A. Industiral Allocation
11/11 factories (non-fixed) to naval materials: 11000 tons created for Q2/1948
Stockpile after Q1/1948: 1079 tons
used for Transaction: 0 tons
received from others: 0 tons
warmaterial recycling: 0 tons (first quarter)
warmaterial recycling: 0 tons (second quarter)
Summary:
11000 tons (manufactured) + 1079 tons (stockpiled) + 0 tons (recycled) - 0 tons (transaction) + 0tons (received) = 12079 tons
used at Tianjin: 3416 tons
used at Shanghai: 300 tons
used at Zhanjiang: 600 tons
used at Kao-hsiung: 1500 tons
used at Taipei: 200 tons
used at Mako: 650 tons
used at Dairen: 0 tons
used for small vessels: 0 tons
Stockpile after Q2/1948: 668 tons
B. Infrastructure Development
C. Naval Construction
Bohai Shipbuilding at Tianjin:
S2 - #1: not in use
S1 - #1: not in use
S1 - #2: not in use
S0 - #1:
HICMS Shen Neng – 3; 584tons needed; 200tons received
S0 - #2:
HICMS Shen Neng – 4; 584tons needed; 200tons received
S0 - #3: not in use
S0 - #4: not in use
D2 - #1: not in use
D1 - #1:
HICMS Cuiniao – 2; 4560tons needed; 1000tons received
D0 - #2: not in use
Freefloating / in completation:
U-107 ; Guiyu-Class; 504tons needed; 504tons received; finished; start trials
U-108 ; Guiyu-Class; 504tons needed; 504tons received; finished; start trials
U-109 ; Guiyu-Class; 504tons needed; 504tons received; finished; start trials
U-110 ; Guiyu-Class; 504tons needed; 504tons received; finished; start trials
Kiangnan Dock & Engineering Works at Shanghai:
S2 - #1: not in use
S1 - #1: not in use
S0 - #1: not in use
S0 - #2: not in use
D4 - #1: not in use
D2 - #1: not in use
Freefloating / in completation:
HICMS Houbei-1; 558tons needed; 300tons received
Hudong-Zhonghua Shipbuilding at Zhanjiang:
S1 - #1: not in use
S0 - #1: not in use
S0 - #2: not in use
D1 - #1: not in use
Freefloating / in completation:
HICMS Houbei-2; 558tons needed; 300tons received
HICMS Houbei-3; 558tons needed; 300tons received
Waigaoqiao Shipbuilding at Kaoshiung:
D0 - #1: not in use
D0 - #2: not in use
D1 - #1:
HICMS Cuiniao – 1; 4060tons needed; 1500tons received
Freefloating / in completation:
Quindao Beihai Shipbuilding at Taipei:
S0 - #1:
HICMS Shen Neng – 1; 384tons needed; 200tons received; launched
S0 - #2: not in use
D2 - #1: not in use
D3 - #1: not in use
Freefloating / in completation:
Sun Yat Sen Shipbuilding at Mako:
S0 - #1:
HICMS Lauting; 573tons needed; 250tons received
S0 - #2:
HICMS Shen Neng – 2; 584tons needed; 200tons received
S0 - #3; not in use
D0 - #1:
HICMS Pengwu; 496tons needed; 200tons received
Freefloating / in completation:
Zjiangjin Shipbuilding at Dairen:
D0 - #1: not in use
D1 - #1: not in use
D2 - #1: not in use
Freefloating / in completation:
D. Transactions
Export: 0 tons
Import: 0 tons
Conversion:
HS-03 ex “Pearl of the Orient” requires 1740tons; 1740tons received; finished; start trials
HS-04 ex “Pearl of the Pacific” requires 1480tons; 1480tons received; finished; start trials
HICMS Houxin requires 1525tons; 1525tons reiceived; finished; start trials
E. Other Notes
stored guns:
F. Small vessels
Small vessels built by factories:
Small vessels built in drydocks:
G. Shakedown cruises
small trials = 3 month:
great trials (ships over 500tons) = 6 month:
start trials:
U-107
U-108
U-109
U-110
HS-03 ex “Pearl of the Orient”
HS-04 ex “Pearl of the Pacific”
HICMS Houxin
in trials:
HICMS Hai Ou-6
HICMS Hai Ou-7
HICMS Hai Ou-8
HICMS Hai Ou-9
HICMS Hai Ou-10
HICMS Haibing
finished trials:
CL Suhitou
CL Yaofeng
HICMS Luhai-6
HICMS Luhai-7
HICMS Luhai-8
HICMS Luhai-9
HICMS Luhai-10
BC Liu Xing
taken in service:
BC Tai-Pei
HICMS Linchong-2
HICMS Linchong-3
HICMS China – 2
HICMS China – 3
###################################
Hope there is no fault ... OOB is in work
###################################