You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, March 23rd 2016, 2:20am

Bharat, 1947

EMPIRE OF BHARAT, Q1/1947


May the Lord of the Oceans be Auspicious unto Us


TL;DR:

Laid Down: 1 LSD, 3 DD, 1 AK, 1 PB, 2 MTB, 1 LCT, 2 LCM, 1 RH
Completed: 3 PC, 1 AKA, 1 PB, 2 MTB, 1 LCT, 2 LCM, 1 RH
Scrapped: None


A. Factories

11/11 factories = 11,000 t of material + 8,459 t stockpiled + 227 t from Persia + 523 t from Hedjaz = 20,209 t available.

11,707 t are used, leaving a stockpile of 8,502 t.

0/11 factories (committed) = 0.0 + 0.0 bonus infrastructure pts available.

0/11 factories (flexible) = 0.0 infrastructure pts available.

0.2 IP received from Nordmark.


B. Infrastructure Development

Continue FD1.5 at Karachi: 0.2 IP for 1.2 IP of 1.25 IP required, ongoing


C. Naval Development and Construction

At Kolachi Naval Yard [Karachi]
FD1.5: *Under construction*

At Kanhoji Angre Shipworks (Mumbai):
S3: LSD Subedar Yugi Talsania laid down, receives 1,795 t, to complete 4/48
S2.5: Idle
S1.5: AK Naik Varun Madhav laid down to civilian standards, receives 250 t, to complete 3/48
S1: DD Aurangabad laid down, receives 523 t, to complete 11/47
D3.5: Idle
Free Floating:
Persian AOR#2 receives 227 t, to complete 8/47
CL Karachi receives 1,635 t, to complete 8/47
SS Nidara receives receives 386 t, to complete 5/47
AKA Havildar Alok Mehra receives 250 t, to complete 9/47
AKA Havildar Hiren Barua receives 157 t, completed 3/47

At Maldives Steel Works (Male):
D3: Idle
D1: SS Asanta undergoes 15% refit, receives 68 t, completed.
Free Floating:
None

At Diego Garcia Naval Base:
S1: Hedjazi DD-1947 laid down, receives 523 t, to complete 11/47
D1: SS Mazabuta undergoes 15% life extension refit, receives 69 t, completed.
Free Floating:


At Sri Lanka Iron Works (Trincomalee):
S1: DD Vijayawada laid down, receives 523 t, to complete 11/47
S1: Idle
S0: Idle
D2: Idle
Free Floating:
SS Sahasi receives 386 t, to complete 5/47
PC Haflong receives 0 t, completed 2/47
LCV-4 undergoes 15% refit, receives 53 t, completed

At Imperial Ship Yard (Chennai):
S3: Idle
S2: Idle
S1: DD Visakhapatnam laid down, receives 523 t, to complete 11/47
D4: Idle
D3: SS Saktisali undergoes 15% refit, receives 158 t, completed.
Free-floating:
CV Trishula receives 2,382 t, to complete 7/48
SS Dabanga receives 386 t, to complete 5/47
AD Petty Officer Sharang Nath receives 298 t, to complete 9/47
AD Lieutenant Abul Majumbar receives 297 t, completed 3/47

At Royal Sittwe Naval Yard (Sittwe):
S1: Idle
S0: LCT-18 laid down, receives 199 t, to complete 5/47
D1: DD Bhubaneshwar undergoes 15% refit, receives 228 t, completed.
FD0: Idle
Free Floating:
LCT-17 receives 0 t, completed 2/47
PC Tezpur receives 0 t, completed 2/47
PC Tinsukla receives 0 t, completed 2/47

Miscellaneous Small Craft Work

1 x 25 t Harbour Inspection Boat built
2 x 50 t MTB built
2 x 35 t LCM built
1 x 196 t River Hospitalboat built (last one)


D. Transactions:

Nothing new.


E. Other notes:

Two hospital ships, ten coastal sloops, and eight minesweepers have been ordered from Nordmark. Delivery dates have not been confirmed.


F. Disposal Report:

CL Trincomalee deleted from service; scrapping pending
Submarines IX-1, Satarka, Savadhana deleted from service; scrapping pending
Submarine Nipuna assigned to training duties


G. Updated Order of Battle, End of Quarter

Note: X(Y) +Z = completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 2(0) + 0
Aircraft Carriers (CV): 5(0) + 1
Armored Cruisers (AC): 2(0) + 0
Cruisers (CL): 18(0) + 1, one other to be scrapped
Daakuui (DA): 4(0) + 0
Destroyers (DD): 49(0) + 3
Submarines (SS): 38(0) + 3, three others to be scrapped

Patrol and Escort Ships

Frigates (PF): 4(0) + 0
Paratraatii (PP): 24(0) + 0
Charavaahii (PC): 22(0) + 0
Survey Ships (PS): 2(0) + 0
ASW Launches (ASL): 66(0) + 0
Harbour Patrol Craft (PH): 50(0) + 0

Coastal Forces

Monitors (BM): 1(0) + 0
Motor Gun Boats (MGB): 11(0) + 0
Motor Torpedo Boats (MTB/MGB): 79(0) + 0

Mine Warfare

Minelayers (CM): 7(0) + 0
Minesweepers (AM): 22(0) + 0

Training Units

Aircraft Carrier, Training (AVT): 1(0) + 0
Heavy Cruiser, Training (CAT): 1(0) + 0
Paritraataa, Training (PPT): 4(0) + 0
Submarine, Training (SST): 1(0) + 0

Auxiliaries and Fleet Train

Boom Defense Vessels (ABD): 13(0) + 0
Depot Ship (AD): 12(0) + 2
Disaster Relief Ships (ADR): 2(0) + 0
Hospital Ships (AHO): 1(0) + 0
Cargo Ship (AK): 0(0) + 1
Oilers (AOL): 2(0) + 0
Oilers, Replenishment (AOR): 4(0) + 0
Meteorological Observation Ship (AOM): 4(0) + 0
Packet (AP): 2(0) + 0
Repair Ships (AR): 2(0) + 0
Strategic Sealift Transport (AST): 4(0) + 0
Harbour Tugs (ATH): 12(0) + 0
Ocean-going Tugs (ATO): 8(0) + 0
Salvage Ship (ATS): 2(0) + 0
River Hospitalboats (RH): 13(0) + 0
Generator Barge: 2(0) + 0
Distillation Barge: 2(0) + 0

Amphibious Assault Ships

Armed Transport (APD): 4(0) + 0
Landing Ship, Dock (LSD): 1(0) + 1
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Ship, Tank (LST): 5(0) + 0
Landing Craft, Tank (LCT): 8(0) + 1
Landing Craft, Tank (LCV): 9(0) + 0
Landing Craft, Medium (LCM): 26(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0

2

Saturday, April 15th 2017, 2:40pm

EMPIRE OF BHARAT, Q2/1947


May the Lord of the Oceans be Auspicious unto Us


TL;DR:

Laid Down: 1 PC, 1 AO, 1 PB, 2 MTB, 1 LCT, 2 LCM
Completed: 3 SS, 1 PB, 2 MTB, 1 LCT, 2 LCM
Scrapped: None


A. Factories

11/11 factories = 11,000 t of material + 8,502 t stockpiled + 227 t from Persia + 523 t from Hedjaz = 20,252 t available.

12,293 t are used, leaving a stockpile of 7,959 t.

0/11 factories (committed) = 0.0 + 0.0 bonus infrastructure pts available.

0/11 factories (flexible) = 0.0 infrastructure pts available.

0.2 IP received from Nordmark.


B. Infrastructure Development

Continue FD1.5 at Karachi: 0.05 IP for 1.25 IP of 1.25 IP required, completed
Commence FD1.5 at Trincomalee: 0.15 IP for 0.15 IP of 1.25 IP required, underway.


C. Naval Development and Construction

At Kolachi Naval Yard [Karachi]
FD1.5: *Completed*

At Kanhoji Angre Shipworks (Mumbai):
S3: LSD Subedar Yugi Talsania receives 1,795 t, to complete 4/48
S2.5: AO Baratang laid down to civilian standards, receives 300 t, to complete 5/48
S1.5: AK Naik Varun Madhav receives 250 t, launched, to complete 3/48
S1: DD Aurangabad receives 523 t, launched, to complete 11/47
D3.5: Idle
Free Floating:
Persian AOR#2 receives 227 t, to complete 8/47
CL Karachi receives 1,635 t, to complete 8/47
SS Nidara receives receives 386 t, completed 5/47
AKA Havildar Alok Mehra receives 250 t, to complete 9/47

At Maldives Steel Works (Male):
D3: Idle
D1: SS Calaka undergoes 15% refit, receives 68 t, completed.
Free Floating:
None

At Diego Garcia Naval Base:
S1: Hedjazi DD-1947 receives 523 t, launched, to complete 11/47
D1: SS Aniyantrita undergoes 15% life extension refit, receives 69 t, completed.
Free Floating:
None

At Sri Lanka Iron Works (Trincomalee):
S1: DD Vijayawada receives 523 t, launched, to complete 11/47
S1: Idle
S0: PC Tumkur laid down, receives 499 t, to complete 8/47
D2: Idle
Free Floating:
SS Sahasi receives 386 t, completed 5/47
LCV-5 undergoes 15% refit, receives 53 t, completed

At Imperial Ship Yard (Chennai):
S3: Idle
S2: Idle
S1: DD Visakhapatnam receives 523 t, launched, to complete 11/47
D4: Idle
D3: SS Vira undergoes 15% refit, receives 158 t, completed.
Free-floating:
CV Trishula receives 2,382 t, to complete 7/48
SS Dabanga receives 386 t, completed 5/47
AD Petty Officer Sharang Nath receives 298 t, to complete 9/47

At Royal Sittwe Naval Yard (Sittwe):
S1: Idle
S0: LCT-19 laid down, receives 199 t, launched, to complete 8/47
D1: DD Agartala undergoes 15% refit, receives 228 t, completed.
FD0: Idle
Free Floating:
LCC Field Marshal Dhoni undergoes 25% refit, receives 437 t, completed.
LCT-18 receives 0 t, completed 5/47

Miscellaneous Small Craft Work

1 x 25 t Harbour Inspection Boat built
2 x 50 t MTB built
2 x 35 t LCM built


D. Transactions:

Nothing new.


E. Other notes:

Two hospital ships, ten coastal sloops, and eight minesweepers have been ordered from Nordmark. Delivery dates have not been confirmed.


F. Disposal Report:

CL Trincomalee deleted from service; scrapping pending
Submarines IX-1, Satarka, Savadhana deleted from service; scrapping pending
Submarine Nipuna assigned to training duties


G. Updated Order of Battle, End of Quarter

Note: X(Y) +Z = completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 2(0) + 0
Aircraft Carriers (CV): 5(0) + 1
Armored Cruisers (AC): 2(0) + 0
Cruisers (CL): 18(0) + 1, one other to be scrapped
Daakuui (DA): 4(0) + 0
Destroyers (DD): 49(0) + 3
Submarines (SS): 41(0) + 0, three others to be scrapped

Patrol and Escort Ships

Frigates (PF): 4(0) + 0
Paratraatii (PP): 24(0) + 0
Charavaahii (PC): 22(0) + 1
Survey Ships (PS): 2(0) + 0
ASW Launches (ASL): 66(0) + 0
Harbour Patrol Craft (PH): 51(0) + 0

Coastal Forces

Monitors (BM): 1(0) + 0
Motor Gun Boats (MGB): 11(0) + 0
Motor Torpedo Boats (MTB/MGB): 81(0) + 0

Mine Warfare

Minelayers (CM): 7(0) + 0
Minesweepers (AM): 22(0) + 0

Training Units

Aircraft Carrier, Training (AVT): 1(0) + 0
Heavy Cruiser, Training (CAT): 1(0) + 0
Paritraataa, Training (PPT): 4(0) + 0
Submarine, Training (SST): 1(0) + 0

Auxiliaries and Fleet Train

Boom Defense Vessels (ABD): 13(0) + 0
Depot Ship (AD): 13(0) + 1
Disaster Relief Ships (ADR): 2(0) + 0
Hospital Ships (AHO): 1(0) + 0
Cargo Ship (AK): 0(0) + 1
Oilers (AOL): 2(0) + 0
Oilers, Replenishment (AOR): 4(0) + 1
Meteorological Observation Ship (AOM): 4(0) + 0
Packet (AP): 2(0) + 0
Repair Ships (AR): 2(0) + 0
Strategic Sealift Transport (AST): 4(0) + 0
Harbour Tugs (ATH): 12(0) + 0
Ocean-going Tugs (ATO): 8(0) + 0
Salvage Ship (ATS): 2(0) + 0
River Hospitalboats (RH): 13(0) + 0
Generator Barge: 2(0) + 0
Distillation Barge: 2(0) + 0

Amphibious Assault Ships

Attack Cargo Ship (AKA): 1(0) + 1
Armed Transport (APD): 4(0) + 0
Landing Ship, Dock (LSD): 1(0) + 1
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Ship, Tank (LST): 5(0) + 0
Landing Craft, Tank (LCT): 9(0) + 1
Landing Craft, Tank (LCV): 9(0) + 0
Landing Craft, Medium (LCM): 28(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0