*corrections made to order of battle and to correct errors*
A. Industrial Allocation
8/30 factories (non fixed) to naval materials: 8,000 tons created for Q3/1926 plus 502 tons stockpiled from Q2/25 plus 4575 tons of slavaged scrap materials plus 675 tons transfered from Chile in Q3/1926 for 13,752 total tons.
13,752 tons used for ship building, 0 tons stockpiled for next quarter.
15/30 factories (fixed) to infrastructure development: 1.5 points for Q3/1926
7/30 factories (non fixed) to infrastructure development: 0.7 points for Q3/1926
Total 2.2 infrastructure points created
B. Infrastructure Development
2.2 points added to ports at Phelleus, Lycabettus, Cleito, Maracaibo and Illissus
0.5 points added to 1 type 1 slip at Phelleus
0.5 points added to 1 type 1 slip at Lycabettus
0.3 points added to 1 type 0 slip at Cleito
0.3 points added to 1 type 0 slip at Maracaibo
0.2 points added to 1 type 0 slip at Maracaibo
0.2 points added to 1 type 0 slip at Illissus
0.2 points added to 1 type 0 slip at Illissus
C. Naval Construction
At Cleito Type 4 port (7/9)
Class 4 Slip #1 -CV Alioth building, 3000 tons used, 1000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - BB Aggamemnon converting to Gunnery training ship, 2,450 tons needed, 12,150 tons used, 1,927 tons added in Q4/24
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - completes construction
Class 0 Slip #1 - begins construction, 0.3 points added
At Eridanus Type 4 port (8/9)
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Uproar rebuilding, 565 tons needed, 300 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
At Duecalion type 3 port (6/7)
Class 3 Slip #1 - CL Ares building, 2,000 tons used, 1,000 tons added
Class 3 Slip #2 - CL Oceanus building, 2,000 tons used,1,000 tons added
Class 3 Drydock #1 - AC Cape Verde converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted
Class 2 Slip #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Upstart rebuilding, 565 tons needed, 300 tons added
3x115 ton E class subchaser/patrol boats also being constructed.
At Illissus type 3 port (7/7)
Class 3 Slip #1 - CA Astyanax launched, 3,696 tons needed, 7,000 tons used, 1,000 tons added.
Class 3 Slip #2 - CA Sarpedon launched, 3,696 tons needed, 7,000 tons used, 1,000 tons added.
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Upstage rebuilding, 565 tons needed, 300 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - completes construction
Class 0 Slip #1 - Idle
Class 0 Slip #2 - completes construction
Class 0 Slip #3 - begins construction, 0.2 points added
Class 0 Slip #4 - begins construction, 0.2 points added
3x115 ton E class subchaser/patrol boats also being constructed.
At Phelleus type 5 port (9/11)
Class 3 Slip #1 - CL Persephone building, 2,000 tons used,1,000 tons added
Class 3 Slip #2 - CL Artemis building, 2,000 tons used,1,000 tons added
Class 3 Drydock #1 - AC Venezuela converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - begins construction, 0.5 points added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - completes construction
3x115 ton E class subchaser/patrol boats also being constructed.
At Lycabettus type 4 port (8/9)
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Unruly rebuilding, 565 tons needed, 300 tons added
Class 2 Drydock #2 - Uncouth rebuilding, 565 tons needed, 300 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - begins construction, 0.5 points added
Class 1 Drydock #1 - Unorthodox rebuilding, 565 tons needed, 300 tons added
3x115 ton E class subchaser/patrol boats also being constructed.
At Maracaibo type 3 port (5/7)
Class 3 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - MPSS ship Efficax building, 4,473 tons needed, 3,441 tons used, 1,000 tons added
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Under construction, 0.2 points used, 0.3 points added
Class 0 Slip #2 - begins construction, 0.2 points added
At Safi type 2 port (4/5)
Class 2 Drydock #1 - Unity rebuilding, 565 tons needed, 300 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Underhand rebuilding, 565 tons needed, 300 tons added
Launched ships being completed:
None
Ships completed and on trials
CA's Menelaus and Peleus on trials
DD's Goshawk, Greyhound, Grenade, Grey, Goldfinch, Gladiator, Gambler and Gazelle complete trials
MPSS ship Patronus on trials
MS-20, MS-21, MS-22, MS-23, MS-24, MS-25 Begin trials
SS R-62, SS R-63, SS R-64, SS R-65, SS R-66, SS R-67, SS R-68, SS R-69, SS R-70, SS R-71, SS R-72, SS R-73 begin trials
Summary of ship building/repairs/rebuilds and convertions.
BB Aggamemnon converting to gunnery training ship
AC's Cape Verde and Venezuela converting to training ships, work suspended.
CV Alioth building
CA's Astyanax and Sarpedon launched, building
4xAres class CL's building
6x MS-11 class minesweepers completed
12x R-62 class coastal subs completed
MPSS Efficax building
12 E class sub chasers building
D. Transactions
Float Plane Carriers Praia and Mindelo sold to Chile
Subchasers SC 1-12 sold to Chile
675 tons recieved from Chile for payment of Floatplane Carrier and Subchaser Purchase.
Total cost is 2700 tons of materials
E. Other Notes
BB Aggamemnon and AC's *Cape Verde and *Venezuela converting to gunnery training ships.
*conversions susspended
Nereus class CL's complete scrapping, 6x6", 24x4", 12x3", 12x18" torpedo tubes salvaged for future use in coastal defences and 2,127 tons of materials recycled
Brencis class scout cruisers complete scrapping, 32x4", 8x3", 16x18" torpedo tubes salvaged for future use in coastal defences and 2,448 tons of materials recycled
Admiraly type 1 destroyers Uproar, Upstart, Upstage, Unruly, Uncouth, Unorthodox, Unity and Underhand undergoing rebuild
F. Updated Order of Battle, 1/1/26
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 9(1)0
BC: 2(0)0
CV: 3(0)1
CA: 12(0)2
CAE:0(0)0
CL: 49(0)4
DD: 122(
0
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats 12(0)0
Patrol vessels 50(0)0
Mine sweepers 24 (0) 0
Sub chasers 276(0)12
Fleet Submarine: 20(0)0
Coastal Submarine: 72(0)0
Floatplane carrier/tenders 4(0)0
destroyer depot ships 2(0)0
Submarine depot ships 2(0)1
Repair ships 2(0)0
Auxillary's N/A