Danish Naval Developments Q3 1941
a/ Industrial Allocation
11/11 factories producing materiel for shipbuilding = 11000 tons
0/11 factories (fixed) producing infrastructure materiel =0.0 points
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
None
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Idle
No.2 type 2 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.1 type 3 drydock – Idle
Dock side - Idle
Aarhus-
No.1 type 3.5 slip – Idle
No.2 type 2 slip – Idle
No.3 type 1 slip – Garrya, SL, laid down 01/07/1941, receives 496 tons, balance 1,283 tons
No.4 type 1 slip – Hedera, SL, laid down 01/07/1941, receives 496 tons, balance 1,283 tons
No.1 type 3.5 drydock – Falster, CL, receives 1494 tons, balance 4914 tons
No.2 type 2 drydock – Bornholm, CL, receives 1494 tons, balance 4914 tons
Dockside - Aegir, BB, laid down 21/03/1939, receives 2464 tons, balance 14,224 tons
Dock side – Thor, BB, laid down 01/07/1939, receives 1,904tons to complete
Dock side – Empetrum, SL, laid down 02/01/1941, receives 496 tons, balance 291 tons
Dock side – Fuchsia, SL, laid down 02/01/1941, receives 496 tons, balance 291 tons
Aalborg-
No.1 type 1 slip – Uf 13, SUB, laid down 01/07/1941, receives 250 tons, balance 655 tons
No.2 type 1 slip – Uf 14, SUB, laid down 01/07/1941, receives 250 tons, balance 655 tons
No.3 type 1 slip – Uf 15, SUB, laid down 01/07/1941, receives 250 tons, balance 655 tons
No.4 type 1 slip – Uf 16, SUB, laid down 01/07/1941, receives 250 tons, balance 655 tons
No.5 type 1 slip – Uf 17, SUB, laid down 01/07/1941, receives 250 tons, balance 655 tons
No.6 type 1 slip - Uf 18, SUB, laid down 01/07/1941, receives 250 tons, balance 655 tons
Dock side – Idle
Roskilde-
Wood yard- LTC 25, LTC, laid down 01/07/1941, receives 100 tons to complete
Wood yard- LTC 26, LTC, laid down 01/07/1941, receives 100 tons to complete
Wood yard- LTC 27, LTC, laid down 01/07/1941, receives 100 tons to complete
Wood yard- LTC 28, LTC, laid down 01/07/1941, receives 100 tons to complete
Phuket-
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
Berbera-
No.1 type 1 drydock – Idle
St. Thomas-
No.1 type 1 drydock – Idle
Guinea Bisseau-
No.1 type 1 drydock – Idle
d/ Transactions
None
e/ Other Notes
LTC 25 commissions on 30/09/1941
LTC 26 commissions on 30/09/1941
LTC 27 commissions on 30/09/1941
LTC 28 commissions on 30/09/1941
Ue 55 commences sea trials on 09/07/1941
Ue 56 commences sea trials on 09/07/1941
Ue 57 commences sea trials on 09/07/1941
Ue 58 commences sea trials on 09/07/1941
Ue 59 commences sea trials on 09/07/1941
Ue 60 commences sea trials on 09/07/1941
KDM Thor commences sea trials on 18/08/1941
KDM Calluna continues sea trials until 18/10/1941
KDM Dracaena continues sea trials until 18/10/1941
Uf 7 continues sea trials until 03/12/1941
Uf 8 continues sea trials until 03/12/1941
Uf 9 continues sea trials until 03/12/1941
Uf 10 continues sea trials until 03/12/1941
Uf 11 continues sea trials until 03/12/1941
Uf 12 continues sea trials until 03/12/1941
KDM Bornholm continues reconstruction (75%)
KDM Falster continues reconstruction (75%)
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 1659 tons
f/ Order of Battle
Note: X (Y) +Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 2/0 (0)
CDS = 04 (0) + 0/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 20 (2) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 62 (0) + 0/0 (0)
SL = 20 (0) + 4/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 00 (0) + 0/0 (0)
CGC = 48 (0) + 0/0 (0)
STC = 36 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
LTC = 28 (0) + 0/0 (0)
SUB = 69 (0) + 12/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
SRV = 03 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat/Escort
CGC = Coast Guard Cutter/Patrol Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
LTC = Large Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
SRV = Submarine Recovery Vessel