You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, May 28th 2020, 5:04am

Kingdom of Greece Q2 1949

Industrial Allocation
10/15 factories producing 10000t materials.
5/15 factories producing 0.5 infrastructure. (non-dedicated)
0/15 Factories producing infrastructure. (dedicated)
373from stockpile.
Ot from transactions.
Ot from scraping.
10373t Total materials available
10112 t Used
261t Stored

Infrastucture Development
Volos:
- 0.3 IP added to the construction of a Type 0 Slip at Volos. - 0.2 instaled, 0.2 remaining.
- 0.2 IP added to the construction of a Type 1 Slip at Volos. - 0.2 instaled, 0.8 remaining.


Naval Construction
Attica:
Type 3 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Ares; laid down April 1st, 1940. 2162,5 tons required. 689 tons added in Q2/1949 for a total of 1180/ 2162,5 tons. 982,5/ 2162,5 tons remaining.
Type 2.5 Slip #1 - Argos Class heavy cruiser Argos; laid down May 1st, 1949. 11827 tons required. 1971,17 tons added in Q2/1949 for a total of 1971,17/ 11827 tons. 9855,83/ 11827 tons remaining. Launched December 12th, 1949. Completed december 28th, 1950.
Type 2 Slip #1 - Tiriis Class light cruiser Tiriis; laid down january 15tht, 1949. 7425 tons required. 1743 tons added. In Q2/1949 for a total of 1743/7425 tons. 5229/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 2 Slip #2 - Tiriis Class Light Cruiser Tetríreis; laid down january 15tht, 1949. 7425 tons required. 1743 tons added. In Q2/1949 for a total of 1743/7425 tons. 5229/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 1 Slip #1 - Nemea Class destroyer Nemea; laid down january 1st, 1949. 2082 tons required. 947 tons added in Q2/1949 for a total of 947/2082 tons. 947/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Slip #1 - Porject AS1 Paros; laid down May 4th, 1949. 381 tons required. 381 tons added. In Q2/1949 for a total of 381/381 tons. 0/381 tons remaining. Launched June 15th, 1949. Completed July 15th, 1949.
Type 0 Slip #1 - Makhai Class Ioke; laid down May 3th, 1949. 720 tons required. 240 tons added in Q2/1949 for a total of 240/ 884 tons. 480/720 tons remaining. Launched July 26th, 1949. Completed January 24th, 1949.


Dockside:

Paros:
Type 1 Dry-Dock #1 -
Type 0 Dry-Dock #1 -

Dockside:

Patra:
Type 1 Dry-Dock #1 -
Type 1 Slip #1 - Nemea Class destroyer Nemesis; laid down january 1st, 1949. 2082 tons required. 947 tons added in Q2/1949 for a total of 947/2082 tons. 947/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Dry-Dock #1 -

Dockside:

Salamis:
Type 1 Dry-Dock #1 -

Dockside:

Souda Bay:
Type 4 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Slip #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Apollo; laid down April 7th, 1941. 2162,5 tons required. 689 tons added in Q2/1949 for a total of 1180/ 2162,5 tons. 982,5/ 2162,5 tons remaining.
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -

Dockside:

Thessaloniki:
Type 2 Dry-Dock #1 -
Type 0 Dry-Dock #1 -
Type 0.5 Slip #1 - Porject AS1 Volos; laid down May 4th, 1949. 381 tons required. 381 tons added. In Q2/1949 for a total of 381/381 tons. 0/381 tons remaining. Launched June 15th, 1949. Completed July 15th, 1949.

Type 0.5 Slip #2 - Porject AS1 Limassol; laid down May 4th, 1949. 381 tons required. 381 tons added. In Q2/1949 for a total of 381/381 tons. 0/381 tons remaining. Launched June 15th, 1949. Completed July 15th, 1949.

Dockside:


Volos:
Type 1 Dry-Dock #1 -
Slip type 0 nº?

Dockside:

Limassol:
Type 3 Dry-Dock #1 -
Type 1 Dry-Dock #1 -


Note: The Project M2A1 has change it name to Project AS1

2

Wednesday, June 3rd 2020, 12:08am

I forgot to add it so here it is.
Also. I know that this not the place to ask but would do you like if I post about some greek experiments? To be more clear. This experiments would be around different projects of the WW greek army, either successful or not. :?:

Order of Battle (Greek
Navy) Q1 1949


Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

[b]Fleet Combatants
[/b]
Battleships 5(0)+0
Heavy Cruisers 4(0)+1
Medium Cruisers 2(0)+0
Light Cruisers 19(2)+2
Aircraft Carriers 1(0)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+2
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+1
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 24(0)+0

Small Combatants
Subchasers (150t) 56(0)+3
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (200t) 30(0)+0
Harbour Launches (65t) 21(0)+0
Mtb 96(0)+0
Mgb 27(0)+0
Mms 22(0)+0

Auxiliaries
Special Transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 10(0)+0
Fleet Tugs 6(0)+0
Harbour Tugs 0(0)+0

[b]Training Squadron
[/b]
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0