SL: 6(0)+0
AM: 10(0)+0

Note: PD = pre-dreadnought