Italian Naval Construction Summary: 1944 Q1
Patria e Onore
Factories: Italy
25 Total factories.
25 Factories dedicated to production of 25,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP. 0 bonus IP for factory dedication.
Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.
Material Transactions:
859t rolled over from Q4/43
2000t from the East African State to Italy
27859 tons available for use
Naval Construction and Refit Report
Italy
OTO La Spezia
- Type 3 Slipway: Destroyer
Biagio Assereto layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q2/44 and estimated completion Q4/44.
- Type 3 Slipway: Destroyer
Benedetto I Zaccaria layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q2/44 and estimated completion Q4/44.
- Type 3 Drydock: Aircraft Carrier
Aquila drydocked for reconstruction: receives 2001t. 10005t of 12011t assembled. 2005t required, estimated refloating and estimated completion Q2/44.
- Type 3 Drydock: Cruiser
San Pietro drydocked for reconstruction: receives 1665t. 1665t of 6660t assembled. 4995t required, estimated refloating and estimated completion Q4/44.
- Type 1 Slipway
- Type 1.5 Drydock
Dockside:
Orlando Taranto
- Type 4 Slipway: Battleship
Dante Alighieri receives 3000t. 18000t of 45,275t assembled. 27275t required, estimated launch Q4/44 and estimated completion Q3/46.
- Type 4 Drydock
- Type 3 Slipway: Destroyer
Guglielmo Grasso layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q2/44 and estimated completion Q4/44.
- Type 3 Drydock
- Type 3 Drydock
- Type 1 Slipway
- Type 1.5 Drydock:
Dockside:
- Aircraft Carrier
Marcantonio Colona receives 2911t. 37911t of 37911t assembled. 0t required, completed. Trials begin Q2/44.
Napoli di Castellammare
- Type 3 Slipway: Destroyer
Simone Doria layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q2/44 and estimated completion Q4/44.
- Type 3 Drydock:
- Type 1 Slipway
- Type 1.5 Drydock
Dockside:
-Cruiser
Sardinia receives 1625t. 8125t of 9750t assembled. 1625t required, estimated completion Q2/44.
Marghera Fincantieri, Venezia
- Type 3 Slipway: Destroyer
Carlo Zeno layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q2/44 and estimated completion Q4/44.
- Type 3 Slipway: Destroyer
Lamba Doria layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q2/44 and estimated completion Q4/44.
- Type 3 Drydock: Cruiser
Giovanni Bausan drydocked for conversion to a aircraft carrier: receives 1478t. 7378t of 7378t assembled. 0t required, completed. Trials begin Q2/44.
- Type 1 Slipway
- Type 1 Drydock
Dockside:
-Cruiser
Sicily receives 1625t. 8125t of 9750t assembled. 1625t required, estimated completion Q2/44.
CRDA Trieste
-Type 4 slipway:
-Type 4 slipway:
Dockside:
-Armored Cruiser
Regina Elena receives 3000t. 27000t of 30000t assembled. 3000t required, estimated completion Q2/44.
-Battleship
Leonardo da Vinci receives 3000t. 27000t of 45,275t assembled. 21275t required, estimated completion Q4/45.
Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway:
- Type 3 Slipway:
- Type 3 Drydock: Cruiser
San Sylvestro drydocked for reconstruction: receives 1665t. 1665t of 6660t assembled. 4995t required, estimated refloating and estimated completion Q4/44.
- Type 1 Slipway
Dockside:
Fincantieri Cagliari
- Type 3 Drydock: Cruiser
San Gregorio Magno drydocked for reconstruction: receives 1665t. 1665t of 6660t assembled. 4995t required, estimated refloating and estimated completion Q4/44.
- Type 1 Drydock
Dockside:
East African State
Massawa
- Type 3 Drydock: Expanding
- Type 1 Slipway
- Type 1 Drydock
Dockside:
Mogadishu
-Type 1 Drydock
Scraping Report
No ships scraped
Ships on Trials
Destroyers:
Antonio Mosto,
Ippolito Nievo,
Francesco Nullo,
Simone Schiaffino
Cruisers:
San Calepodio,
San Calimero,
Francesco Ferrucio,
Coatit
Current Order of Battle: Italian Navy Note: May be incorrect with relation to encyclopedia. Will be revised to ensure commonality with encyclopedia for Q2/44 report pending encyclopedia revisions.
BB. 7(0)+2
CV. 12(1)+1
ACR. 9(0)+1
CL. 21(0)+2
DD. 68(0)+6
Submarines. 99(0)+0
Escorts. 122(0)+0
MAS. 70(0)+0
Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS
Infrastructure Projects
Summary of Expenditures
27685t out of 27859t used in Naval construction.
0t out of 27859t used in payments.
0 IP used in Infrastructure Projects
27685t expended Q1/44.
174t rollover to Q2/44.