German Naval Developments - Q1/26
A. Industrial Allocation
Factory Allocation:
Warship Material: 5
Infrastructure (Committed): 7
Infrastructure (Non-committed): 0
Warship Material Produced: 5,000 t
Stockpile: 2,146 t
Recycled Scrap: 98 t
Material Used on Construction: 5,594 t
New Stockpile: 1,552 t
B. Infrastructure Development
The Type 3 slipway at Kiel receives 0.7 pts for a total of 2.5 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-212 laid down 1/1/26, receives 426 t
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD Z-209 receives 426 t
At Cuxhaven
1 Type 3 slip: CL Ersatz Nymphe laid down 1/1/26, receives 1400 t
1 Type 3 drydock: CL Ersatz Niobe receives 1400 t, launched 31/1/26
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
Free-floating: CL Ersatz Arcona receives 1400t
At Kiel
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-210 receives 426 t
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-208 receives 214 t, completing 14/2/26
D. Transactions
DD G-7 scrapped at Bremerhaven, 98 t to be available for Q4
Schedule for previously scrapped vessels: V-2's 98 t available this quarter, V-3 in Q2, V-5 and V-6 in Q3. 98 t each.
E. Other Notes
DD Z-206 completes shake-down cruise.
DD Z-207 continues shake-down cruise
DD Z-208 commences shake-down cruise
New Orders: 1 light cruiser, 1 destroyer.
F. Updated Order of Battle, 31/3/26 Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+3
DD: 24(0)+3, with G-7 sent to the breakers.
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought