You are not logged in.

1

Monday, June 30th 2008, 6:02pm

Republic of France, Q2/36

Posting for Agent148, as requested.

A. Industrial Allocation

25/27 factories to naval materials: 25,000 tons created for Q2/36. 0 tons saved from Q1/36, plus 0 tons from scrapping, for a total of 25,000 tons available.

2/26 factories (committed) to infrastructure development: 0.2 pts

0/26 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.

B. Infrastructure Development

Continue Class 1 Port at Chrouy Svay, Kampuchea. 2.2 pts added by Q2/36. 0.2 pts added in Q2/36. 0.6 pts remaining.

C. Naval Construction

At La Rochelle (Cl 5)
Class 4 Slip #1 - Battlecruiser Paris laid down 1/1/35. 11,535 tons added by Q2/36. 2,307 tons added in Q1/36. 27,676 tons remaining.
Class 4 Slip #2 - Battlecruiser Lyon laid down 1/1/35. 11,535 tons added by Q2/36. 2,307 tons added in Q1/36. 27,676 tons remaining.
Class 3 Slip #1 - Battlecruiser Dunkirque laid down 1 July 1934. 14,890 tons added by Q2/36. Launched 2 January 1936. 2,430 tons added in Q2/36. 14,675 tons remaining.
Class 3 Slip #2 - Battlecruiser Strasbourg laid down 1 July 1934. 14,890 tons added by Q2/36. Launched 2 January 1936. 2,430 tons added in Q2/36. 14,675 tons remaining.
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Zephyr class escort #1 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 2 Slip #2 - Zephyr class escort #2 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 1 Slip #1 - Jaguar class contre-torpillieur#1 laid down 1 January 1936. 500 added by Q2/36. 500 tons added in Q2/36. 1,000 tons remaining.
Class 1 Slip #2 - Jaguar class contre-torpillieur#2 laid down 1 January 1936. 500 added by Q2/36. 500 tons added in Q2/36. 1,000 tons remaining.
Class 1 Slip #3 - Jaguar class contre-torpillieur#3 laid down 1 January 1936. 500 added by Q2/36. 500 tons added in Q2/36. 1,000 tons remaining.
Class 1 Slip #4 - Jaguar class contre-torpillieur#4 laid down 1 January 1936. 500 added by Q2/36. 500 tons added in Q2/36. 1,000 tons remaining.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

At Brest (Cl 5)
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

Cruise liner Marianne being built in the private yard of Chantiers et Ateliers de St. Nazaire, expected to be completed by 12/37

At Cayenne (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - 2 gunboats laid down 1/1/36. 10 tons added to each by Q2/36. 39 tons added to each in Q2/36 to complete.

At Abidjan (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - 2 gunboats laid down 1/1/36. 10 tons added to each by Q2/36. 39 tons added to each in Q2/36 to complete.

At Marseilles (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Aircraft Carrier St. Cyr laid down 1/1/35. 8,800 tons added by Q1/36. Q2/36. 1,644 tons added in Q2/36. 18,160 tons remaining. ***
Class 3 Slip #2 - Idle
Class 2 Drydock #1 - Batttleship Lorraine rebuild begun 1/1/35. 9,000 tons added by Q2/36. 1,470 tons added in Q2/36 to complete.
Class 1 Slip #1 - Zephyr class escort #3 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 1 Slip #2 - Zephyr class escort #4 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Tunis (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Zephyr class escort #5 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 1 drydock #1 - Idle

At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Djibouti (Cl 2)
Class 1 Drydock - Idle

At Crozet Island (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Saigon (Cl 5)
Class 4 Drydock #1 - Idle
Class 1 Drydock #1 - Zephyr class escort #6 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 0 Drydock #1 - 2 gunboats laid down 1/1/36. 10 tons added to each by Q2/36. 39 tons added to each in Q2/36 to complete.
Class 0 Slip #1 - 2 gunboats laid down 1/1/36. 10 tons added to each by Q2/36. 39 tons added to each in Q2/36 to complete.
Class 0 Slip #2 - 2 gunboats laid down 1/1/36. 10 tons added to each by Q2/36. 39 tons added to each in Q2/36 to complete.

Chrouy Svay, Kampuchea (Cl 1 under construction)

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Zephyr class escort #7 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Zephyr class escort #8 laid down 1 January 1936. 293 tons added by Q2/36. 293 tons added in Q2/36. 585 tons remaining.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

At Papeete (Cl 3)
Class 3 Drydock - Idle

Launched ships being completed:
Heavy cruiser Algerie laid down 1/1/35. 6,020 tons added by Q2/36. 1,204 tons added in Q2/36. 2,405 tons remaining. At La Rochelle.

Heavy cruiser Tunisie laid down 1/1/35. 6,020 tons added by Q2/36. 1,204 tons added in Q2/36. 2,405 tons remaining. At La Rochelle. At La Rochelle.

Heavy cruiser Maroc laid down 1/1/35. 6,020 tons added by Q2/36. 1,204 tons added in Q2/36. 2,405 tons remaining. At La Rochelle. At Marseilles.

Heavy cruiser Syrie laid down 1/1/35. 4,816 tons added by Q1/36. 6,020 tons added by Q2/36. 1,204 tons added in Q2/36. 2,405 tons remaining. At La Rochelle. At Beruit.

D. Transactions

None

E. Other Notes
8 single turrets for 420mm guns completed, and Obukhov guns have been delivered. Concrete work is being completed near Saigon Indochina and Noumea New Caledonia, and the guns installed over the course of 1935-36.


22,138 tons expended out of 25,000 tons available.
2,862 tons saved.

12x 12" guns and 22x 140mm guns from the scrapped battleship Courbet being incorporated into coast defenses along the southern coast of Indochina.

12x 12" guns from the scrapped battleship Paris, and 8x 190mm, 16x 164mm and 12x 100mm guns from the scrapped armored cruisers Gloire and Conde incorporated into the coastal defenses at Papeete, French Polynesia.

22x 140mm guns from the scrapped battleship Paris and 16x 155mm and 12x 75mm guns from the scrapped aircraft carriers Normandie and Languedoc incorporated into coast artillery defenses in French Polynesia.

New coast defense guns now available:


- 108x 10mm AA guns in 54 twin mounts
18 being installed at Tunis

- 400x 40mm AA guns in 200 twin mounts
40 being installed at Tunis
40 being installed at Papeete
16 being installed at Noumea
24 being installed at Saigon

F. Ships being scrapped

None

G. Updated Order of Battle, 1 July 1936

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 7(0)+0
BC: 0(0)+4
CV:3(0)+1
CA: 6(0)+4
CL: 26(0)+0
Monitors: 5(0)+0
DD: 96(0)+4
Sloops: 0(0)+8
Fleet Submarine: 15(0)+0
Coastal Submarine: 70(0)+0

***Edited to correct math error on St. Cyr

This post has been edited 2 times, last edit by "AdmKuznetsov" (Aug 17th 2009, 7:31am)


2

Monday, June 30th 2008, 10:04pm

Nice to see France just lay down enough ships to increase their fleet strength at the top end by one third!

3

Monday, June 30th 2008, 10:22pm

Yes.

And the stockpile grew nicely too.

When Agent148 gets his sea-legs on France, he'll have a tidy pile to spend.

This post has been edited 1 times, last edit by "AdmKuznetsov" (Jun 30th 2008, 10:23pm)


4

Monday, June 30th 2008, 11:03pm

With the Algerie complete, France will only have 2 less CA's than Atlantis. Thats also a significant increase in numbers for France as well.