Iberian Naval Developments Q1, 1946
TL;DR
New Construction: 1 CV, 1 CA, 3 SS, 1 APA, 16 LCM
New Scrapping: 2 BB
New Refits: Lots of subs and gunboats
A. Industrial Allocation
24/24 factories producing materiel for shipbuilding = 24,000 tons + 5,699 t surplus + 928 t scrap = 30,627 t
Material Used: 19,767 t
Stockpiled Material: 10,860 t
0/24 factories (fixed) producing infrastructure materiel = 0.0 IP
0/24 factories (non-fixed) producing infrastructure materiel = 0.0 IP
B. Infrastructure Development
None.
C. Naval Construction
At Cadiz
No.1 type 5 slip: CV Cadiz laid down, receives 2,400 t, to complete 9/49
No.2 type 4 slip: Idle
No.3 type 3 slip: CA El Leon laid down, receives 1,932 t, to complete 12/47
No.4 type 2 slip: APA San Fulgencio de Cartagena, receives 300 t, launched, to complete 12/46
No.5 type 2 slip: APA San Vincente Ferrer laid down to civilian standards, receives 300 t, to complete 3/47
No.6 type 2 slip: Idle
No.1 type 4 drydock: BB Carlos V begins scrapping, materials to return 10/46, scrapping to complete 12/46
No.2 type 3 drydock: Idle
Dockside: LSD Vittoria receives 1,573 t, completed 2/46
At Barreiro
No.1 type 4 slip: CV Lisbon receives 2,400 t, to complete 12/48
No.2 type 3 slip: CL Daga receives 1,227 t, launched, to complete 12/46
No.3 type 3 slip: Idle
No.4 type 1 slip: SS SG-1 laid down, receives 250 t, to complete 10/46
No.5 type 1 slip: SS SG-2 laid down, receives 250 t, to complete 10/46
No.6 type 1 slip: SS SG-3 laid down, receives 250 t, to complete 10/46
No.1 type 5 drydock: BB Fernando II begins scrapping, materials to return 10/46, scrapping to complete 12/46
No.2 type 3 drydock: CV Cordoba begins 25% refit, receives 2,500 t, to completes refit 12/45
No.3 type 1 drydock: Idle
No.4 type 1 drydock: Idle
CL Sable receives 1,227 t, to complete 9/46
At Porto
No.1 type 4 slip: Idle
No.2 type 3 slip: Idle
No.3 type 3 slip: Idle
No.4 type 0 slip: Idle
No.5 type 0 slip: Idle
No.6 type 0 slip: Idle
No.7 type 0 slip: Idle
Dockside: APA San Longino receives 300 t, completed 3/46
Dockside: CL Arcabuz receives 1,227 t, to complete 6/46
Dockside: APA Isidro de Sevilla receives 300 t, to complete 9/46
At La Coruna
No.1 type 2 slip: Idle
No.2 type 1 slip: Idle
No.3 type 0 slip: Idle
No.4 type 0 slip: Idle
No.5 type 0 slip: Idle
No.6 type 0 slip: Idle
No.1 type 2 drydock: Sub refits
No.2 type 1 drydock: Sub refits
No.3 type 1 drydock: Sub refits
No.4 type 1 drydock: Sub refits
Dockside: LCT L-35 receives 0 t, completed 2/46
Dockside: LCT L-36 receives 0 t, completed 2/46
Dockside: APA Cornelio el Centurion receives 300 t, to complete 6/46
At Santander
No.1 type 4 slip: Idle
No.2 type 2 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.5 type 1 slip: Idle
No.6 type 1 slip: Idle
No.1 type 2 drydock: Idle
At Santiago De Cuba, Cuba
No.1 type 2 slip: Idle
No.2 type 1 slip: Idle
No.3 type 1 slip: AN N-15 receives 0 t, launched, to complete 7/46
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Sub refits
Dockside: AN N-13 receives 0 t, completed 1/46
Dockside: AN N-14 receives 0 t, to complete 4/46
At San Lorenzo, Honduras
No.1 type 4 drydock: Idle
No.2 type 1 drydock: Sub refits
At Panama, Panama
No.1 type 2 slip: Idle
No.2 type 1 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.5 type 1 slip: Idle
No.1 type 4 drydock:
No.2 type 2 drydock: Sub refits
No.3 type 1 drydock: GB refits
No.4 type 1 drydock: GB refits
Dockside: ATH H-29 receives 0 t, completed 2/46
Dockside: ATH H-30 receives 0 t, completed 2/46
At Luanda, Angola
No.1 type 1 slip: Idle
No.2 type 1 slip: Idle
No.3 type 1 slip: Idle
No.4 type 1 slip: Idle
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Sub refits
No.3 type 1 drydock: GB refits
No.4 type 1 drydock: GB refits
At Haikou, San Hainando
No.1 type 4 drydock: Idle
No.2 type 2 drydock: Idle
No.3 type 1 drydock: Idle
At Sanya, San Hainando
No.1 type 1 floating drydock: Idle
No.1 type 0 floating drydock: Idle
No.2 type 0 floating drydock: Idle
Other Construction
16 x LCM built, total cost 400 t
D. Transactions
Nothing
E. Other Notes
Sixteen Sb class submarines undergo 15% mid-life refit, receive 126 t each; eight docks used, two boats in sequence.
Eight C-61 gunboats undergoe 15% mid-life refit, receive 277 t each; four docks used, two boats in sequence
Six C-25 gunboats undergo 5% refit, receive 94 t each
Five BCS-1 submarine-hunters undergo 5% refit, receive 29 t each
Ten BCS-41 submarine hunters undergo 5% mid-life refit, receive 19 t each
F. Order of Battle
Note: W (X) +Y = In Service (under repair/refit) + building
Combattants
CV = 8 (0) + 2
BB = 11 (0) + 0
BC = 02 (0) + 0
CE = 04 (0) + 0
CA = 14(0) + 1
CL = 43 (0) + 3
DD = 98 (0) + 0
SS = 147(0) + 3
Patrol, Escort and Mine Warfare
Sloop (SL) = 112 (0) + 0
Corvette (CO) = 120 (0) + 0
Mine Warfare Ship (MWS) = 32 (0) + 0
Light Forces
MTB: 300 (0) + 0
MGB: 300 (0) + 0
Ampibious Forces
Landing ship (Dock): 3(0) + 0
Troopship (LSI): 7 (0) + 4
Tank Landing Ship (LST): 6(0) + 0
Tank Landing Craft (LCT): 36(0) + 0
Landing Craft Medium (LCM): 128(0) + 0
Landing Craft (LCI): 72 (0) + 0
Assault Boat (LCA): 48 (0) + 0
Fleet Train
Depot Ships (AD): 11(0) + 0
Hospital Ship (AH): 2 (0) + 0
Netlayer (AN): 13(0) + 2
Oiler (AO): 13(0) + 0
Repair Ship (AR): 2(0) + 0
Sealift Vessel (ASL): 2 (0) + 0
Harbour Tug (ATH): 30(0) + 0