You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, March 18th 2004, 2:45pm

Germany, Q3/22

German Naval Developments - Q3/22

A. Industrial Allocation


4/11 factories to naval materials; 4,000 t created, plus a stockpile of 891 t for 4,891 tons. 3,699 t of which is used, while 1,192 t are stockpiled.

6/11 factories (committed) to infrastructure development, producing 0.6 pts, bonus pts for Q4.

1/11 factories (non-committed) to infrastructure, producing 0.1 pts.

B. Infrastructure Development

Factory 12 receives 0.7 pts, for a total of 1.9 pts.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: CL Gazelle undergoes refit, receiving 791 t
1 Type 1 slip: Patrol Boat VB-3 laid down 1/7/22, receives 319 t
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle
Free-floating: Patrol Boat VB-1 receives 319 t; due to complete 30/10/22

At Bremerhaven

1 Type 2 slip:
1 Type 1 slip: Patrol Boat VB-4 laid down 1/7/22, receives 319 t
1 Type 1 drydock: idle
1 Type 0 slip: idle
Free-floating: Patrol Boat VB-2 receives 319 t; due to complete 30/10/22

At Cuxhaven

1 Type 3 slip: idle
1 Type 3 drydock:
1 Type 2 slip: Idle
1 Type 1 slip: Minesweeper R-1 laid down 1/7/22, receives 221 t
1 Type 0 slip: idle
Free-floating: CL Munchen receives 740 t, completes 1/9/22

At Kiel
1 Type 2 drydock:
1 Type 1 slips: Minesweeper R-2 laid down 1/7/22, receives 221 t
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle

Commericial shipyards build three 150 t coastal submarine chasers.

D. Transactions

None

E. Other Notes

CL Emden continues shakedown cruise while CL Munchen begins hers.

New Orders: two minesweepers, two patrol boats

F. Updated Order of Battle, 31/9/22

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(0)+0
CL: 10(1)+0
DD: 24

Note: PD = pre-dreadnought


HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

2

Thursday, March 18th 2004, 2:48pm

ERROR?

Quoted

Originally posted by The Rock Doctor
German Naval Developments - Q3/22

A. Industrial Allocation


4/11 factories to naval materials; 4,000 t created, plus a stockpile of 891 t for 4,891 tons. 3,699 t of which is used, while 1,192 t are stockpiled.

6/11 factories (committed) to infrastructure development, producing 0.6 pts, bonus pts for Q4.

1/11 factories (non-committed) to infrastructure, producing 0.1 pts.


Erhm.... Wouldn´t it make sense to make that 3/11; 6/11 and 2/11 ?!?!

Or do you need so much stockpiled stuff for your next quarter?

Just curious...

HoOmAn

3

Thursday, March 18th 2004, 8:08pm

Probably would make more sense, but the net result is the same once Q4 is done.

The stockpile's going to be used up next quarter (for the most part).