You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Tuesday, April 6th 2004, 2:37pm

Quarterly Report #8 for the SAE

[SIZE=3]SAE Quarterly Reports [/SIZE]
No. 8 – October to December 1922

Transfers:

None


[SIZE=3]Factories:[/SIZE]

25 factories total can be used.

Fixed factories

5 factories will be fixed to produce infrastructure points for 1922.

Flexible factories

36ts material transferred from Q4

19,465s material necessary to be produced in this quarter (20 factories).

0 factory producing 0,0pts for infrastructure.

Infrastructure points used this quarter:

1,0pts put into a new factory (#26) for a total of 8,9pts at the end of Q4
0,0pts put into a new Type 1 Dock in Daressalam for a total of 0,2pts at the end of Q4


[SIZE=3]Ships: [/SIZE]

Minor vessels

Completed Units

13x Flower-class minesweeper
15x Tree-class minesweeper
1x Bush-class minesweeper

7x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops

On Trials

3x Bush-class minesweeper
- Syringa running trials until October 22
- Hazel running trials until February 23
- Barberry running trials until March 23

Ordered Units

4x Bush-class Minesweeper (11 month á 53ts material necessary per unit)
- Blackberry laid down in Montevideo on a Type 0 slip in January, completed in October 22
- Buddleia laid down in Montevideo on a Type 0 slip in January, completed in October 22
- Ash laid down in Buenos Aires on a Type 0 slip in January, completed in October 22
- Blackthorn laid down in St. Helena on a Type 0 slip in August, completed in May 23

5x Guard-class Patrol Craft (11 month á 175ts material necessary per unit)
- Alerter laid down in Durban on a Type 3 slip in January, completed in November 22
- Guard laid down in Cape Town on a Type 3 slip in February, completed in December 22
- Look-Out laid down in Montevideo on a Type 4 slip in January, completed in November 22
- Minder laid down in St. Helena on a Type 1 dock in January, completed in November 22
- Keeper laid down in Port Louis on a Type 2 slip in October, completed in August 22

4x Mimir-class Floatplane Carrier (11 month á 180ts material necessary per unit)
- Mimir laid down in Cape Town on a Type 3 slip in February, completed in December 22
- Trym laid down in Buenos Aires on a Type 3 slip in January, completed in November 22
- Gymir laid down in Mare del Plata on a Type 2 slip in February, completed in December 22
- Farbaute laid down in Montevideo on a Type 3 slip in April, completed February 23

Refit

1x Polar-class Sloop (2 month á 120ts material necessary per unit)
- Snow-Flake entering a Type 0 dock on the Prince Eduard Islands in October. Leaving the dock in November, the sloop will stay another month in the yard.

4x Centaur-class Sloop (2 month á 120ts material necessary per unit)
- Cheiron entering a Type 1 dock in Douala in October. Leaving the dock in November, the sloop will stay another month in the yard.
- Nessos entering a Type 0 dock in Douala in October. Leaving the dock in November, the sloop will stay another month in the yard.
- Pholos entering a Type 1 dock in Libreville in October. Leaving the dock in November, the sloop will stay another month in the yard.
- Eurytion entering a Type 0 dock in Libreville in October. Leaving the dock in November, the sloop will stay another month in the yard.


Destroyers

Completed Units

11x Bird-class torpedoboat
12x Cat-class torpedoboat
6x Hound-class torpedoboat
4x Nymph-class destroyer

On Trials

2x Nymph-class destroyer
- Doris running trials until February 23
- Doto running trials until March 23

Ordered Units

6x Nymph-class destroyer (11 month á 129ts material necessary per unit)
- Dynamene laid down in Durban on a Type 1 slip in January, completed in November 22
- Eione laid down in Durban on a Type 1 slip in January, completed in November 22
- Erato laid down in Port Elizabeth on a Type 1 slip in February, completed in December 22
- Euagora laid down in Daressalam in a Type 1 dock in January, completed in November 22
- Euarne laid down in Majunga on a Type 1 slip in October, completed in August 23
- Eudora laid down in Port Louis on a Type 1 slip in November, completed in September 23

6x Hound-class torpedoboat (11 month á 104ts material necessary per unit)
- Greyhound laid down in Douala on a Type 1 slip in February, completed in December 22
- Spaniel laid down in Montevideo on a Type 1 slip in March, completed in January 23
- Borzoi laid down in Buenos Aires on a Type 1 slip in February, completed in December 22
- Basenji laid down in Mar del Plata on a Type 1 dock in January, completed in November 22
- Basset Fauve de Bretagne laid down in St. Helena on a Type 1 dock in March, completed in January 23
- Basset Hound laid down in Cape Town on a Type 1 slip in April, completed in February 23


Class B Cruisers

Completed Units

11x Insect-class torpedoboat
4x Nampula-class light cruiser
5x Pietermaritzburg-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
1x Libreville-class light cruiser

On Trials

3x Libreville-class light cruiser
- Maroua running trials until October 22
- St. Denis running trials until February 23
- Iringa running trials until March 23

Ordered Units

4x Rosario-class light cruiser (17 month á 457ts material necessary per unit)
- Rosario laid down in Durban on a Type 2 slip in February
- San Lorenzo laid down in Cape Town on a Type 2 slip in January
- Koumba laid down in Port Elizabeth on a Type 2 slip in March
- Belinga laid down in Daressalam on a Type 2 slip in October


Class A Cruisers

Completed Units

1x Colony-class AC
2x General-class AC

Ordered Units

None


Capital Units

Completed Units

1x Madagascar-class
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class

Ordered Units

2x Mocambique-class (768ts/month material necessary per unit)
- Mocambique building on a Type 4 slip in Durban until October 1923
- Rhodesia building on a Type 4 slip in Durban until July 1924


Coastal Defence Units

Completed Units

Nonce

Ordered Units

None


Carriers

Completed Units

1x Wim Kraash-class (converted freighter, rated as experimental)

Ordered Units

None


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

14x G-class submarine
15x I-class submarine
12x H-class submarine

Ordered Units


Non-combatants

Completed Units

14x Bay-class tender (several different designs)

Ordered Units

None