[SIZE=4]SAE Quarterly Reports[/SIZE]
No. 65 – January to March 1937
[SIZE=3]Transfers/Notes:[/SIZE]
First payment from China (1760ts) for building a cruiser in the SAE
[SIZE=3]Factories:[/SIZE]
26 factories total can be used.
Fixed factories
1 factory will be fixed to produce infrastructure points for 1937.
Flexible factories
118ts material transferred from Q4 (incl. material recovered from scrapyard).
24,578ts of material need to be produced in this quarter (25 factories).
0 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,1pts put into factory #27 for a total of 3,7pts at the end of Q1/37.
[SIZE=3]Ships:[/SIZE]
Minor vessels
Completed Units
34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch
36x R28-class motor launch
23x R31-class motor launch
26x S34-class motor torpedo boat
12x S36-class motor torpedo boat
8x Tree-class minesweeper (Type 16)
13x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
3x Flower-class minesweeper (Type 35)
4x Circe-class sloops
4x Polar II-class sloops
12x River-class frigate
6x Pleiades-class light destroyer
8x Planet-class light destroyer
2x Bird-class light destroyer
4x Guard-class patrol crafts
4x GB35-class river gun boat
2x RM36A-class river monitors
On Trials
1x LD35-class light destroyer
- LD35-4 Swallow running trials until January 37
4x FR35-class frigate
- FR35-1 Rukwa running trials until February 37
- FR35-2 Njassa running trials until March 37
- FR35-3 Chilwas running trials until April 37
- FR35-4 Chiuta running trials until April 37
Ordered Units
5x LD35-class light destroyer (10 month á 71ts material necessary per unit)
- LD35-3 Mohawk laid down in Majunga on a Type 1 slip in May 36, completed in February 37
- LD35-5 Kestrel laid down in Port Louis on a Type 1 slip in August 36, completed in May 37
- LD35-6 Red Kite laid down in Port Elizabeth on a Type 1 slip in December 36, completed in September 37
- LD35-7 Eagle laid down in Montevideo on a Type 1 slip in October 36, completed in July 37
- LD35-8 Sparrow laid down in Majunga on a Type 1 slip in March 37, completed in December 37
1x Lorelei-class coast guard cutter (11 month á 136ts material necessary per unit)
- Lorelei laid down in Daressalam on a Type 1 slip in August, completed in June 37
5x MS35-class minesweeper (5 month á 87ts material necessary per unit)
- MS35-8 Iris laid down in Port Louis on a Type 0 slip in November 36, completed in March 37
- MS35-5 Lotus laid down in Montevideo on a Type 0 slip in October 36, completed in February 37
- MS35-6 Hyacinth laid down in Montevideo on a Type 0 slip in October 36, completed in February 37
- MS35-7 Foxglove laid down in Buenos Aires on a Type 0 slip in October 36, completed in February 37
- MS35-4 Lily laid down in St. Helena on a Type 0 slip in October 36, completed in February 37
1x R37-class motor launch (1 month á 99ts material necessary per unit)
- R73 laid down in Lüderitz in February, completed in February 37
Rebuilds/Refits/Repairs
None
Scrapping
None
Destroyers
Completed Units
8x Cat-class torpedoboat (Type 16)
8x Hound-class torpedoboat (Type 21)
10x Hound-class torpedoboat (Type 26)
8x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
On Trials
5x TB35-class torpedo boat
- Salamander running trials until March 37
- Lizard running trials until April 37
- Chameleon running trials until May 37
- Gecko running trials until June 37
- Goanna running trials until June 37
Ordered Units
3x TB35-class torpedo boat (11 month á 110ts material necessary per unit)
- Iguana laid down in Cape Town on a Type 1 slip in April, completed in February 37
- Anolis laid down in Buenos Aires on a Type 1 slip in January 37, completed in December 37
- Snapper laid down in Mar del Plata on a Type 1 slip in January 37, completed in December 37
2x Weapon-class large destroyer (11 month á 174ts material necessary per unit)
- DL36-1 Bombard laid down in Cape Town on a Type 3 slip in November 36, completed in September 37
- DL36-2 Musket laid down in Cape Town on a Type 2 slip in March 37, completed in January 38
Rebuilds/Refits/Repairs
None
Scrapping
1x TB21-class torpedo boat (4 month total, 2 month in Type 2 dock)
- Terrier scrapping in Mar del Plata starting in May, finished in August – 171ts received from hull for Q2/1937
Class B Cruisers
Completed Units
2x Nampula-class light cruiser (Type 08)
4x Port Shepstone-class light cruiser (Type 13)
5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Daphne-class anti aircraft cruiser (Type 34)
4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)
On Trials
None
Ordered Units
1x CM36fast2-class mine cruiser (13 month á 301ts material necessary per unit)
- CM36fast2-1 Lightning laid down in Durban on a Type 4 slip in October 36, completed in October 37
2x Danae-class anti aircraft cruiser (17 month á 460ts material necessary per unit)
- Danae laid down in Cape Town on a Type 3 slip in October 36, completed in February 38
- Dido laid down in Buenos Aires on a Type 3 slip in March 37, completed in July 38
1x CLAA36-class anti aircraft cruiser (17 month á 460ts material necessary per unit)
- CLAA38-China laid down in Daressalam on a Type 3 slip in January 37, completed in May 38
Repairs/Rebuilds/Refits
None
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
1x Hero-class (Type 33)
1x Radiance-class
On Trials
1x Radiance-class heavy cruiser
- Brilliance running trials until February 37
Ordered Units
1x Hero-class heavy cruiser (21 month á 555ts material necessary per unit)
- Belerophon laid down in Buenos Aires on a Type 3 slip in October 34, all work halted August 35, work commenced in April 36, completed in February 37
1x CA36E-class heavy cruiser (24 month á 624ts material necessary per unit)
- CA36E-1 Vengeance laid down in Montevideo on a Type 4 slip in October 36, completed in September 38
Repair/Refits
None
Scrapping
None
Capital Units
Completed Units
2x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
1x Ophion-class
2x Triumph-class
2x Imperator-class
On Trials
1x Ophion-class battleship
- Ophion running trials until January 37
Ordered Units
2x BB33Lh-class battleship (48 month á 796ts material necessary per unit)
- Monarch laid down in Montevideo on a Type 4 slip in January 33, all work halted August 35, work commenced in April 36, completed in August 37
- Sovereign laid down in Buenos Aires on a Type 4 slip in January 34, all work halted August 35, work commenced in May 36, completed in September 38
Rebuilds/Refits
None
Scrapping
2x Hertog-class battlecruiser (11 month total, 5 month in Type 3 dock)
- Hertog Alexander scrapping in Durban starting in July, finished in May 37 – 3842ts received from hull for Q1/1938
- Hertog Rijnhard scrapping in Durban starting in October, finished in August 37 – 3842ts received from hull for Q2/1938
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class
1x LCDS-class
2x LCDS-2-class
On Trials
1x CDS8-class CDS
- Excalibur running trials until February 37
Ordered Units
None
Rebuilds/Refits
None
Carriers
Completed Units
1x Forge-class fleet carrier (Type 26)
2x Anvil-class light fleet carrier (Type 30)
3x Mimir-class floatplane carriers
1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
On Trials
1x CV34-class fleet carrier (30 month á 687ts material necessary per unit)
- Thomas van Deen running trials until March 37
Ordered Units
1x CV34-class fleet carrier (30 month á 687ts material necessary per unit)
- Cornelis Keser laid down in Cape Town on a Type 3 slip in October 34, all work halted August 35, work commenced January 36, completed August 37
1x CVL36-class light fleet carrier (19 month á 520ts material necessary per unit)
- Michel Endress laid down in Durban on a Type 3 slip in October 36, completed in August 38
2x AV36-class floatplane carrier (16 month á 387ts material necessary per unit)
- Unicorn laid down in Port Elizabeth on a Type 4 slip in November 36, completed in February 38
- Gryphon laid down in Durban on a Type 2 slip in January 37, completed in April 38
Rebuilds/Refits
None
Class A Submarines
Completed Units
9x E-class submarine
13x F-class submarine
3x J-class submarine
2x L-class submarine
2x M-class submarine
On Trials
2x M-class fleet submarine
- M3 running trials until April 37
- M4 running trials until May 37
Ordered Units
2x M-class fleet submarine (11 month á 99ts material necessary per unit)
- M5 laid down in Durban on a Type 0 slip in November, completed in September 37
- M6 laid down in Durban on a Type 0 slip in December 36, completed in October 37
Repairs/Rebuilds/Refits
None
Class B Submarines
Completed Units
15x I-class submarine
7x H-class submarine
13x K-class submarine
On Trials
None
Ordered Units
None
Repairs/Rebuilds/Refits
None
Scrapping
None
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
2x Bay-class tender (Type 19)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
1x Bay-class tender (Type 35)
1x FV32-class fleet support ship
On Trials
None
Ordered Units
2x FV36-class fleet support ship
- FV36-1 Sharon den Adel laid down in Port Louis on a Type 2 slip in July 36, completed in January 38
- FV36-2 Tarja Turunen laid down in Montevideo on a Type 2 slip in October 36, completed in April 38
1x TD35-class tender (15 month á 363ts material necessary per unit)
- TD35-2 Corisco Bay II laid down in Mar del Plata on a Type 2 slip in July, completed in September 37
Repairs/Rebuilds/Refits
None
---------------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
89 ASW launches
59 motor launches
38 motor torpedo boats
34 minesweepers
40 small patrol crafts
4 river gunboat
2 river monitors
97 TB/DD/DLs of less than 2,000ts
43 cruisers category b
10 cruisers category a
13 capital units
6 costal defence ships
3 fleet carrier
35 submarines category b
29 submarines category a
6 floatplane carriers
19 armed tenders
1 fleet support ship
plus numerous auxiliary vessels of all kind.