You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Tuesday, January 26th 2016, 10:32pm

Quarterly Report #97 for the SAE

SAE Quarterly Reports

No. 97 – January to March 1945


Transfers/Notes:


Third payment from China (1,100ts) for purchase and rebuild of a floatplane carrier


Factories:

27 factories total can be used.

Fixed factories

1 factory fixed to produce infrastructure points in 1945.

Flexible factories

25,761ts of material produced this quarter (26 factories).

0 factories will produce infrastructure points this quarter.

Material handling

143ts of material transferred from Q4/44.

308ts of material recovered from scrap yard.

26,212ts of material used this quarter.

239ts of material transferred to Q2/45.

Infrastructure points used this quarter

0,1pts put into an upgrade of the Type 4 dock in Montevideo to Type 4.5 for a total of 0,1pts/0,5pts at the end of Q1/45


Ships:

Minor vessels


Completed Units

24x UJ30-class ASW launch
24x UJ35-class ASW launch
16x UJ42-clas ASW launch
6x UJ44-class ASW launch

23x R31-class motor launch
8x R37-class motor launch
32x R42-class motor launch

26x S34-class motor torpedo boat
12x S36-class motor torpedo boat
12x S40-class motor torpedo boat

13x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
8x Seychelles-class minesweeper (Type 38)
7x Centaur-class minesweeper (Type 42)

12x Coastal-class minesweeper (Type 37)
12x Coastal-class minesweeper (Type 41)

2x Circe-class sloops
4x Polar II-class sloops
4x Pelican-class sloop

12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)
8x Mountain-class frigate (Type 40)

8x Bird-class light destroyer (Type 35)

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x Garcia-class river gun boat (Type 35)
2x General-class river gun boat (Type 37)
2x General-class river gun boat (Type 42)
2x Drudge-class river gun boat (Type 43)

2x Argonaut-class river monitors (Type 36)

On Trials

3x UJ44-class ASW launch
- UJ111 running trials until January 45
- UJ112 running trials until February 45
- UJ113 running trials until March 45

1x Centaur-class mine sweeper
- MS42-8 Hylaios running trials until April 45

1x Circe-class sloop
- Medusa running trials until May 45

3x RM44-class river monitor
- Kastor running trials until January 45
- Nestor running trials until February 45
- Talaos running trials until March 45

Ordered Units

2x Pelican-class sloop (11 month and 97ts material required per unit)
- Albatross laid down in Montevideo on a Type 1 slip in June 44, completed in April 45
- Shoebill laid down in St. Helena on a Type 1 slip in September 44, completed in July 45

4x UJ44-class ASW launch (1 month and 200ts material required per unit)
- UJ114 laid down in Rio Grande in January 45, completed in January 45
- UJ115 laid down in Rio Grande in February 45, completed in February 45
- UJ116 laid down in Rio Grande in March 45, completed in March 45
- UJ117 laid down in Rio Grande in March 45, completed in March 45

1x RM44-class river monito (1 month and 200ts material required per unit)
- Zetes laid down in Lüderitz in January 45, completed in January 45

Rebuilds/Refits/Repairs

1x Circe-class sloop (4 month and 38ts of material required)
- Euryale enters a Type 1 dock in St. Helena in December 44. The sloop will stay in the yard until March 45

Scrapping

18x R28-class motor launch (1 month total)
- R28-R29 & R32-R33 & R35-R44 scrapping in June 44 – 90ts received from hulls for Q1/1945
- R45-R48 scrapping in March 45 – 26ts received from hulls for Q4/1945

16x UJ26-class ASW launch (1 month total)
- UJ29 & UJ31 & UJ34 & UJ36 & UJ37-UJ48 scrapping in September 44 – 218ts received from hulls for Q1/1945

7x UJ30-class ASW launch (1 month total)
- UJ49 - UJ50 & UJ52 - UJ54 & UJ57 & UJ60 scrapping in February 45 – 96ts received from hulls for Q4/1945


Destroyers

Completed Units

8x Reptile-class torpedoboat (Type 35)

8x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
10x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
8x Fish-class destroyer (Type 38)

7x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
4x Weapon-class large destroyer (Type 36)

On Trials

1x Weapon-class large destroyer Type 28
- Longspear running trials until March 45

3x Nymph-class destroyer Type 27
- Pasithea running trials until March 45
- Lysianassa running trials until March 45
- Melite running trials until March 45

Ordered Units

6x Weapon-class large destroyer (Type 44) (11 month and 241ts material required per unit)
- DD44-1 Trident laid down in Durban on a Type 2 slip in April 44, completed in March 45
- DD44-2 Partisan laid down in Cape Town on a Type 2 slip in May 44, completed in April 45
- DD44-3 Glee laid down in Cape Town on a Type 3 slip in August 44, completed in July 45
- DD44-4 Bayonet laid down in Port Elizabeth on a Type 4 slip in January 45, completed in December 45
- DD44-5 Dagger laid down in Daressalam on a Type 2 slip in January 45, completed in December 45
- DD44-6 Stiletto laid down in Port Louis on a Type 2 slip in January 45, completed in December 45

Rebuilds/Refits/Repairs

3x Nymph-class destroyer Type 27 (6 month a 67ts of material required)
- Pherusa enters a Type 2 dock in Port Elizabeth in September 44. The destroyer will stay in the yard until February 45
- Ploto enters a Type 1 dock in Port Elizabeth in January 45. The destroyer will stay in the yard until June 45
- Polynoe enters a Type 2 dock in Port Elizabeth in March 45. The destroyer will stay in the yard until August 45

1x Weapon-class large destroyer Type 28 (3 month a 161ts of material required)
- Scythe enters a Type 3 dock in Durban in January 45. The destroyer will stay in the yard until March 45

Scrapping

None


Fleet Cruisers

Completed Units

4x Yaounde-class fleet cruiser (Type 19)
4x Libreville-class fleet cruiser (Type 21)
4x Rosario-class fleet cruiser (Type 22)
4x Aurora-class fleet cruiser (Type 24)
2x Arion-class fleet cruiser (Type 27)
3x Douala II-class fleet cruiser (Type 29)
2x Ajax-class fleet cruiser (Type 31)
1x Antenor-class fleet cruiser (Type 33)
2x Nampula II- fleet light cruiser (Type 36)
2x Charybdis-class fleet cruiser (Type 38)
1x Soweto-class fleet cruiser (Type 43)

2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser

1x Archer-class experimental fleet cruiser

On Trials

None

Ordered Units

3x CL43C-class fleet cruiser (18 month á 470ts material required per unit)
- Bhisho laid down in Buenos Aires on a Type 4 slip in February 44, completed in July 45
- Harare laid down in Douala on a Type 3 dock in July 44, completed in December 45
- Dodoma laid down in Buenos Aires on a Type 3 dock in October 44, completed in March 46

Repair/Refits/Rebuilds

None

Scrapping

3x CL16 Town-class fleet cruiser (5 month total)
- Santana scrapping from November 44 to March 45 in a Type 4 dock in Port Louis – 690ts received from hulls for Q4/1945
- Santa Fe scrapping from November 44 to March 45 in a Type 4 dock in Port Louis – 690ts received from hulls for Q4/1945
- Parana scrapping from January 45 to May 45 in a Type 2 dock in Daressalam – 690ts received from hulls for Q1/1946


Heavy Cruisers

Completed Units

4x Cape-class (Type 23)
2x Cape-class (Type 26)
0x Dragon-class (Type 29)
2x Hero-class (Type 33)
2x Vengeance-class

On Trials

None

Ordered Units

None

Repair/Refits

1x CA29-class heavy cruiser (11 month and 519ts of material required)
- Fafnir entering a Type 3 dock in Cape Town in August. Leaving the dock in November, the cruiser will stay in the yard until June 45

Scrapping

None


Capital Units

Completed Units

2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Radiance-class
2x Monarch-class
2x Thunderer-class
2x Leviathan-class

On Trials

None

Ordered Units

None

Rebuilds/Refits

None

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
0x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

On Trials

1x Gungnir-class coastal defence ship
- Gungnir running trials until May 45

Ordered Units

None

Rebuilds/Refits

None


Carriers

Completed Units

1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)
1x Asgard-class fleet carrier (Type 37)
1x Helspanth-class fleet carrier (Type 40)

2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)

1x Bölthorn-class floatplane carrier
3x Unicorn-class floatplane carrier
2x Wyvern-class floatplane carrier

On Trials

1x Thjazi-class escort carrier
- Thjazi running trials until February 45

1x CVL43B-class light fleet carrier
- Robert Westerhold running trials until May 45

Ordered Units

4x CV42C-class fleet carrier (40 month á 771ts material required per unit)
- Bahamuth laid down in Durban on a Type 4 slip in March 42, completed in June 45
- Marduk laid down in Montevideo on a Type 4 slip in July 42, completed in October 45
- Tiamat laid down in Durban on a Type 4 slip in January 43, completed in April 46
- Lilith laid down in Montevideo on a Type 4 slip in April 43, completed in July 46

1x CVL43B-class light fleet carrier (23 month á 608ts material required per unit)
- Paul Verhoeven laid down in Cape Town on a Type 3 slip in October 43, completed in August 45

Rebuilds/Refits

1x Thjazi-class floatplane carrier (8 month and 397ts of material required)
- Ymir enters a Type 4 dock in Durban in September 44. The carrier will stay in the yard until April 45

1x Lagonoy-class escort carrier (8 month and 397ts of material required)
- Lagonoy enters a Type 4 dock in Daressalam in October 44. The carrier will stay in the yard until May 45


Class A Submarines

Completed Units

3x J-class submarine
2x L-class submarine
8x M-class submarine
8x O-class submarine
2x Q-class submarine
8x T-class submarine

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Class B (Coastal) Submarines

Completed Units

13x K-class submarine
8x N-class submarine
8x P-class mine submarine
8x R-class mine submarine

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Landing Vehicles

Completed Units

1x LSC38-class landing ship (ex-AV22)
2x LSC39-class landing ship (ex-TD19)
2x LSA38-class landing ship
4x LST38-class landing ship
8x LSI38-class landing ship

On Trials

None

Ordered Units

3x LCFS45-class landing craft fire support (5 month á 50ts material required per unit)
- LCFS1 laid down in Douala on a Type 1 slip in January 45, completed in May 45
- LCFS2 laid down in Douala on a Type 0 slip in January 45, completed in May 45
- LCFS3 laid down in Libreville on a Type 0 slip in March 45, completed in July 45

18x LCP45-class landing craft (1 month á 10ts material required per unit)
- LCP1-6 laid down in Daressalam in January 45, completed in January 45
- LCP7-12 laid down in Daressalam in February 45, completed in February 45
- LCP13-18 laid down in Daressalam in March 45, completed in March 45

1x LST45-class landing sraft (1 month á 196ts material required per unit)
- LST5 laid down in Lüderitz in March 45, completed in March 45

Repairs/Rebuilds/Refits

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
2x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)
2x Bay-class tender (Type 42)

1x FV32-class fleet support ship
2x FV36-class fleet support ship

On Trials

2x FV43-class fleet support ship
- FV43-1 Sarah Bettens running trials until April 45
- FV43-2 Eva Briegel running trials until May 45

Ordered Units

1x APD45A-class fast transport (21 month á 552ts material required per unit)
- APD45A-1 Sloth laid down in Durban on a Type 1 slip in January 45, completed in November 45

Repairs/Rebuilds/Refits

None

Scrapping

None

--------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only, units undergoing refits are not listed):

70 ASW launches
63 motor launches
50 motor torpedo boats
60 minesweepers
2 minelayers
48 small patrol crafts
10 river gunboat
2 river monitors
84 TB/DD/DLs
44 fleet cruisers
10 heavy cruisers
20 capital units
3 costal defence ships
8 aircraft carrier
6 floatplane carrier
31 submarines category a
36 submarines category b
17 landing vehicles
19 armed tenders
3 fleet support ship

plus numerous auxiliary vessels of all kind.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

2

Tuesday, January 26th 2016, 10:36pm

LCP1-18, laid down 1945



Displacement: 10 ts standard
Dimensions: 11,45 m / 11,10 m x 3,50 m x 1,05 m
Armament: 2 - 7,62 mm gun
Machinery: Diesel Internal combustion motors, 280hp
Speed: 10 kn
Range: 150 nm
Complement: 4
Load weight: 4 ts or 36 troops


[The LCP Series 45 actually is a variant of OTL American LCVP crafts (Higgins Boat) which were historically build through the 40s. I use this design because SS can´t deal with light crafts.]

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

3

Tuesday, January 26th 2016, 10:38pm

LCFS1, laid down 1945

Displacement:
250 t

Dimensions:
49,51 m / 48,30 m x 7,10 m x 1,78 m

Armament:
1 - 75,0 mm guns in single mounts

Diesel Internal combustion motors,

Complement:
36 - 47

Cost:
$0,422 million

[Copy of OTL USN LCSL type landing craft]

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

4

Tuesday, January 26th 2016, 10:40pm

Sloth, laid down 1945


Displacement:
1.600 t

Dimensions:

93,06 m / 91,50 m x 11,50 m x 3,87 m

Armament:
1 - 4,92" / 125 mm guns in single mounts

Machinery:
Oil fired boilers, steam turbines,

Complement:
140 - 183

Cost:
$2,830 million